Name of Inspection Date: Contractor: Equipment No: Location :
S No. Descripti Yes No Remark
on s 1 Check for any crack / Damage in the Cutting blade. 2 Check the presence of guard which covers 1/2 of Cutting blade 3 Ensure the water is filled in the tank before starting the machine. 4 Check the condition of wheels, whether it is free from damage / cracks. 5 Check the handle condition whether the rubber grip is free form damage. 6 Check the presence of Industrial type plug with proper neutral earthing. 7 Check the presence of dust guard (Rubber Mat) 8 Check the condition of bolt-nut in the direction pointer.
Remarks
Contractor's Contractor's HSE Client/PMC
Electrician Representative Representativ e Signature: Name: Date: