BUDGETARY QUOTATION

Ref: AMFD/BQ/1065R1
Date: 06/04/2024

To: M/s AZIZ INTERNATIONAL GLASS TRADING CO.


MARKETING CENTER
Jubail, Saudi Arabia.

Attn: Mr. Hussain azizinternational


Business development manager.

Subject: Shop drawing, Supply, fabrication, Powder Coat and installation at Site of CS Handrail & Wall Rails.
Ref: Your email RFQ dated: 22nd Mar 2024@RFQ for Hand Rail

Dear Sir,

Greetings!

We are pleased to submit this construction technical Commercial proposal in response to your Request
for quote (RFQ) for fabrication of CS handrail/Wall rail, We have developed this budgetary proposal specifically
for your stair case inquiry proposal provides an outline of the proposed solutions, schedule, technical approach,
and other essential details relevant for your project.

We look forward to working with you on this endeavor. If you have any questions regarding the proposal,
you can contact Us immediately.

SCOPE OF WORK:

● Shop drawing Preparation and submission for your review and approval.
● Supply of raw material from the local supplier/stockiest.
● Welding of CS pipe by using GMAW process.
● Required Resources mobilization to site and Demobilization from site.
● 100% Visual inspection of all welding joints by Al Fareji QC department.
● Surface preparation and Powder coating with RAL9016 (Traffic white) with ±85microns
● QC inspection and clearance by client QA/QC Inspector at Al Fareji.
● Submission of QC dossier with MTC, fabrication, welding inspection and Powder coat reports.
AZIZ Glass’s RESPONSIBILITY:

● Review and approval of shop drawing for the Handrail and Wall rail.
● Provision of required food, Accommodation and transportation for alfareji crew at site
● Provision of Electrical power supply, drink water, Rest room and site office for our site crew.
Page 1 of 4
● Provision of Site coordination focal person, safety officer and WPR at site.
● Provision of Gate pass for the Alfareji’s crew and tools /equipment.
● Final inspection and approval for the staircase at site.
MATERIAL SPECIFICATION:

● All Top rail ERW pipe from Ø1-1/2”x 3.68mm thk. / Sch.40 confirm to ASTM A 53 Gr.B.
● All Vertical Spindle ERW pipe from Ø1”x 3.38mm thk. / Sch.40 confirm to ASTM A 53 Gr.B.
● All Base plate Ø60x6mm / 4mm thk. conform to ASTM A36/S275Jr
● All Base Plate Cover Ø80x1.2mm thk. conform to ASTM A36/S275Jr
● All bend rod Ø12x150mm lg conform to ASTM A36/S275Jr
● All Ø8mmx80mm Stud anchor rod confirm to ASTM A36
● All Ø8mm Screw CSK confirm with plastic fisher.
REFERENCE DOCUMENTS:

● Architectural General arrangement drawing


Consideration details for the Handrails Assembly
Approx. Qty in One
Unit Weight in Kg / Total qty in Linear
# Description Building hand rail UOM Total building Qty Total Qty -Nos.
Building Mtr.(LM)
assembly
Ø40mm /1-1/2" x 3.68mm
1 24 L.Mtr 3.48 2000 48,000.00 0.00
Thk./Sch.40
Ø25mm/1" x 3.58mm
2 96 L.Mtr 1.80 2000 192,000.00 0.00
Thk./Sch.40
Ø40mm/1-1/2" x Sch.40 Elbow -
3 10 Ea. 1.97 2000 0.00 20,000.00
45°/90°

4 Ø60mm x 6mm Thk. -Base plate 90 Ea. 0.13 2000 0.00 180,000.00

5 Ø150mm x 1.5mm Thk. Cover 90 Ea. 0.21 2000 0.00 180,000.00

6 Ø8mm x 80mm Lg. Stud Anchor 180 Ea. 0.03 2000 0.00 360,000.00

Consideration details for the Wall Rail Assembly


Approx. Qty in One
Total qty in Total Qty -
# Description Building hand rail UOM Total building Qty
Linear Mtr.(LM) Nos.
assembly
Ø40mm /1-1/2" x 3.68mm
1 12 L.Mtr 2000 24,000.00 0.00
Thk./Sch.40
Ø40mm /1-1/2" x 3.68mm
2 8 Ea. 2000 0.00 16,000.00
Thk./Sch.40 end cap

3 Ø12mm x200mm Lg Rod 12 Ea. 2000 0.00 24,000.00

4 Ø60mm x 4mm Thk. -Base plate 12 Ea. 2000 0.00 24,000.00

Ø8mm Self CSK Screw with


5 24 Ea. 2000 0.00 48,000.00
plastic fisher
Page 2 of 4
BID PRICE – with Ex-works
Unit price Total Price
# DESCRIPTION Qty. UOM
SR. SR.
Shop drawing, Supply, Fabrication, Powder
1 coat handling and installation of CS handrail at 19,882 Mtr. 430.00 8,549,260.00
site as per the Reference drawing.
Shop drawing, Supply, Fabrication, Powder
2 coat handling and installation of CS wall rail at 22,734 Mtr. 75.00 1,705,050.00
site as per the Reference drawing.
TOTAL AMOUNT (SR) 10,254,310.00
(SR. TEN MILLION TWO HUNDRED FIFTY FOUR THOUSAND THREE HUNDRED TEN ONLY)
Notes
1. VAT will be applicable during invoicing as per the regulation.
2. Final length/weight will be recalculated after the shop drawing approval
3. Partial order not acceptable / the price to be revised for the based on the quantity
4. Current raw material price is valid for 12months, afterwards any increase in the raw material price it will be back charge to
Aziz’s Glass.
5. Any kind of manpower idle at site due to work stop by client (or) other reason idle hour will be charged with 2500SR/day.
6. Considered All the building stair shape/size and dimension are same for handrails and wall rails with horizontal with inclined
position only.

EXCLUSIONS

● Design and calculation.

Page 3 of 4
● Special painting/Fireproofing and Insulation.
● GI Pipe / Hot dip Galvanizing of structure
● Mechanical/chemical test.
● Any third-party inspection.
● Any kind of electrical, civil, instrumentation and commissioning work.
● Anything not mentioned in scope of work.

PERIOD OF PROJECT:

● Mutually agreed after PO issuance.

DELIVERY:

● To Riyadh Project Site.

PAYMENT TERMS:

● 35% advance along with PO.


● Progressive payment against as follows
1. 35% completion of fabrication and before material delivery from Alfareji yard.
2. 30% Completion of Installation at site with building wise submission of invoice.

VALIDITY:

Ten (10) days from the offer date.

We trust you will find our offer competitive and in order. In the event that you may require any further
clarifications / information please do not hesitate to contact us.

Thanking you,

Sincerely Yours
For TalaL Mohammed Alfareji Metal& Fasteners Division

_______________
George Mathew