IECEE OD-5003-F1:2021 © IEC 2021 –1– Ed.1.

2
Template (Provisional) Equipment List 2021-02-03

TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING


IEC 62275:2018

Cable management systems – Cable ties for electrical installations


Provisional

“R” Required
“S” May be subcontracted, see OD 2012
“SP” Specialized Facility, see IECEE 02-2
“W” Witness testing in the categories “MED” and “MEAS”
“3PPS” Three Phase Power Supply required

Equipment
Clause Measurement/testing Testing / measuring equipment / material needed
Classification
7.2 Check of markings Water, petroleum spirit, piece of close, test piston R

9.3 Minimum installation temperature test for Heating cabinet, Caliper, micrometer, test mandrels R
cable ties
9.4 Minimum operating temperature test for cable Heating cabinet, Caliper, micrometer, R
ties test apparatus for impact test, test mandrels
9.5 Loop tensile strength test Humidity chamber, Heating cabinet, Freezer R
Caliper, micrometer, test mandrels, Tensile pull test apparatus
9.6 Loop tensile strength test Humidity chamber, Heating cabinet, Freezer R
Caliper, micrometer, vibration test device, Tensile pull test apparatus
9.7 Mechanical strength test Heating cabinet, Test mandrels, Tensile pull test apparatus R
10 Contribution to fire Needle Flame Tester R
11.1 Resistance to ultraviolet light Xenon-arc ageing chamber,Humidity chamber R
Tensile pull test apparatus
Disclaimer: This document is controlled and has been released electronically.
Only the version on the IECEE Website is the current document version
Ed.1.2 –2– IECEE OD-5003-F1:2021 © IEC 2021
2021-02-03

Equipment
Clause Measurement/testing Testing / measuring equipment / material needed
Classification
11.2 Resistance to corrosion Salt spray test chamber, Humidity chamber R