WELL NAME:

CT 204/ BK CTC-2 7 DAY OPERATIONAL FORECAST


DATE: 15-Dec-22
PVD I / Jack up Rig
POB: 115 Person
VIETSOPETRO
Thursday 15 Dec Friday 16 Dec Saturday 17 Dec Sunday 18 Dec Monday 19 Dec Tuesday 20 Dec Wednesday 21 Dec
0:00 Wait on cement harden enough 24 hours as required. 0:00 Pump 10 m³ of Hi -Vis then circulate hole clean. 0:00 Drill ahead 16'' hole section from 450m to +- 1100m as per DD instruction.
0:00 POOH for wiper trip to 20" casing shoe /280m. 0:00 Resume Drill 16'' hole section f/ 1800m to TD/2038m as per DD instruction.
0:00 POOH w/ 16" BHI Directional BHA on 5.5" DP to surface0:00 P/U, M/U & RIH 13-3/8" Casing as per tally to 2033m.
1:00 1:00 1:00 1:00 1:00 Pump 10 m³ of Hi -Vis then circulate hole clean & condition mud 1:00 1:00
2:00 Pick up, make up 16" Directional BHA and RIH to 282m as per DD. 2:00 POOH to surface for change out the tri-cone bit to PDC bit. 2:00 2:00 Pump 10 m³ of Hi -Vis then circulate hole clean & condition mud 2:00 2:00 2:00
3:00 3:00 3:00 3:00 POOH for wiper trip from to 1000m. 3:00 3:00 3:00
4:00 4:00 4:00 4:00 4:00 4:00 4:00 Circulate 110% of the casing volume. Make up cement head.
5:00 5:00 Re-make up 16" Directional BHA and RIH to 450m as per DD. 5:00 5:00 5:00 POOH for wiper trip from 2038m to 20" casing shoe. 5:00 5:00
6:00 6:00 6:00 6:00 RIH back to bottom, wash & ream down as required. 6:00 6:00 6:00
7:00 7:00 7:00 7:00 7:00 7:00 7:00 Cement job 13-3/8" casing as per programmed.
8:00 Drill out cement from 282m to 285m. 8:00 8:00 8:00 8:00 8:00 8:00
9:00 KOP & drill ahead 16'' new hole f/285m to 450m as per DD instruction. 9:00 Drill ahead 16'' hole section from 450m to +- 1100m as per DD instruction.9:00 9:00 Resume Drill 16'' hole section f/ 1800m to TD/2038m as per DD instruction.
9:00 9:00 Rig up 13-3/8" casing handling eqpmt. 9:00
10:00 10:00 10:00 10:00 10:00 10:00 P/U, M/U & RIH 13-3/8" Casing as per tally to 2033m. 10:00
11:00 11:00 11:00 11:00 11:00 RIH back to bottom, wash & ream down as required. 11:00 11:00
12:00 12:00 12:00 12:00 12:00 12:00 12:00
13:00 13:00 13:00 13:00 13:00 13:00 13:00 Flush with S/W and prepare for set 13-3/8" slip hanger.
14:00 14:00 14:00 14:00 14:00 14:00 14:00 Install the 13-3/8" slip hanger seal assembly, setting with 40 mt.
15:00 15:00 15:00 15:00 15:00 15:00 15:00 Rough cut the 13-3/8" casing landing string at wellhead.
16:00 16:00 16:00 16:00 16:00 16:00 16:00 Rig down 13-3/8" casing handling tool.
17:00 17:00 17:00 17:00 17:00 Pump 10 m³ of Hi -Vis then circulate hole clean & condition mud 17:00 17:00 Make up jetting tool. RIH and jetting well head and BOP
18:00 18:00 18:00 18:00 18:00 18:00 18:00 N/D Diverter & Overshot. N/D BOP system & Move to stump
19:00 19:00 19:00 19:00 19:00 19:00 19:00
20:00 20:00 20:00 20:00 20:00 20:00 20:00
21:00 21:00 21:00 Pump 10 m³ of Hi -Vis then circulate hole clean & condition mud 21:00 21:00 POOH w/ 16" BHI Directional BHA on 5.5" DP to surface 21:00 21:00
22:00 22:00 22:00 22:00 22:00 22:00 22:00
23:00 23:00 23:00 POOH for wiper trip to 20" casing shoe /280m. 23:00 23:00 23:00 23:00 Rig Welder final cut 13-3/8” Casing as required.
EQUIPMENT TO RIG EQUIPMENT TO RIG EQUIPMENT TO RIG EQUIPMENT TO RIG EQUIPMENT TO RIG EQUIPMENT TO RIG EQUIPMENT TO RIG

EQUIPMENT FROM RIG EQUIPMENT FROM RIG EQUIPMENT FROM RIG EQUIPMENT FROM RIG EQUIPMENT FROM RIG EQUIPMENT FROM RIG EQUIPMENT FROM RIG

(To Rig) PERSONNEL (From Rig) (To Rig) PERSONNEL (From Rig) (To Rig) PERSONNEL (From Rig) (To Rig) PERSONNEL (From Rig) (To Rig) PERSONNEL (From Rig) (To Rig) PERSONNEL (From Rig) (To Rig) PERSONNEL (From Rig)

0 0 0 0 0 0 0 0 0 0 0 0 0 0
Updated POB ……………………………………….
115 Updated POB ……………………………………….
115 Updated POB ……………………………………….
115 Updated POB ……………………………………….
115 Updated POB ……………………………………….
115 Updated POB ……………………………………….
115 Updated POB ……………………………………….
115
VESSELS VESSELS VESSELS VESSELS VESSELS VESSELS VESSELS

Thursday 15 Dec Friday 16 Dec Saturday 17 Dec Sunday 18 Dec Monday 19 Dec Tuesday 20 Dec Wednesday 21 Dec