Professional Documents
Culture Documents
MC 2010-018
MC 2010-018
SECTION I: REFERENCES
1. C, PNP approved Memo dated November 13, 2009, Subject: Proposed Camp
Crame Water Management Program (TAB “A”)
2. C, PNP approved Memo dated November 13, 2009, Subject: Proposed Camp
Crame Electricity Management Program (TAB “B”)
3. PNP Circular No. 2004-007 dated October 7, 2004, Subject: Policy on the Reduction
of Water and Light Consumption (TAB “C”)
4. Memorandum for C, PNP dated August 10, 2009 subject: Payment of Fixed
Expenditures Incurred by NSUs Outside Camp Crame (TAB “D”)
As Camp Crame continuously experienced high electricity and water consumption level
despite implementation of various national government energy management programs and
PNP-initiated ENERCON measures, the PNP management relentlessly applied possible
remedies to address these predicaments. These predicaments compelled the present
administration to conduct rigid research and study to avert such situation. Surveys in all tenant
offices hereat were conducted to discover real causes and apply real time solutions. The study
revealed that unconscious energy utilization was the main cause of the huge water and
electricity consumption. Among the indications of the unconsciousness are the
improper/abusive use of equipment and appliances (for electricity) and total disregard of leaks
and defective fittings (for water) within and outside PNP NHQ offices. These findings led to the
implementation of the Energy Management Programs inside Camp Crame which include the
improvement of distribution lines, installation of individual tenant office metering system at the
NHQ main building and implementation of this ideal consumption or the ceiling system for
tenant offices.
This circular sets forth the guidelines on the implementation of the Camp Crame
Electricity and Water Management Program (EMP). Likewise, this Circular outlines measures
relative to the implementation of the optimal consumption and/or ceiling system in every tenant
offices.
3. Every tenant electricity and water service connection shall pass each metering
system installed for the purpose.
4. Monthly consumption of each tenant offices should be within the allocated optimal
consumption ceiling. Otherwise, those tenant offices which exceed the allocated ceiling shall
shoulder the excess through deduction of their Miscellaneous and Other Operating Expenses
(MOOE).
6. Heads of tenant offices shall ensure the proper maintenance of its electricity and
water distribution system.
7. Informal quartering and business operation (i.e., xerox, vendo machines and other
acts utilizing fixed expenditure resources) inside offices and vicinities is strongly discouraged.
Otherwise, approval from the head of office is required.
SECTION V: TASKS/RESPONSIBILITIES
ODL
ODC
Withhold the fund equivalent to the EXCESS of the monthly allocated consumption by
any NSU. Said fund shall automatically become part of the fund intended for electricity and
water payments.
1. Heads of the various tenant offices inside Camp Crame are given the authority to
manage and regulate their monthly electricity and water resources.
2. To ensure that entrepreneurial activities shall not be allowed within their Area Of
Responsibilities (AORs).
HSS:
2. Shall conduct regular inspection in all electricity and water line facilities and caution
the concerned units/offices of any irregularity as provided in Section III of the PNP Circular No.
2004-007 dated October 7, 2004.
3. Shall ensure that unauthorized/no business permit operation inside the Camp shall
be disallowed.
4. Shall conduct monthly consumption reading on water and electricity meters, collect
payments and issue Disconnection Notice as provided in paragraph 1 to 4, Section IV PNP
Circular No. 2004-007 dated October 7, 2004;
5. Shall furnish the DC of the results of the meter readings including the equivalent
amount of the computed EXCESS of the monthly allocated consumption.
ES
2. Responsible in the overall inspection and evaluation of existing water and electricity
facilities as to their reliability.
The ERMOs shall be the primary overseer of the energy conservation measures and the
provisions of paragraphs 1 – 6, Section III of the PNP Circular No. 2004-007 dated October 7,
2004 and related circulars and issuances.
The amount deducted by the Directorate for Comptrollership from the MOOE of
concerned NSU/s which is equivalent to the excess of allocated monthly consumption ceiling
shall be utilized to augment the payments to water and electricity service providers as provided
in Section V of PNP Circular No. 2004-007 dated October 7, 2004.
Criminal, civil and/or administrative cases shall be filed against any person found
violating any provision of this circular.
MEMORANDUM
FOR : C, PNP
TDCA _________
TCDS __________
TDC ____________
FROM : TDL
1. References:
4. To fine tune this Circular, requests for inputs to various tenant offices were
disseminated. However, majority interposed no objection while others refrained to
comment.
MEMORANDUM
FROM : TDL
MEMORANDUM
FOR : TDL
DDL __________
Ex O __________
C, LRMD
FROM : C, IFMD
2. Expected to attend are the AOs and ERMOs of all tenant offices inside Camp
Crame totaling to 80 personnel.
3. ITCON, request fund allocation in the amount of Php5,000.00 for snacks and
other miscellaneous requirements.
CO YEE M CO, JR
Police Senior Superintendent