DEMOLITION AND SITE CLEARANCE

Tree stumps (300mm dia)


56.3m

15m high 10.0m


dia & 5m
concrete high
frame brickwall
25m

42.5m
25m
pipe

8m 200mm overhead pipe line

Trees (1.2m girth)


.
shrubs

98.6m

ROAD WORKS SITE PLAN DRAWING NO: SP/RD/002

Exercise:
The above drawing is situated within the demarcated zone of a proposed road between
Doti and Yeji. Measure for the entire site clearance and demolition works.