Professional Documents
Culture Documents
FF SD (b1 323) Shahida Parveen
FF SD (b1 323) Shahida Parveen
#3@12"C/C
2'
#3@8"C/C EW
SKYLIGHT ABOVE
6'-1"
BATH TUB TERRACE
9'-5"x5'-9"
#3@8"C/C
1'-9"
#3@9"C/C
EW #3@9"C/C
DRESS
5'-10"x6'-012"
BATH
S.C
10'-512"x6'-012"
1'-6" 3'
1'-6"
#3@12"C/C
#3@8"C/C
MASTER BED
12'-0 "x16'-3"
#3@5"C/C
4'-3"
2'
#3@12"C/C
#3@8"C/C
SITTING
16'-8"X11'-2"
2'-3"
#3@9"C/C
#3@8"C/C
#3@8"C/C
2'-3"
SKYLIGHT BELOW
KITCHEN
9'-8"x7'-1 12"
TERRACE
4'-9"
12'-0"x17'-6"
2'-6"
#3@5"C/C
2'-6"
#3@9"C/C
EW
#3@12"C/C
2'-6"
DWN
#3@7"C/C
BED
12'-0"x17'-3 12"
1'-9"
#3@10"C/C
#3@8"C/C
EW
#3@9"C/C
#3@12"C/C
#3@8"C/C
#3@8"C/C
BATH
5'-0"x11'-3"
#3@9"C/C
2'-9" 1'-6"
1'-6" 3'
#3@12"C/C
2'
MRS. SHAHIDA PARVEEN PLAN 6" THICK Q 2A- AES TH E TIC CO N SU LTA N TS IN T'L
OFFICE SUITE NO. 41 & 42, FIRST FLOOR, COMMERCIAL AREA, B-BLOCK, MODEL TOWN, MULTAN
EMAIL:QAEI.INFO@GMAIL.COM, QAEI@OUTLOOK.COM
Note:
As per standard Civil Engineering practice, the client is obligated to submit a duly signed document of inspection request for Design & quality check at each crucial stage of Formwork, Steel Fixing, and Pouring. The request must be
provided to the designated office personnel no later than 48-72 hours before the required stage of work, and must be accompanied by the requisite visit fee as agreed. Non-compliance with this protocol absolves the structural design
department of any liability for design defects in the event of structural failure. Construction defects in any case are sole responsibility of the contractor.
4'-6"
C-4 C-4
BEAM FFB-4
6'-1"
SKYLIGHT ABOVE TERRACE
BATH TUB 9'-5"x5'-9"
C-4 C-4
BEAM FFB-2
BEAM FFB-3
BEAM FFB-4
BATH
10'-512"x6'-012"
DRESS
5'-10"x6'-012"
S.C
SITTING
16'-8"X11'-2"
BEAM FFB-1
BEAM FFB-3
SKYLIGHT BELOW
KITCHEN
9'-8"x7'-1 12"
TERRACE
12'-0"x17'-6"
BEAM FFB-4
BEAM FFB-4
BEAM FFB-3
DWN
BED
12'-0"x17'-3 12"
OFFICE
11'-3 12"x10'-3"
BATH
5'-0"x11'-3"
PLAN OF FIRST
DHA SITE OFFICE, DHA DESIGN OFFICE, MULTAN.
E-mail: designoffice03@gmail.com
FLOOR
Q 2A- AES TH E TIC CO N SU LTA N TS IN T'L
MRS. SHAHIDA PARVEEN OFFICE SUITE NO. 41 & 42, FIRST FLOOR, COMMERCIAL AREA, B-BLOCK, MODEL TOWN, MULTAN
EMAIL:QAEI.INFO@GMAIL.COM, QAEI@OUTLOOK.COM
Note:
As per standard Civil Engineering practice, the client is obligated to submit a duly signed document of inspection request for Design & quality check at each crucial stage of Formwork, Steel Fixing, and Pouring. The request must be
provided to the designated office personnel no later than 48-72 hours before the required stage of work, and must be accompanied by the requisite visit fee as agreed. Non-compliance with this protocol absolves the structural design
department of any liability for design defects in the event of structural failure. Construction defects in any case are sole responsibility of the contractor.