LOT C- Rahbe Girls Public School

PART 1
CIVIL, STRUCTURAL AND ARCHITECTURAL WORKS
Item Description Unit Quantity Unit Price $ Total Price $
1. SITE PREPARATION AND DEMOLITION
1.1 Demolishing and Removal of Debris
The works include all types of demolition and the removal of debris such
but not limited to:
Existing plastering and concrete items such as foundations, columns,
slabs, …etc
Tiling (floors and walls)
Toilet fixtures and pipes installation of all sizes
Counter tops, bases and sinks LS 1 $ -
Water tanks of different types
Hollow concrete block walls or concrete walls of all sizes
Proper cutting equipments to be used in opening of doors.
Demolition of the existing ramps / Stairs and the execution of the given
plans and specifications
Including the necessary equipments for the removal debris
etc…
Carried To Collection $ -
3 CONCRETTE WORKS
All concrete work in touch with the soil should be sulphate resisting cement Type V and all shuttering
should be plywood to ensure acceptable fairfaced concrete faces:
-Use vibrations during casting concrete
-All formwork for slabs and beams should be steel
-Cost of concrete to include materials, labors, steel reinforcement and casting
-Contractor should submit shop drawings as per the contract drawings
3.1.7 Ramp for Handicapped
Supply and cast reinforced concrete for handicapped ramp as per specifications and drawings with
respect to location, thickness and shape
Concrete should have 350kg/m3 of cement.
-Work to include:
-Formwork
-Materials m3 2 $ -
-Blinding concrete,footing, tie beams, retaining walls, floor …etc.
-Labors
-Steel Reinforcement
-Parapets
-Steel Handrails
-All needed work as per the Engineer instructions
Carried To Collection $ -
4 Masonry
4.1 Hollow or Solid Concrete Blocks and Clostra
Supply and install hollow or solid concrete blocks as per drawings
Work to include all places as per the drawings, location and the Engineer instructions.
Work to include:
-Materials
-Cement mortar and the use of extruded nets and reinforcement by means of metal gates and the
placement of angles of galvanized steel iron of concrete columns thickness of 4 mm every 60 cm
-Labors and all items needed and instructions by the Engineer

4.1.1 8 cm hollow concrete blocks m2 0


4.1.2 10 cm hollow concrete blocks m2 0
4.1.3 12 cm hollow concrete blocks m2 0
4.1.4 15 cm hollow concrete blocks m2 20 $ -
4.1.5 20 cm hollow concrete blocks m2 0
4.1.6 10 cm+Void+10cm hollow concrete blocks with layer of insulation m2 0
Carried To Collection $ -
5 METAL WORKS
5.1.1 Steel Work for openings (Doors and Windows)
Supply and install steel for internal or external opening as per drawings and specifications similar to the
existing for classroom and in the places shown on the drawings works to include:
-Complete shop drawings
-All materials
-Labours
-Epoxy paint
-All works as per the engineer instructions
5.1.1.1.a Provide single steel gate for the Classroom 01 at the ground level (110*220cm) No 1 $ -
5.1.6 Steel Ramp
Supply and install steel ramp as shown on drawings work to include:
Labour, material and installation
-4cm x 4cm steel angles with the beams and all necessary supports, all to be from galvanized steel
m2 10 $ -
members and the distance of the beams should not exceed 35cm
-Fix galvanized steel sheets 1.2mm thick
-Work to be done by experts
-All needed items as per the Engineer instructions
5.1.11 New Steel Sheds
Supply and install the steel Insulated of the sheds for covered playground and the shed of the entrance
as per drawings
Works to include:
-Complete shop drawings to be submitted for approval
-All Steel Items including heavy duty steel truss
-The excavation and footings
-Materials and type of covers
-Cover panel as indicated in drawings
-Water channel of galvanized steel (No Welded) and steel pipes for drainage
-Labors
-All needed items as per the Engineer instructions
5.1.11.1 Steel Sheds - insulated sandwish panel m2 20 $ -
5.1.14 Metal Handrail Works
New Metal Handrails
Supply and install metal handrail for stair and where needed as shown on drawings
Work to include:
-Materials
-Labors
-Putty and rubbing
-Paint
-All needed items as per the Engineer instructions
5.1.14.2 Wall Mounted m 10 $ -
Carried To Collection $ -
8 DOOR AND WINDOWS
8.2 Aluminum Doors and Windows
Fabricate, supply, and install aluminum works -aluminum material type SIDEM 2000 first choice with all
necessary accessories as per the drawings and the Engineer instructions, cost to include all doors and
windows:
-Reveals hard stone 3cm thick, all around for the external opening
-Single glass 6 mm
-Double glass 6-12-6 mm (Outer Glass should be Tempered)
-Hinges and locks
-Joint Filler
-Mosquito Screen
-Mesh
-All items needed as per the Engineer instructions
-All as specified and base on an approved shop drawings after exact dimensions
8.2.3 New Aluminum Internal Door
Supply and install an aluminum door with frame and related strengthening stud, Works to include:
Materials, and accessories
-Labors
-All needed items as per the engineer's instructions.
-Repair all around the opening

8.2.3.1a PROVIDE NEW ALUMINUM PARTITION DOOR AS INDICATED. D(1,2,3) m2 2 $ -


Carried To Collection $ -
9 FINISHES
9.1 Cement Plaster
Supply and install sand cement layers on concrete and Hollow Concrete Block works surfaces as
specified
The plaster layer should be on a base rough layer
The plaster works should be on level points (‫ ) ودع‬and each point should be at 1.5 m from the second
only
Work to include:
-Materials and accessories (galvanized, wire mesh, cover beds… etc)
-Labors
-All additional watering
-All tools
-Plaster thickness of more than 2 cm
-All needed items as per drawings and the Engineer's instructions
9.1.1 New Internal and External Plaster Works
Supply and apply one layer of sand cement plaster over a rough textured layer of plaster m2 40 $ -
Price included all accessories, material, scaffolding, and labor …etc.
9.2 Tiling Works
Supply and install all tiling items for floors, with the skirtings
Work to include all materials and labors and the Contractor should use all necessary rods and levels as
per the Engineer instructions
Price to include:
-Sand below tiles
-Materials, tiles, mortars
-Labors
-Rubbing
-Filling between tiles
-Filling the skirting
-Remove unsuitable items
-Cleaning the places
-All needed items as per the Engineer instructions
9.2.1 Full Mass Colored Ceramic for Floors
Supply and install anti skid colored full mass ceramic tiles for classroom (first choice) for all floor toilets, m2 6 $ -
kitchen and laboratory (existing and new)
9.2.2 Glazed Colored Ceramic for Walls
m2 22 $ -
Supply and install glazed colored ceramic for walls Include Ceramic Corner (first choice)
Carried To Collection $ -
9.5 Painting
9.5.1 Wall and Ceilings Paint Works
Wall paint includes preparing the surfaces and treating these surfaces so the surfaces be able to receive
the paints, and placing 3 layers of putty The paint should be of the best quality as per specifications and
as indicated in drawings (Grade 8 Room, Teachers Room, and New toilets Ceilings)
The surfaces should be smooth before the layers
The final layer to be applied after approval from the Engineer should be secured before starting the
final layer
All works and items should be as per the manufacturer and the Engineer's instructions and approval, All
paint types must be lead-free and Low VOC (Volatile Organic Compounds)
9.5.1.3 Oil Paint for new walls and ceilings m2 100 $ -
9.5.3 Paint Damp proof Colorless Layer Unleaded on Facades and Supply a Guarantee for Five Years
Supply and paint with damproof paint after cleaning and washing all walls, and remove the existing
paint and enlarge all cracks especially at the intersection of the hollow concrete blocks and reinforced
concrete slabs and between columns beams and hollow concrete blocks walls (4cm width with 5cm
depth) and refill these grooves with polyethylene sealant what ever their width and depth of these
grooves and then paint one layer of base paint with acrylic styrene copolymer elastomeric waterproof m2 120 $ -
with a fixation of 400% and dissolved by water and then apply two layers over the base paint with
acrylic styrene copolymer elastomeric waterproof and dissolved with water 10% and time needed is 24
hours between each layer.
All works and items should be as per manufacturer and the Engineer instructions and approval, all paint
types must be lead free and Low VOC (Volatile Organic Compounds)

Carried To Collection $ -
10 SPECIALITIES
10.1 Bathrooms Accessories:
-Supply and install all needed accessories and make good their places and their surroundings
-Place all frame, and cover joints (stainless steel) anti-corrosion
-Install items and their contact with the surfaces
-All works should be done as per the Engineer's instructions
10.1.1 Paper Roller Holder
Supply and install paper holder with no rust, no stain stainless steel 316 with all accessories and fixation
No 1 $ -
(anti-rust materials) for good quality and at the places shown on drawings
All works should be done as the Engineer instructions
10.1.2 Soap Dispenser
Supply and install stainless steel 316 no rust, no stain, soap dispenser wall type fixation (anti-rust
No 3 $ -
materials and accessories) with all needed items
All works should be done as the Engineer instructions
10.1.3 Paper Holder Box
Supply and install paper holder box from stainless steel 316 no rust, no stain, with all needed works and
fixation (anti-rust materials and accessories) No 3 $ -
The box should be from a good manufacturer
All works should be done as the Engineer instructions
10.1.4 Mirror for Lavatories
Supply and install 6mm glass mirror for lavatories with colored PVC frames as shown on drawings (New
toilets ) and as stated in the specifications with all needed items and accessories No 1 $ -
The mirror should be placed on 3mm thick plywood from the back
All works should be done as the Engineer instructions
10.1.5 Handicapped Bathroom Accessories
Supply and install all needed bars for the handicapped toilet of stainless steel 316
Work to include:
-Materials
-Labors
-and all needed items as per the Engineer instructions
10.1.5.1 Supply and install vertical grab rail 60cm bars No 1 $ -
10.1.5.2 Supply and install Horizontal grab rail 60cm bars No 1 $ -
10.1.5.3 Supply and install Drop Down Rail removable arm 80cm No 1 $ -
10.2.3 Signage
Supply and install sliding panel signs for all rooms high pressure laminate- HPL 1.2 cm thick movable
inside a stainless steel rail 316 fixed on walls, letters to be vinyl printed with engravement for special
need purpose, works to include:
No 22 $ -
-Materials
-Labours
-Colors and shape to be as per engineer instruction
-Dimension: 20cm x 10cm
10.3 Resin Work
Carried To Collection $ -
PART 2
MECHANICAL ENGINEERING SERVICES
3 SANITARY, WASTE & RAIN WATER PIPE WORK INSTALLATION
3.1 Drainage System inside the Building
Supply, install and test the stormwater drainage from (UPVC) pipes inside the building to outside, and
the pipes are to be measured in Linear Meters with all related accessories, cleanout, elbows, vent
hangers, and all necessary accessories as per standard installation details
The diameters of the pipes are as follows:
3.1.1 Ø 50 mm / UPVC m 2 $ -
3.1.2 Ø 75 mm / UPVC m 0 $ -
3.1.3 Ø 110 mm / UPVC m 2 $ -
3.2 Floor Drain
Supply and install floor drain P.V.C. with chrome plated brass drain cover and to be the same level as
the floor and do all necessary installation and connections. This includes all civil works and connection
to the proper floor pipes and as per the Engineer instructions
3.2.1 FD-01: Ø75 mm bottom outlet No 2 $ -
Carried To Collection $ -
4.2 Potable Water Piping
Supply and install pipes of PPR (API) food approved piping for drinking water with all necessary pipe
works and valves
Work to include all civil, and mechanical works and as instructed by the Engineer
4.2.3 Monolayer Ø 32 mm m 5 $ -
Carried To Collection $ -
9.2 W.C. For Non Kids
Supply and install W.C. for non-kids, Flush valve with cover as manufactured by Ideal Standard Item No.
E876801 also the hose, or approved equal and to be 40 cm from floor finish with timber cover.
The work includes the installation, liking, and cleaning with all necessary connections, angle valves and
necessary accessories similar to the K.G.W.C.
Each W.C. should be equipped with a Flushing Hose (Grohe or Ideal standard or approved equal)
9.2.2 EWC-02 (Wall Hang, handicapped - 70 x 36 cm) No 1 $ -
9.4 Lavatories for Non Kids
Supply and install semi pedestal wash basin similar to Ideal Standard Item No. 742001 or approved
equal and fixed at 82 cm high from the floor finish. Cost to include all necessary connections, angle
valves, traps, and necessary accessories as specified.
Semi Pedestal Wash Basin
9.4.2 LAV-02 (wall hang, handicapped with mixers 56 x 41 cm) No 1 $ -
9.6 Self-Close Taps on Kids & Students' Lavatories
Supply and install self-close taps to be fixed in the lavatory body as manufactured by Grohe Item No. 36-
173 with all required works and drain accessories including trap, and to be connected to the new water
supply and drain and as instructed by the Engineer
9.6.1 Taps No 2 $ -
Carried To Collection $ -
PART 3
ELECTRICAL ENGINEERING SERVICES
1.2 Fixing and Repairing
Check and repair all the existing cables, wires, socket outlets, lighting fixtures, lighting switches &
electric fans, and protect all exposed wiring as per the site conditions, and to the satisfaction of the LS 1 $ -
Engineer.
Lighting fixtures should be LED type
Carried To Collection $ -
4.2 Electrical Sockets
Supply, install and test single socket outlet, 230 Volt, 16 Amp, special children type, with all the
necessary protection. The cost includes conduits, cables, wires, and all accessories as per the drawings,
specifications and Engineer instructions.
4.2.5 16 Amp Simplex Water Proof No 2 $ -
Carried To Collection $ -
5 General Lighting Installations
5.1 Lighting Fixtures
Supply, install and test the lighting fixtures complete with all the necessary wires conduits, boxes and
accessories required to provide power to each lighting fitting from LP including the earth wire as per
the drawings, specifications and Engineer instructions.
The Contractor should submit samples of each lighting fixture for approval.
5.1.3 TYPE A2:600x600 mm LED Panel 3600lm - 33W - 4000K - 80CRI Surface-mount, Die-Cast aluminum with
No 32 $ -
IP20
Carried To Collection $ -
6 VENTILATION
6.2 Fans
Fans as specified and scheduled, including all ductwork connections via flexible connections, local
isolators, power and control wiring, dampers, attenuators, acoustic cladding to connections ductwork,
and inspection doors, identification and bonding and all sundry items including testing and
commissioning.
6.2.1 Wall Type 80m3/h to 190m3/hr No 2 $ -
Carried To Collection $ -
PART 4
ADDITIONAL WORKS
AW1 Supply and Install an ablution hose
supply and install an ablution hose of medium quality with a double angle valve (short tap + angle No 1 $ -
valve) - PWD toilet, Teachers' toilets
AW2 Supply and install a full External Electric Elevator
External Dimension: 170*190 cm, to be used by 2 passengers
Work to include:
-Steel Structure + Glass Materials
-Concrete (f'c=420 MPa)
-All structural steel columns and beams shall be ASTM A572 high strength low alloy structural steel (fy- No 1 $ -
420 Mpa)
-All civil works needed (hollow concrete block, concrete plaster internal external, paint internal
external, skirting, expansion joints, insulation, etc…
-Hydraulic Pistons, external Drive motor..etc..
The contractor shall submit a method of statement with the ITB.
Carried To Collection $ -
Total $ -