PS02 - 10 of 12

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

814 150

730 150

880

N17 N21

45 ° DETAIL OF - N17 964

45°
DETAIL OF - N21
N18 100 100
100 100
N22

1062
1180
DETAIL OF - N18

SUPPORT ID QTY(NOS)
SUPPORT ID QTY(NOS)
POS-0101-305-171-RFD-15316 1 DETAIL OF - N22
POS-0212-304-73-VA-16001 1

BILL OF MATERIALS ASSY QTY : 1 BILL OF MATERIALS ASSY QTY : 1


NOTES:
Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark (kg/m) (mm) (kg) (kg) Mark (kg/m) (mm) (kg) (kg) 1.ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
Assembly Qty. Assembly Qty.
2.ALL MATERIALS FOR PIPE SUPPORTS SHALL BE A36 / S275JR / S355JR / EQ UNLESS
N17 1 HEB100 20.4 880.00 17.95 1 17.95 S275 N21 1 HEB100 20.4 964.00 19.66 1 19.66 S275 OTHERWISE MENTIONED IN THE DRAWING.
3. ALL PIPE SUPPORT DRAWING SHALL BE PREPARED AS PER THE EXCEL SHEET DIMENSIONS
N18 1 HEB100 20.4 1062.00 21.66 1 21.66 S275 N22 1 HEB100 20.4 1180.00 24.07 1 24.07 S275
& DOCUMENT-301-00-PI-SPC-00057.
Total 39.61 Total 43.73 4. ALL WELDS ARE "BUTT WELD" AND CONTIINUOUS WELD UNLESS
OTHERWISE INDICATED

FOR FILLET WELDS SEE DETAILS BELOW

732 150
970 150
882

WELD ON BOTH SIDES WELD ON ONE SIDE


a =0.5 X E min a =0.7 X E min
N23
N19 1120 REFERENCE DRAWING

45°
S.NO DOC.NO REMARKS
DETAIL OF - N19
45°

DETAIL OF - N23
1 301-00-PI-SPC-00057

0 ISSUED FOR APPROVAL INB 19.01.2024 SA 19.01.2024

REV By Date By Date


N20 DESCRIPTION
MARK CREATED CHECKED
140 140
PROJECT TITLE :
N24
North Field East Project
100 100
Onshore LNG Facilities
1413
CONTRACTOR :

1064
DETAIL OF - N24

SUB CONTRACTOR :
ALMANA STEEL STRUCTURES CO W.L.L
DETAIL OF - N20
P.O.BOX NO.40990
DOHA-QATAR
SUPPORT ID QTY(NOS) PH:+974-4600809
SUPPORT ID QTY(NOS)
POS-0001-305-171-RFD-15316 1 EMAIL : almanagroup@almanagroup.com
POS-0101-304-99-WU-17503 1 web:www.almanagroup.com

SCALE : PROJECT NO. : J812


BILL OF MATERIALS ASSY QTY : 1 BILL OF MATERIALS ASSY QTY : 1
PROJECT SUPPORT MARK SHT SIZE REVISION
Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark Assembly (kg/m) (mm) (kg) Qty. (kg) Mark Assembly (kg/m) (mm) (kg) Qty. (kg)
NFE1 PS02 10/12 A2 0
N19 1 HEB100 20.4 882.00 17.99 1 17.99 S275 N23 1 HEB140 33.7 1120.00 37.74 1 37.74 S275
N20 1 HEB100 20.4 1064.00 21.70 1 21.70 S275 N24 1 HEB140 33.7 1413.00 47.62 1 47.62 S275
Total 39.69 Total 85.36 Ope. Center Doc No.

You might also like