Download as pdf
Download as pdf
You are on page 1of 3
Construction Drawings - Review Questions Students also viewed lode Soto Construction ra. Trade Terms Giz mode 5 Jewish Museum Bet Dane Ubesk.Halga aan presen) OD rere reve) @ moronets vroien) Qe ‘Terms in this set (15) 7 kang at ow Wael vw abn eh and wah oe buicng andthe Noor ayut of he rooms called a ks too an pte 5) a evan ceaing 2 founton an potpian ac pan The line marked Ais called af a objecting b hidden tine «cutting plane tne ‘break ine hidden tine (Page 20) The material symbols marked B represents, common brick » aluminum c-rupble ‘common brick (oage 123) concrete The door or window symbol marked C represents sliding window (page 124) a. double-hung window ». bifold door ‘c casement window 4. sliding window “The electrical symbol marked D represents a acelin junction box » splitwired duplex receptacle «grounded receptacle 4d. waterproof receptacle splt-wired duplex receptacle (page 125) The plumbing symbol marked E represents a a. hose bib b. cleanout © shower head ‘d.wal-hung tolet shower head (page 127) The HVAC symbol marked F represents a, 2 supply duct b return duet « lower opening ‘linear citfuser supply duct (oage 128) ‘When used on ste (plo) plans the line marked & represents, property tie (page 186) a. gastine b. powerline ‘contour ine 4, property tine Wien used on ste (pit) plans, the symbol marked H represents benchmark (page 129) a property comer benchmark © required spot evaluation 4. storm sewer The dimension marked Ivepresents ameasurement made from. outside to center (page 131) wall to wal, center to center c outside to center outside to outside The distance required by bulding code from the streat to the front ofa structure is called a front setback (page 186) street easement b tront setback porch tine parkway Roofs plans provide a side view ofthe structure False (age 159) atwe False \Wihich three organizations worked together lo develop the International Building coae? BOCA, ICBO, SBC! (page 160-16) 4 1C80, BOCA, NFPA, b.SBCCL NFPA, ICBO & NFPA, BOCA, SBCCI 4. BOCA, ICBO, BCCI right triangle (age 162) The 5-4-5 rule, used when squaring @ Bulging based on the a isosceles triangle tight triangle equilateral tangle acute triangle 18-24-36 (page?) Which ofthe folowing triangles does not follow the 3-5 rule? 05-1475 228-55 68-26-36 4.15-20-25

You might also like