IS 1489 (PART-1) : 2015

SHREE CEMENT LTD

SHREE GRINDING UNIT- SURATGARH

Near N.H.No.15 Village:-Udaipur Udasar Tehsil-


Suratgarh Ganganagar 335804 RAJASTHAN
PORTLAND POZZOLANA CEMENT

PPC Premium

Test & Compliance

SL No. Particulars REQUIREMENT OF IS 1489 (PART-1) : 2015 Test Result

CHEMICAL REQUIREMENTS

1 INSOLUBLE RESIDUE(% BY MASS) (X=%OF POZZOLANA USED) 30.92

2 MAGNESIA (% BY MASS) 6.0 % MAX 1.74

3 SULPHURIC ANHYDRITE (% BY MASS) 3.5 % MAX 2.69

4 TOTAL LOSS ON IGNITION(%) 5.0 % MAX 2.51

5 TOTAL CHLORIDE (%) 0.10 % MAX 0.010

PHYSICAL REQUIREMENTS

1 FINENESS (M2/KG) NOT LESS THAN 300 M2/KG 368

2 SOUNDNESS: LECHATLIER EXPANSION(MM) 10.0 MAX 0.50

3 AUTO-CLAVE(%) 0.8 MAX 0.043

4 SETTING TIME(MINUTES):INITIAL 30 MIN 130

5 FINAL 600 MAX 180

6 COMPRESSIVE STRENGTH (MPA):3 DAYS 16 MIN. 26.8

7 7 DAYS 22 MIN. 33.4

8 28 DAYS 33 MIN. 47.3

9 TEMP. DURING TESTING 27 +/- 2 DEG 0C 27

The cement complies with IS 1489 (PART-1) : 2015 for Despatched on 04.02.2024

Week no. : 5
Date : 08.03.2024

This is the computer generated output hence no signature is required.