Scope of Works:
• Installation of 5,042 point Deep Cement Mixing (DCM) twin shaft with 1600mm diameter per shaft
• Installation of 1,636 point Jet Grouting Pile (JGP) with various 600mm and 1400mm diameter
A lot of existing underground obstruction such as Prefabricated Vertical Drain (PVD) pipe were encountered
during our works which might impair the quality of soil treatment. We have carried out extra treatment to
ensure the quality of soil treatment.
• Height Restriction
Site location around 200 to 300 meter from Changi Airport runway, we facing straight airport regulation with
height , foreign object debris ,lighting and transportation