PART A – External Development Works 1 Boundary Wall o Block work / RCC finished boundary wall throughout the periphery of the school premises with concertina wire on top. o Elevation side of the boundary wall should be mutually agreed decorative type boundary wall to suit façade of the building. o Minimum height of the hard wall should be 1.8 m and 0.75 m concertina wire on top. 2 Entry / Exit gate o There will be two separate electronically operated sliding gates for Entry and exit to allow school buses & vehicles. o There should be provision of pedestrian gate beside Entry / Exit. o Both Gates will be provided with security cabin and canopy. 3 School Entrance o Entrances to cover with canopy on top and Natural stone or similar finished porch & steps flooring, Non slip flooring ramp for Handicap accessibility with SS railing. 4 Ancillary structures o Driver rest room and maid rest room with in built toilet. o HT Yard, Pump room as per authority requirement. 5 External Area finishing o Footpath all along the facility for the easy and & Parking safe access of pedestrian traffic. o Footpath from Entry/Exit gate to building and block to block should be covered with tensile roof. o Interlocking paver blocks for levelled surface with provision of underground sewage & storm water network and underground service crossings up to building inlet point for provision of external incoming utilities / services. o Parking with interlocking paver block with lot marking. Provision of total car parking according to the local regulation and area of the parking to be covered with tensile roofing. o Internal Road to be provided with Tar or cemented. 6 Student Drop off point o Entrances to cover with canopy on top and Natural stone or similar finished porch & steps flooring, Non slip flooring ramp for Handicap accessibility with SS railing
GIIS I Page 1|6
7 School External LOGO o Integrate Back lit school logo at two locations as per mutually agreed space, design & location. 8 Play Area o Playfield with Synthetic turf, the area will be specified as per the Architect’s design proposal. o Basket Ball / Tennis/ Badminton court with synthetic turf. o Running track Certified synthetic rubber system with EPDM granulated top layer o Provision of Sandpit for kindergarten students of mutually agreed size. o Kids Play Equipment’s for the Pre-primary students with EPDM flooring. o Cricket practice pitch with M S cage and outside nets at mutually agreed space. o Fully Functional Outdoor / Indoor type swimming pool with changing rooms, mutually agreed size as per space allocation. 9 External MEP & Power o Underground water tanks meeting capacity of Connection water calculations & design for domestic and Fire along with lifting & fire pumps. o Provide of bore well with necessary lifting pumps and R.O plant for drinking water supply. o Overhead tanks for storage of water for at least three (3) days capacity. o Adequate (including potable) water supply. o External Hydrant ring with hose boxes confirming to local governing fire codes. o Power supply connection on the name of Lessee including necessary authority sanction & Electrical infrastructure works as per design demand load. o DG power back up with auto switch panel as per the design load requirements. o External Electrical lights to achieve minimum 15 - 20 LUX level. o Provision of Sewage Treatment plant and rainwater harvesting as per design & norm, Storm and Sewage network. o Underground service network to facilitate internal / external services works and connections, viz, Data, power, water, CCTV etc. 10 Landscaping & o Landscaping work as per mutually agreed irrigation design, plantation of trees along compound wall & irrigation system. PART B – Building Development Works 1 Building Structure o Building delivered in an air and water tight condition as per the Design and Plan of the Building approved by the Lessee’s Architect in the manner set out in this MOU – Schematic drawings to be shared by Lessee.
GIIS I Page 2|6
o Building Orientation to maximise the natural sunlight o Clear Floor to Floor height should be min. 3.6 Meters. o Building ventilation system should comply with the local codes’ & all windows to be protected with MS grill or equivalent for the safety of students. o Clear floor to floor height 4.5m from floor finish to ceiling for 1st storey, 3.5m clear from floor to floor for upper storeys, Minimum 2.4m clear height for car parking, Minimum 4.5m clear for bus parking. o Floor Loading: 5 KN for typical floor use. 7.5 KN for kitchen or heavy load area. 2.5 KN for carpark. 2 Façade Treatment o The building will be finished in combination of modern High glass panels & ACP or equivalent with textured paint on plaster to external walls. Glass used will be Saint Gobain or equivalent, Single glazing. South/West – Double glazed as per Façade design by Lessee’s Architect. 3 Drop Off Area / o Flooring: Interlocking pavers or Equivalent. Entrance o Subsoil drain to be designed by contractor’s geotechnical engineer where required. o The canopy at drop-off area should be 4.5m clear height as per façade design. o Vertical Green, water features like water fall & integrated school logo with featured wall. 4 Entrance / Reception o Flooring – Engineering stone flooring of approved shade. o False ceiling – Combination of wooden & Baffle ceiling and paint finish. o Wall finish - Skim coat plaster and paint finish with combination of wooden Panels. o Lighting: LED lights/ feature lights. General Teaching Area 5 Classroom o Size of the classroom shall be complying with CBSE byelaws. o Classrooms to achieve the minimum require acoustic standard for each classroom. o Maximum build in fixed wall cabinets with sliding boards to be provided for storage of teaching materials & interactive unit (Teachers wall Unit) and student lockers within the Classroom. o Wall: Plaster and Emulsion Paint. o Ceiling: 600 X 600 Gypsum board with combination of LED lighting to achieve 500 Lux and ceiling fans.
GIIS I Page 3|6
o Flooring: Homogenous Non-Slip Tiles/ engineer stone tiles min 800 X 800. o Power Points: To facilitate teacher’s desk, interactive board and ancillary use. o Data Points: Provision of min. 4 points for teacher, interactive board & Wi-Fi. o At mutually agreed places for the area admeasuring approx. 8000 SFT classrooms are to be shared by means of foldable / sliding partitions to encourage interaction with other classes to create group learning communities. Special Teaching Area 6 Montessori Lab and Art o Maximum build in fixed wall cabinets with & Craft studio sliding boards to be provided for storage of teaching materials & interactive unit (Teachers wall Unit) and cubby holes. o Wall: Plaster and Emulsion Paint. o Ceiling: Combination of 600 X 600 grid & Gypsum board with LED lighting to achieve 500 Lux and ceiling fans. o Flooring: 5mm thk. Anti-static sports flooring / wooden flooring. o Power Points: To facilitate teacher’s desk, interactive board and ancillary use. o Data Points: Provision of min. 4 points for teacher, interactive board & Wi-Fi. o Toilet and wash basin. 7 Band Room, Dance o Wall: full height fabric panel with acoustic Studio, Music Room, result of minimum STC-50. and Choir Room etc. o Ceiling: Acoustic Ceiling which complies with STC-50 or other appropriate standards. o Flooring: Timber Strip/ Carpet floor with appropriate acoustic standards. o Mirror at one wall with 12 mm thick wood backing and SS railing. o Build in fixed wall cabinet for the storage of equipment’s and teaching material. 8 Library o Wall: Emulsion Paint, o Ceiling: Combination of commercial type suspended Grid tile (600x600mm) & Gypsum board and LED lights. o Flooring: Carpet floor/soft flooring. 9 Audio video, o Wall: full height fabric panel with acoustic Multipurpose hall, result of minimum STC-50. Indoor Sports hall & o Ceiling: Acoustic Ceiling which complies with Auditorium. STC-50 or other appropriate standards. o Flooring: Raise floor and Timber Strip/ Carpet floor with appropriate acoustic standards. o Multipurpose hall to provide green and inbuilt toilets.
GIIS I Page 4|6
10 Science Labs o Wall: Emulsion Paint, o Ceiling: Commercial type suspended Grid ceiling (600x600mm), o Flooring: Thick Heavy Duty Anti-Static Vinyl / Vitrified tile (800 X 800). o Working Platform with sink, tab cock, and under platform storage with high gloss laminate as per Lessor design. o Power point provision as per platform design. 11 Office Area o Wall / Partitions: gypsum / Glass partition with door, gypsum plaster punning with luster Paint, o Ceiling: Combination of Wooden / Baffle, Gypsum board & commercial type grid ceiling (600x600mm), o Flooring: Carpet or Engineered tiles. o Lights : LED & Featured lights. o Fixed type build in furniture as per design. 12 Canteen o Wall: Emulsion Paint, o Ceiling: Plaster and Emulsion Paint with T5 lighting and ceiling fans, o Flooring: Homogenous Engineered Tiles. o Wash Basin: Counter with sensor base basin tabs. 13 Server room & IDF/ o Walls : Emulsion paint, LAN rooms o Ceiling: Gypsum board grid ceiling (600x600mm), o Flooring: Thick Heavy Duty Anti-Static Vinyl or raised floor for the easy cabling from bottom 14 Staircase & Corridors o Wall: Plaster and paint, o Ceiling: Plaster and paint finish, o Flooring: Non-slippery Homogenous Tiles with nosing, o Railing – RCC pardi with provision of SS grab bar two levels for younger & older kids. o Provision of Fire Exits confirming to local norms. 15 Public Lift Car o Wall: timber laminated finish with specialist detail o Ceiling: timber laminated finish with specialist detail o Flooring: Vinyl flooring 16 Service Lift Car o Wall: Stainless Steel mirror finish o Ceiling: timber laminated finish with specialist detail o Flooring: Non slippery Homogenous Tiles with accent tiles (10% of the total lobby area). 17 Toilet Bank o Provision of number of toilet sanitary fixture & handicap toilets to be confirming as per local authority regulation for handicap toilet. o Wall: Covered with Dado tile. o Ceiling: Metal grid ceiling (600x600mm), o Flooring: Non-Slip ceramic tiles.
GIIS I Page 5|6
o All fitment including pedestal WC and counter wash hand basin to be installed at heights that cater to average height students as well as smaller lower primary students. o The sanitary appliances and fittings installed shall be of heavy-duty classification. o Ventilation: Mechanical ventilator & wall fans near wash basin. M & E works 18 HVAC System o Entire Premises should have Air Conditioned with centralize BMS control system o Indoor Temperature should be at 23.5 + 1oC o Relative Humidity < 65% o Car parking: Naturally ventilated. For basement carpark: Mechanically ventilated system o Toilets: Mechanical Ventilation system. o Other Ventilation system should comply with local codes’ requirements. 18 Electrical o Electrical network of the entire building including electrical points in all areas on each floor. o Light Fittings – Led suspended ceiling and spot, task lights to follow Lux level requirement as per local codes. 20 Fire Fighting & Safety o Fire Detection system Viz. addressable Smoke security detector and alarm system. o Fire Fighting system as per Local authority norms. o Public Address system – indoor and outdoor includes entire premises and rooms divided in multiple zones. o CCTV: To cover internal, external, entry & Exit points and each blind spot of the campus. 21 Data Points o Data & Voice networking works as below o Class room : 4 data points, o Special rooms : 6 data points o Admin Office area and teachers working space: each work table will have one data, one voice and 0.5 redundant data point. o Corridor to provide data points for Wi-Fi system. 22 Drinking water points o Drinking water point for students each floor as per requirement. o Provision of local RO for water purification counter base tap supply system.