Customer Success Story: Market segment

Pirkanmaa Hospital District Healthcare

New UPS and


supercapacitor technology
at the heart of hospital
Location: Background The most important reason
TAYS, Tampere University Hospital, “The most important for the installation of
The Pirkanmaa Hospital District
Tampere reason for the (PSHP) worked with Eaton
supercapacitor UPSs was for
their ability to enable peak
Challenge:
Peak shaving towards emergency
installation of to install modern UPSs with
supercapacitor technology
shaving for the generators and
the grid. As a bonus, they also
generators and grid supercapacitor UPSs to ensure uninterruptible
provide traditional UPS support.
operation of hospital imaging
Solution: was their ability for devices.
The power and back-up power
requirements in hospitals have
Three paralleled 300 kVA
Supercapacitor UPSs peak shaving. As In the first phase of the grown more critical alongside
project, Eaton Power Quality hospitals use of electric
Results: a bonus they also Oy, which manufacturers UPS equipment and ICT.
Continuation of operation is
of paramount importance and
provide traditional UPS equipment in Finland, delivered
one 300 kVA UPS with
“At first, we had planned to
use DRUPS devices, whereby
confidence in the functioning of support.” supercapacitors into Pirkanmaa
a diesel rotary generator
this technology is now proven. Hospital District’s cardiology
Juhani Jauhiainen, hospital engineer, powers a UPS. However,
Without the supercapacitors, department. In the second
Pirkanmaa Hospital District the reduced maintenance
this solution would not have phase, two more UPSs of the
from a supercapacitor UPS,
been chosen. same capacity will be delivered
combined with higher
to the hospital. All three UPSs
efficiency, convinced us to
will then be connected
take the opportunity that new
in parallel.
capacitor technology provides
During the project, the in feeding the demanding load
hospital also installed a further equipment.”
Eaton 300 kVA UPS with
“We trusted that a carefully
supercapacitors to secure
designed and manufactured
uninterrupted operation of
product would lead to a reliable
the Computed Tomography
solution. In addition, the
(CT) scan in the emergency
chance to replace traditional
department. Consequently,
lead batteries with new
the hospital will have a total
maintenance-free and longer-
of 1.2 MVA power from the
lasting technology contributed
supercapacitor UPSs.
to the decision.”
Hospitals always have back-up
Juhani Jauhiainen, hospital
generators available; in this
engineer, Pirkanmaa Hospital
case, PSHP’s UPS system
District.
will be fed by three 1 MVA
generators, if necessary.
Challenge Solution
Surgery in hospitals is Patient safety is everything.
performed with the support of Beyond the large UPSs,
CT, computer-based imaging there are imaging devices,
devices. Open surgeries are elevators, security systems
reduced all the time. This and other devices that need
emphasizes the role of the UPS protection. In the past,
UPS; if the surgeon’s operating the hospital’s imaging devices
screen goes blank during were not even connected to
surgery, it is impossible to the emergency generators
continue. The UPS supplies because of the power surges
the rated power of the CT that occur while doing
devices. At the same time, imaging, which could have
the supercapacitors supply jeopardized the entire electricity
the current peaks of the CT supply from the generator.
device imaging function and Consequently, this project has
thus also help the emergency delivered a huge improvement,
generator. “We are better able thanks to three large UPSs
to implement grid protection with supercapacitors that are
when we don’t need to take N + 1 connected, i.e. with
into account those CT peaks,” redundancy planned into the
says Jauhiainen. system.
The most challenging in Eaton was chosen largely
hospitals is to guarantee because of the hospital’s past
the 24/7 operation. Not all experience with the company,
activities require this, but so not to mention its heritage built
many systems do, that all over 56 years of making UPSs
activities need to be organized in Espoo (Finland). According
on their basis. Hospitals have to Jauhiainen, “Eaton was
operational processes that also chosen because of the
staff needs to manage and reliability of its UPSs and the
understand. This also means fact that their maintenance and
that choice of the device needs technical support have always
to be carefully considered, worked well and skillfully. There
in order to obtain functional, has always been help available,
manageable and practical when it was needed.” Results different electricity supplies,
systems. but it also has to be able to
Jauhiainen added that “It is Preventive maintenance as a
maintain the operations using
The hospital’s 24/7 operation also important that there is a philosophy is very important
power from the generators.
also poses challenges for high degree of domesticity in in hospitals. One cannot wait
technical personnel in terms that the closer the supplier’s for failures before starting The Eaton Power Xpert 9395P
of maintenance and testing. culture is to your own, the maintenance work. Advanced UPS with supercapacitors has
The planning of controlled more confidence you have in planning is very important; been supplying the CT imaging
one or two-hour breaks in the the supplier.” all service interruptions are for over a year now.
hospital’s power supply has agreed in advance so that
“We have positive experiences
to be done well in advance every member of the hospital
and have eagerly followed the
because of the reliance on IT team can be prepared for
operation of supercapacitors
equipment, which means that them. When the equipment
from the beginning of the
breaks must be planned in is needed it must work. The
installation. Because of the
accordance with surgeries and medical profession dictates that
cyclic nature of the load, we
other operations. Above all, patients should not be exposed
did not believe in battery power
the IT team must make sure to hazardous situations and it
in CT. Continuity of operations
there is no interruption of other does not make allowances for
is of paramount importance
functions at the same time, for extraordinary circumstances,
and the confidence in the
example if there is a controlled such as should the whole
functionality of this technology
power outage, there should be sub-region not have electricity
is now proven. Without a
no interruption to the heating or for days or even weeks. The
capacitor option, this solution
water supply at the same time. hospital must prepare for these
would not have been chosen,”
situations, despite their rarity.
said Juhani Jauhiainen.
Of course, the hospital has

Eaton
EMEA Headquarters
Route de la Longeraie 7
1110 Morges, Switzerland
Eaton.eu
Follow us on social media to get the
© 2019 Eaton Eaton is a registered trademark. latest product and support information.
All Rights Reserved
Publication No. CS153086EN All other trademarks are property
February 2019 of their respective owners.