Required materials
8 mm requird in nos 511 340 0 171
12 mm required in nos 129 58 58 71
Cement in nos 446 48 32 398
Sand in cft 1094 185 70 909
Metal in cft 1500 500 300 1000
40 mm metal 688 254 124 434
8mm dia : 0.395 kg/m
10mm dia : 0.617 kg/m
12mm dia : 0.888 kg/m
16mm dia : 1.579 kg/m
20mm dia : 2.467 kg/m
25mm dia : 3.855 kg/m
1024 625
Issue No. / Date: 02/01.11.2016 6.321 3.858
Interpolation
highest
point
REINFORCEMENT CALCULATIONS FOR THE COLUMN FOOTING, COLUMN UPTO BEAM HEAD
12 6 112.40 - - 674.40 - -
Edge Beams 1
8 749 1.25 936.25 - - - -
12 6 72.40 - - 434.40 - -
Edge Beams 2
8 483 1.25 603.75 - - - -
12 6 72.40 - - 434.40 - -
Edge Beams 1
8 749 1.25 936.25 - - - -
Lapping - - - - -
Total in m 2,476.250 - 1,543.200 - -
Total no of steel required 207.000 - 129.000 - -
0.389 0.617 0.888 - -
Weight of reinforcement(kg) 963.261 - 1,370.362 - -
Sl no Description N L B D
1 Drainage 1
a PCC 1 112.4 0.90 0.10
b Base 1 112.4 0.80 0.15
c Vertical wall 1 112.4 0.10 0.45
1 112.4 0.20 0.45
2 Edge beams
a Solling 1 257.60 0.20 0.20
b PCC 1 257.6 0.20 0.10
Concrete 1 112.4 0.20 0.45
2 72.6 0.20 0.45
10.3
5.15 34 86 172
10.12 67 169 337
13.07 87 218 435
0
188 473 944
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0