MTP132-Daily Report 26b June 2023

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

TAILING MINE FILTRATION PROJECT

Site Installation Civil, Structural, Mechanical & Piping (CSMP)


PT. Agincourt Resources

Thursday, 22 June 2023

DAILY PHOTOGRAPH
PHOTOGRAPH

GENERAL ACTIVITIES

General Pre-start meeting Internal EMK TBM


CIVIL

Install LC formwork GL 1-2-3-4-5-6-7 Axis A Install LC formwork conduit switchroom

Continue PERI wall panel assembly Install horizontal wall rebar Axis A, GL 8-12

Install horizontal wall rebar Wall 1, Axis A LC conduit


Piping
TAILING MINE FILTRATION PROJECT
Site Installation Civil, Structural, Mechanical & Piping (CSMP)
PT. Agincourt Resources

Thursday, 22 June 2023

DAILY PHOTOGRAPH
PHOTOGRAPH

Joint no 68 HDPE pipe dia 90 PN10 Joint no 66 HDPE pipe dia 160 PN10

Joint no 67 HDPE pipe dia 160 PN10 Continue mobilize pipe spool HDPE

Joint no 68 HDPE pipe dia 160 PN10 Joint no 28 HDPE pipe dia 400 PN10

Continue fit up & mobilize HDPE pipe Joint no 29 HDPE pipe dia 400 PN10
TAILING MINE FILTRATION PROJECT
Site Installation Civil, Structural, Mechanical & Piping (CSMP)
PT. Agincourt Resources

Thursday, 22 June 2023

DAILY PHOTOGRAPH
PHOTOGRAPH

Joint no 30 HDPE pipe dia 400 PN10 Assembly HDPE pipe


Prepared by : Approved by :

Project Control