Professional Documents
Culture Documents
Extracted Project Drawings
Extracted Project Drawings
N
050332
2. FOR PACKAGE GENERAL NOTES REFER TO DRAWINGS
SMWSASBT-CPG-OHE-SF150-BS-DRG-050302 TO 050303.
1 WATERPROOFING. REFER TO SPECIFICATION 2 3. FOR SLAB REINFORCEMENT REFER TO DRAWINGS
SMWSASBT-CPG-SWD-SW000-TU-SPC-020201 SMWSASBT-CPG-OHE-SF150-BS-DRG-050325 TO 050327.
31700 4. FOR RC WALL REINFORCEMENT REFER TO DRAWINGS
SMWSASBT-CPG-OHE-SF150-BS-DRG-050351 TO 050352.
5. THE 75mm MEMBRANE PROTECTION SCREED MAY BE REPLACED WITH
EARTH TEST POINT CONNECTED TO WALL REINFORCEMENT.
PROPRIETARY PROTECTION BOARDS OR PROTECTED BY OTHER
REFER TO THE EARTHING AND ELECTROLYSIS PROTECTION
APPROVED MEANS IN ACCORDANCE WITH THE WATERPROOFING
PACKAGE DETAIL 7 AND THE EARTH ELECTRODE DETAILS IN
SPECIFICATION SMWSASBT-CPG-SWD-SW000-TU-SPC-020201. CHANGES
TABLE 3 ON SMWSASBT-CPG-SWD-SW000-EB-DRG-010204
MUST BE CAPTURED IN THE BULK EXCAVATION LEVEL IN THE
AND 010205 RESPECTIVELY.
TEMPORARY WORKS PACKAGE SBTGE0502.
MASS FILL RECESS IN TEMPORARY
TEMPORARY SHORING RETENTION REFER TO SECTION 03 BASE SLAB CONSTRUCTION NOTES:
STRUCTURE. REFER TO ON DRAWING 050355 1. DESIGN ASSUMES BASE OF STRUCTURE FOUNDING IN CLASS III SHALE
PACKAGE SBTGE0502. SURVEY MARKERS REQUIRED TO BASE SLAB FOR SWELL MONITORING. HAVING AN ULTIMATE GEOTECHNICAL END BEARING OF CLASS III
REFER TO SHEET SMWSASBT-CPG-OHE-SF150-BS-DRG-050303 FOR 20 MPa. BEARING CAPACITY IS BASED ON THE PROJECT WIDE GIR. ROCK
INSTRUMENTATION AND MONITORING NOTES. CLASS TO BE CONFIRMED BY THE APPROVED GEOTECHNICAL ENGINEER.
2. RECESS STRIP DRAINS INTO ROCK. REFER TO DRAWING
A SMWSASBT-CPG-OHE-SF150-BS-DRG-050365 FOR LAYOUT.
3. CAST 250mm MINIMUM, 10MPa NO FINES (PERVIOUS) CONCRETE.
W1
4. PLACE GEOTEXTILE AND WATERPROOF MEMBRANE OVER NO FINES
CJ CJ CONCRETE LAYER.
1280
1280
5. PLACE 75mm, 20 MPa PROTECTION SCREED OVER WATERPROOF
MEMBRANE (REFER TO NOTE 5 ABOVE).
6. PLACE REINFORCED CONCRETE BASE SLAB
2
7. TO REDUCE THE RISK OF ROCK BENEATH THE BASE SLAB FROM DRYING
-0
-0
HE
HE
OUT AND THEN REINITIATING SWELL IN THE LONG-TERM WHEN
8000
8000
-O
-O
GROUNDWATER REBOUND OCCURS, THE SUMP AT THE BASE SLAB SHALL
SM
SM
NEVER BE FULLY DRAINED OF WATER BY ENSURING THE LOWER PUMP
TRACK ℄ DISPLACER IS SET SLIGHTLY ABOVE THE BASE OF THE SUMP. REFER TO
DRAINAGE DETAILS ON SHEET 050366.
LL
RNA A.
R M A.
1. FOR MCO SETOUT POINTS AND LAYOUT REFERENCED IN THE FOLLOWING
L WA
CO
0 DI
I
LO 50 D
RC NOTES REFER DRAWING SMWSASBT-CPG-OHE-SF150-TU-DRG-050215 IN
2563
255
PACKAGE SBTGE0502.
WE
INTERNAL WALLS BY 2. ALL SETOUT DIMENSIONS FOR CIRCULAR WALLS AND BASE SLAB ARE
INTE
SSTOM CONTRACTOR BASED FROM THE CENTRAL MCO SETOUT POINT SOP01.
3. BASE SLAB TO BE POURED TO BASE SLAB LEVEL.
SSTOM WALL ℄ 4. TOP OF RC WALL TO BE POURED TO THE LEVEL OF MCO SETOUT POINT
SOP02.
5. PERIMETER WALL TUNNEL OPENING DIAMETERS ARE CENTRED ON THE
TUNNEL CENTRELINE. REFER TO THE SEGMENTAL LINING DESIGN - NORTH
6
-0
PACKAGE SMWSASBT-CPG-SWD-TU000-TU-PKG-020601 FOR TUNNEL
HE
-0
W1 CENTRELINES.
HE
W1
-O
-O
SM
SM
GENERAL ARRANGEMENT LEGEND:
A1 A
25200
CJ 700 CJ
050371 050331 DENOTES INSITU CONCRETE ELEMENT OVER
RC
03 900 SQ. OVERALL x 500 DEEP SUMP AT CENTRE DENOTES LOAD BEARING ELEMENT UNDER
050341 OF SLAB. REINFORCED AND INFILLED BY SSTOM
CONTRACTOR. REFER DETAIL ON DRAWING DENOTES SUMP IN SLAB THICKNESS
SMWSASBT-CPG-OHE-SF150-BS-DRG-050366.
0
-0
-1
DENOTES MINIMUM CLEARANCE OPENING (MCO). REFER
HE
HE
-O
-O
TO DRAWING SMWSASBT-CPG-OHE-SF150-TU-DRG-050215.
SM
8000
#
DENOTES SURVEY MARKER. REFER TO DRAWING
-#
14000
HE
SMWSASBT-CPG-OHE-SF150-BS-DRG-050303 FOR NOTES.
-O
LOWER MCO
SM
1280
1280
CJ CJ
RC WALL SCHEDULE
1 2 MARK THICKNESS COMMENTS
W1
63°
63°
EARTH TEST POINT CONNECTED TO WALL REINFORCEMENT. REFER TO THE SM-OHE-10 292025.661 6261280.081
EARTHING AND ELECTROLYSIS PROTECTION PACKAGE DETAIL 7 AND THE EARTH
ELECTRODE DETAILS IN TABLE 3 ON SMWSASBT-CPG-SWD-SW000-EB-DRG-010204 CJ CJ SURVEY MARKERS ARE 1D MEASUREMENT IN THE VERTICAL DIRECTION
AND 010205 RESPECTIVELY. ONLY. ID NUMBERS HAVE BEEN SET TO MATCH THOSE IN THE TEMPORARY
63°
63°
WORKS PACKAGE SBTGE0502 FOR MONITORING CONTINUITY.
54°
N28-150 EF
3000
3000
N32-150 EF
THE FINAL (INFILL) POURS.
N32-150 EF (LV) N32-150 EF
7. WALL REINFORCEMENT IS ON LAYER 1 (UNO).
N28-150 N28-150
N32-150 U-BARS (LV) 02 EF (LV) EF (LV) 06 07 8. LENTON P14 POSITIONAL COUPLERS TO BE USED FOR THE U-BARS AT
THE LOCATION OF CONNECTION BETWEEN SSTOM SLAB AND PERIMETER
050355 N32-150 U-BARS (LV)
N32-150 U-BARS 050356 WALL.
01 (LV)
050356 N32-150 U-BARS (LV)
9. ALL REINFORCEMENT MUST BE MADE ELECTRICALLY CONTINUOUS WITH
050355 CJ N28-150 EF
CROSS BOND WELDS. REFER TO THE EARTHING AND ELECTROLYSIS
CJ 6170 DIA. OPENING
CJ
N28-150 EF
6170 DIA. CJ N28-150 EF
N28-150 EF
03 PROTECTION PACKAGE DETAILS 2, 5 AND 10 ON
N28-150 U-BARS (LV) OPENING 050355 SMWSASBT-CPG-SWD-SW000-EB-DWG-010203 AND 010204.
N32-150 U-BARS (LV) 10. OPPOSING REINFORCEMENT LAYERS MUST BE ELECTRICALLY
N28-150 U-BARS (LV) N28-150 U-BARS (LV)
N32-150 U-BARS CONNECTED ALONG THE WALL EDGES AT 8m CENTRES MAX. REFER TO
N28-150 EF (LV)
N28-150 EF (LV)
N32-150 U-BARS (LV)
N36-150 EF
N28-150 U-BARS (LV)
08 REFER DETAIL 8 REFER DETAIL 8
N32-150 U-BARS (LV) (LV)
N32-150 EF (LV)
THE EARTHING AND ELECTROLYSIS PROTECTION PACKAGE SECTION B
ON SMWSASBT-CPG-SWD-SW000-EB-DWG-010203.
3000
3000
050356 N32-150 EF
SHEET 050356 SHEET 050356
RC BASE SLAB
04 11. TUNNEL OPENINGS IN WALL ELEVATIONS ARE MAXIMUM OPENINGS.
REFER RC WALL DETAILS ON DRAWINGS
N32-150 EF (LV) 050355
SMWSASBT-CPG-OHE-SF150-BS-DRG-050351 TO 050352 FOR ADDITIONAL
BASE SLAB LEVEL BASE SLAB LEVEL REINFORCEMENT AND TUNNEL SEGMENT INTERFACE.
RL 7.055 CJ CJ CJ RL 7.055 CJ CJ
CJ CJ N32-150 EF (LV) N32-150 EF
RC BASE SLAB
N28-150 EF LAYER 2 N28-150 (LV) STARTER BARS N36-150 EF LAYER 1
N28-150 (LV) STARTER BARS N28-150 U-BARS (LV) N28-150 U-BARS (LV)
FROM COUPLERS FROM COUPLERS N32-150 FF LAYER 2
LAP TYP.
N32-150 STARTER BARS 05 STARTER BARS FROM COUPLERS. N28-150 (LV) N32-150 STARTER BARS N32-150 (LV) STARTER BARS
N32-150 (LV) STARTER BARS
N24-150 SIDE
FROM COUPLERS 050355 TO MATCH VERTICAL STARTER BARS FROM COUPLERS FROM COUPLERS FACE THROUGH N24-150 SIDE
REINFORCEMENT SIZE & CENTRES FROM COUPLERS FROM COUPLERS
DEPTH OF WALL FACE THROUGH
DENOTES FUTURE RC WALL BY SSTOM CONTRACTOR. REFER DEPTH OF WALL
N28-150 (LV) STARTER BARS TO SHEET SMWSASBT-CPG-OHE-SF150-BS-DRG-050355 FOR
FROM COUPLERS ELEVATION 01 REINFORCEMENT INTERFACE WITH FUTURE RC WALLS, TYPICAL. ELEVATION 02
SCALE 1 : 100 - SCALE 1 : 100 -
CJ CJ
N36-150 FF (LV) WITH COUPLERS L-BARS TO FUTURE SERVICES SLAB BY SSTOM CONTRACTOR N36-150 FF (LV) WITH COUPLERS DENOTES FUTURE SERVICES SLAB BY SSTOM CONTRACTOR
A LAYER 2. 3000 LONG MAX. N36-150 FF WITH COUPLERS LAYER 2 LAYER 2. 3000 LONG MAX. B N36-150 EF STARTER BARS LAYER 1 WITH COUPLERS
N36-150 EF (LV) WITH N36-150 EF (LV) WITH
COUPLERS LAYER 1 N36-150 EF WITH COUPLERS LAYER 1 COUPLERS LAYER 1 N36-150 FF STARTER BARS LAYER 2 WITH COUPLERS
CJ CJ N24-150 SIDE
N24-150 SIDE FACE THROUGH
FACE THROUGH DEPTH OF WALL
N28-150 EF N28-150 EF DEPTH OF WALL
MCO CHANGE LEVEL MCO CHANGE LEVEL
RL 16.000 RL 16.000
N36-150 EF N28-150 U-BARS (LV) N28-150 EF N28-150 U-BARS (LV) N36-150 EF N28-150 EF
3000
3000
N28-150 EF
3000
3000
N32-150 EF
N32-150 EF N24-150 SIDE FACE
N32-150 EF (LV) N32-150 EF (LV)
N28-150 THROUGH DEPTH OF WALL
EF (LV) N28-150
N32-150 U-BARS (LV)
EF (LV)
N32-150 U-BARS (LV)
TYPICAL SIDE REO AROUND THE CIRCULAR OPENING
N28-150 U-BARS (LV) N28-150 EF CJ SCALE 1 : 100
03 CJ 6170 DIA. CJ CJ
6170
DIA. CJ
OPENING N28-150 EF NING N28-150 EF
050355
OPE N28-150 EF
N28-150 U-BARS (LV) N32-150 EF
N28-150 EF (LV)
N36-150 EF
N32-150 EF
REFER DETAIL 8 REFER DETAIL 8
3000
3000
SHEET 050356
04 SHEET 050356
RC BASE SLAB
050355
N28-150 (LV) STARTER N32-150 STARTER N28-150 (LV) STARTER BARS FROM N28-150 (LV) N32-150 STARTER
100mm AT FULL SIZE Plot Date & Time 15/08/2023 4:48:42 PM
BARS FROM COUPLERS BARS FROM STARTER BARS COUPLERS. TO MATCH STARTER BARS BARS FROM
COUPLERS FROM COUPLERS VERTICAL REINFORCEMENT FROM COUPLERS COUPLERS
SIZE & CENTRES VERTICAL LAYER 1
HORIZONTAL LAYER 1
A
02
VERTICAL LAYER 2
ELEVATION 03 ELEVATION 04 HORIZONTAL LAYER 2
SCALE 1 : 100 - SCALE 1 : 100 - FAR FACE HORIZONTAL LAYER 3
COVER
12161 12000 12161 12161 12000 12161
01
03
TIES
CJ CJ CJ CJ CJ
POUR 6 POUR 1 POUR 7 POUR 4 POUR 2 POUR 10 04
POUR 5 POUR 8 POUR 3 POUR 9 NEAR FACE VERTICAL LAYER 3
B
COVER
VERTICAL LAYER 2
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ HORIZONTAL LAYER 2
VERTICAL LAYER 1
ELEVATION 01 ELEVATION 02 ELEVATION 03 ELEVATION 04 ELEVATION 01
N
HORIZONTAL LAYER 1
NOTE - USE N40 SEPARATOR BARS AT 2m CENTRES TO SEPARATE
RC WALL KEY PLAN
WALL UPSTANDS BELOW THE TUNNEL INVERT ARE ASSUMED LAYERS IF NO SEPARATING REINFORCEMENT LAYER PRESENT. SCALE 1 : 300
TO BE POURED AFTER THE REST OF THE PERIMETER WALL.