MBR PERMEATE PUMPS ISO DRG. - Rev - 0 - 171022 - SHT 4OF8

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEY PLAN

Date of Receipt .....................


A. Approved manufacture/construction may commence.
B. Acceptable subject to changes indicated. Resubmit for
approval but manufacture/construction may commence.
C. Amend as comments indicated and resubmit for approval.
D. Comments noted in letter/memo attached to forwarding
transmittal Nr........dated.............Ammend as comments
indicated and resubmit for approval.
E. Ammend as comments indicated resubmit for record.
F. Comments noted in letter/memo attached to forwarding
transmittal Nr........dated.............Ammend as comments
indicated and resubmit for approval.
G. Drawing of this category is for information and hence not
required to be approved.
H. Returned without review
Approval of drawing / documents dose not absolve Contractor /
vendor from any responsibilities for their accuracy or for the
design, performance and safety of the plant / work or any
other obligations under the contract and Indian Statutory Laws
nor dose it limit the employer's rights under the Contract.
For KIADB For NJSEI

Checked by...................................Date........................

Verified by....................Date.....................

Reviewed by (Water Cell).....................................Date..................

Reviewed by (ACDO) .................................... Date.........................

Approved by

Chief Development Officer & Chief Engineer..............................

Date..........................

SRI SRINIVASA CONSTRUCTION INDIA PVT. LTD


M/s JYOTI BUILD TECH PVT LTD. (JV)

X X
g f
KARNATAKA INDUSTRIAL AREAS DEVELOPMENT BOARD

Y W
NJS ENGINEERS INDIA PVT. LTD

40 MLD TERTIARY TREATMENT PLANT AT NARASAPURA, KOLAR

TITLE
DATE : 17.10.2022

DRAWN : Seema MEMBARANE TANK OUTLET TO PERMEATE TANK INLET

CHKD :
(SHEET - 4 OF 8)
SA

APPRD : NTS
SSCIPL-JBTPL/KIADB/TTP/NAR/MECH/23-7

You might also like