H
orizontal BIM”… “Heavy BIM”… UTLOOK: 79% of current non-users feel
O
■■
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
Stephen A. Jones leads 19 years in creative, marketing MHC’s market research group, serves as a member of the
McGraw-Hill Construction’s and management roles with including MHC’s thought Princeton University Civil and
(MHC) initiatives in BIM and design firms, most recently as a leadership initiatives in areas Environmental Engineering
integrated project delivery as Principal and Board of Directors such as green building, BIM, Advisory Council. He is a
well as developing alliance member with Burt Hill (now interoperability, innovation visiting professor with the
relationships for technology and Stantec), a large, global and global construction University of Reading’s School
content. Active in numerous architectural and engineering markets. Bernstein was of Construction Management
industry organizations, he firm. Jones holds an M.B.A. one of the team members and Engineering in England,
frequently speaks at events from Wharton and a B.A. from involved in launching MHC’s where he also serves on their
around the world about the Johns Hopkins. GreenSource magazine. Innovative Construction
business impact of emerging Previously, Bernstein served Research Centre Advisory
technologies and trends. Before Harvey M. Bernstein, as President and CEO Board. Bernstein has an M.B.A.
joining MHC, Jones was a F.ASCE, LEED AP has been of the Civil Engineering from Loyola College, an M.S.
vice president with Primavera a leader in the engineering Research Foundation. He has in engineering from Princeton
Systems (now Oracle), a leading and construction industry for written numerous papers University and a B.S. in civil
provider of project management over 30 years. Currently, he covering innovation and engineering from the New
software. Prior to that, he spent has lead responsibilities for sustainability and currently Jersey Institute of Technology.
TABLE OF
CONTENTS
04 Executive Summary
04 Executive Summary
06 Recommendations
07 Data
8 BIM Usage
8 BIM Usage on Infrastructure Compared to All Projects
9 BIM Expertise
10 Current Implementation of BIM in Infrastructure
11 BIM Implementation Trends for Infrastructure
12 BIM Implementation by Project Type
13 BIM Implementation by Organization Size
20 Business Benefits
20 Assigning Value to BIM Benefits
Front Cover: Image courtesy of MWH Global. Opposite Page Left: Image courtesy of Mortenson Construction. Opposite Page Right: Image courtesy of EllisDon
39 Non-Users
39 Non-User Profile: Organization Type
40 sidebar Comments by Users: Converting Non-Users to Adopt BIM for Infrastructure
41 Non-User Profile: Organization Size and Location
42 Non-User Profile: Project Type
43 Non-User Attitude Toward BIM for Infrastructure
44 Non-User Forecast: Importance of BIM to the Infrastructure Industry in Five Years
45 AEC Perception: BIM Use by Competitors for Infrastructure
This page:
Left: Mortenson Construction’s
Renewable Energy Group models
its wind farm projects.
Right: VivaNext Bus Rapid
Transit System project in
Toronto is using BIM.
CONTENTS
53 Looking Ahead
53 BIM Value for Infrastructure Projects in the Future
54 Where Help Is Needed
Case Studies
14 Use of BIM on Road and Highway Projects
16 Use of BIM on Airports
18 Use of BIM on Transit Projects
29 Use of BIM on Dams, Canals and Levees
37 Use of BIM on Water and Wastewater Facilities
38 Use of BIM on Energy Projects
51 Use of BIM on Park and Recreation Projects
60 Methodology
61 Resources
McGraw-Hill Construction 3 www.construction.com SmartMarket Report
Executive Summary
BIM Adoption and Level of Use Will Increase
at a Rapid Pace for Infrastructure Projects
The level of BIM adoption and use in the infrastructure sector is a few years
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
They experience benefits that impact their projects internally-focused benefit for A/E firms and contractors.
as well as benefits that improve the internal business
functions of their organizations. BIM for Infrastructure Has a Positive
Return on Investment (ROI)
PROJECT BENEFITS 67% of all BIM users report a positive ROI for BIM use on
infrastructure projects.
■■ educed conflicts and changes during construction is
R
unanimously cited as the number one project benefit OI has a powerful correlation with BIM expertise.
R
■■
for all participants, both currently and five years out. Those characterized as BIM experts comprise 43% of
the group that reports high ROI (50% or greater).
■■
objectives in order to meet its particular needs in the design and construction
ecosystem. Below are insights drawn from the report for different players.
Architects and the depth, accuracy and experience. Join local BIM break down when authorities
Engineers consistency of the data user groups and attend having jurisdiction (AHJs)
Embrace collaborative now available to generate national events where you require traditional 2D
modeling as the new kinds of documents for will meet a wide variety documents for review. Some
most effective way to daily use at the site. Often of BIM users, almost all AHJs are accepting models
unambiguously convey your incorporating information of whom will gladly share in addition to 2D documents
team’s design intent and help from several sources (e.g., advice and perspectives as a way to clarify intent in
keep unscrupulous bidders GIS, laser scans, BIM), with you. the process of evaluating
from taking advantage of the reflecting existing conditions compliance. This is a good
discrepancies, errors and and providing a shop- Advanced and way to start moving up the
omissions that are inevitable drawing level of detail, Expert Users learning curve of dealing
in 2D drawings. Also, these are true “construction Don’t get complacent. As with modeled data, and your
leverage BIM’s powerful documents,” meant for more companies adopt feedback will help to create
visualization capabilities to precise implementation by and implementation an appropriate deliverable.
engage your clients more craft practitioners in the field. accelerates, innovation will
deeply in the solution-finding Infrastructure projects can distinguish the leaders. Your Non-Users
process, and align their benefit just as greatly. current capabilities may be Lack of demand is a leading
expectations more closely unique and successful, but reason for non-adoption,
with realistic outcomes. Fabricators competitors will be actively but marketing BIM capability
How much more can trying to surpass you. to win new work (rather
Owners you make offsite? How than waiting to be asked)
Demand more from your much more can you Technology is the top internal benefit
teams and drive out preassemble prior to final Companies being enjoyed by users. This
ambivalence. Even for installation? The accuracy Invest the time to understand indicates that the longer you
public projects, where of models is enabling an the characteristics of wait to adopt BIM, the greater
you must take the lowest offsite manufacturing and infrastructure work that the gap will grow between
responsive bid, you can prefabrication revolution differ from buildings and you and these competitors.
still require modeled in the vertical construction don’t assume your solution Start small, stay focused and
deliverables in your scope industry, especially with will apply equally well to any commit to the process of
throughout the process, ever-larger structural and project. Seek out direct input change. It should pay off.
as several federal and MEP assemblies. Cost, from the firms currently
state entities are currently safety, quality and timeliness engaged in this field and All BIM Users
doing. The project-related all benefit. Help extend tailor your tools to meet Support data standards
benefits of model-based this innovative trend to the their needs. and demand data
design and construction infrastructure sector. interoperability. The
accrue directly to owners Regulatory more quickly we can
and are compelling. BIM Beginners Authorities create a cohesive, data-
Keep the faith. Although Every day, more companies rich environment without
Contractors initial projects may be upstream from you are technology barriers, the
Get BIM to the field. Vertical challenging, the data show developing and working faster the entire industry
project users have made that benefits and ROI accrue with data-rich models. The will enjoy the benefits of
huge strides in leveraging in relation to increasing process and the benefits digital transformation. ■
I
n recent years, Building Information Modeling (BIM) has become
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
leading to its slight growth through 2010 while the other segments of the owners and a few other
industry declined dramatically. Now, however, as commercial construction respondents that do not
improves, increased austerity in the public sector and funding uncertainty fall into the other two
due to partisan politics during an election year are driving the volume of categories listed above,
infrastructure work down. such as consultants
In addition, as infrastructure financing becomes scarcer and the need and educators. (13%
for infrastructure improvements continues to grow, the industry has begun of total)
to explore alternative financing and delivery methods for infrastructure
For a fuller description of
construction, such as public-private partnerships. Collaboration is often a
the study participants and
critical part of these strategies, and BIM is well recognized in the construction
details on when the survey
industry as a process that enables collaboration.
was conducted, please
In order for organizations doing infrastructure work to remain competitive,
see the Methodology on
they will need to increase the efficiency and the profitability of their projects.
page 60.
Many of these organizations are also involved in vertical construction and have
seen the benefits of BIM firsthand, and they are just beginning to recognize its
value for infrastructure. This period of early adoption of BIM for infrastructure
offers an extraordinary opportunity for organizations to become adept at using
BIM and reap the rewards ahead of other industry players.
While many organizations have been using BIM on Length of Time Using BIM
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
1–2 Years
■■
5 Plus Years
■■
Variation by Player
Among the most highly experienced (five or more years) BIM
user group, architects show the greatest disparity between
those using BIM on all projects (45%) and on infrastructure
(18%). This is likely due to longer-standing BIM use by
architects on vertical projects. This conclusion is further USE_Q13Q13A
supported by the finding that only 3% of architects reported
one year of BIM experience on all projects, compared to 29%
that are novices in using BIM for infrastructure work.
The lag in experience with BIM for infrastructure
among the group having the greatest overall experience
with BIM again supports the conclusion that BIM for
infrastructure is lagging a couple of years behind its
adoption in vertical construction.
BIM Expertise
In lieu of an industry standard for BIM expertise—and BIM Expertise: All Project Types
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
OWNERS
Owners report the lowest expertise across both project BIM Expertise: Infrastructure Projects
categories. This is consistent with the findings of the 2009 Source: McGraw-Hill Construction, 2012
BIM SmartMarket Report in which owners of buildings
also reported the lowest expertise across all player types. A/E Firms Contractors Owners
42%
38%
34%
31% 32%
26%
21%
Use_Q16 20%20%
14%
11%11%
Consistent with previous McGraw-Hill Construction addition, the findings are again comparable to the 2009
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
SmartMarket Reports about BIM, the term implementation Business Value of BIM SmartMarket Report, which reported
refers to the percentage of a company’s projects that are BIM implementation for buildings. In that report, 27% report
done using BIM technologies and processes. doing high/very high implementation, defined as more than
60% of projects using BIM.
Comparing Implementation on All
Project Types to Infrastructure Variation by Player
Respondents that reported using BIM for infrastructure
■■ /E firms have a steep differential in the level of BIM use,
A
were first asked to baseline their level of BIM
with 49% reporting high/very high implementation on all
implementation on all project types, then asked separately
project types, but only 30% reporting that advanced level
about their implementation on infrastructure work. (Note:
for infrastructure.
Some respondents indicate “none” for their current BIM
usage because, even though they have used BIM in the past ■■ wners report a consistent 42% high/very high level
O
and plan to do so in the future, they had no BIM projects of implementation across both project categories,
currently underway at the time of the survey.) indicating a predominant focus on infrastructure by those
The findings confirm the trend that BIM use in owners, versus the A/E firms, which generally practice
infrastructure, and the extent of that use, lags several years on a wider variety of project types and may have more
behind vertical construction. Only 37% of respondents experience using BIM on vertical projects.
report low or no current BIM implementation on all projects,
but that percentage jumps to 53% for infrastructure. In
44%
42% 42% 42%
41%
37%
31% 32%
30%29%
3% 4%
2%
Low (<25% of Medium (25%- High/Very High Low (<25% of Medium (25%- High/Very High
None Projects) 50% of Projects) (>51% of Projects) None Projects) 50% of Projects) (>51% of Projects)
infrastructure with the expected implementation in Owners show the most growth, going from 42% not
two years reveals a striking increase in implementation using BIM for infrastructure two years ago to 100% saying
expected. Again, the predicted growth parallels the they will be doing some amount of BIM for infrastructure
results of the 2009 BIM SmartMarket Report, in which in two years. Over a quarter (26%) plan to be at a very
52% of those using BIM for buildings report that they high level of implementation at that time.
expect to use BIM on more than 60% of their projects. Because owner demand is cited as a top factor that
will encourage adoption among non-users, this trend has
■■ ow/no usage, which dominates the past (73%)
L
the potential to be the biggest driver of BIM adoption for
and current (53%) responses, decreases sharply
infrastructure. As more owners increase the number of
in two years, with only 21% expecting low usage
projects they commit to this approach, implementation
and no respondents expecting not to use BIM for
levels will increase across the board for design
infrastructure.
professionals and contractors.
■■ ery high usage will grow dramatically, from only 7%
V
two years ago to 30% two years from now, more than
four times greater.
36% 37%
34%
32%
27%
25%
22%
19%
17%
16% 16% 16%
13%
10%
6%
Low (<25% of Medium (25%- High/Very High Low (<25% of Medium (25%- High/Very High
None Projects) 50% of Projects) (>51% of Projects) Projects) 50% of Projects) (>51% of Projects)
44%
39% 38%
35%
32%
30%
23% 24%
20% 20% 19% 20%
15% 15%
Organizations of all sizes foresee increasing their BIM Implementation on More than 50% of
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
implementation of BIM to more than 50% of their infra- Infrastructure Projects by Size of Organization
structure projects, but the size of the organization has Source: McGraw-Hill Construction, 2012
Use_FirmSize
F
rom complex megaprojects
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
that really impacts the design in a simulation and 5D cost estimation are Replacement in Quincy, Mass., for
beneficial way.” possible with the model. The models Massachusetts DOT. The design calls
Parve says the process gives the include mobile, static and aerial light for a vertical-lift bridge with towers
team a greater likelihood of fixing detection and ranging. In total, the team that are nearly 300 feet high.
issues virtually, rather than in the field. expects to scale up to a 20,000-page set After starting the design in CAD,
“We’ve found that on projects, there of design plans using models created STV decided that the bridge’s
can be 5% to 10% of costs coming by more than 200 designers. complexity required modeling, says
from [change orders],” he says. “On Under the state’s design-bid- Greg Spears, a designer at STV.
some of these projects, that is more build method, Parve says, WisDOT “The coordination of the different
than adequate payback. It doesn’t take encourages contractors to use disciplines was a huge part of this
CONTINUED
U
N
ca
TI
N
CO
project,” he says. “We have a lot of its applicability on small projects as A plan to integrate the model with
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
equipment that requires electrical well. Clark Nexsen used modeling on the city’s GIS (global information
conduit that had to be designed for two intersection projects for the City system) was considered, but was
extremely tight places. By designing of Chesapeake, Va., with combined shelved for future consideration
in 3D, we’re able to see what our design and engineering fees of less because the city was updating its
electrical engineers are doing and than $100,000. GIS system at the time.
have immediate feedback over the The roadway project, which Kyle Jacocks, a civil engineer at
placement of their components.” began in 2009, aimed to realign an Clark Nexsen involved in integrating
In addition to MEP, STV created a intersection. Drainage improvements BIM into the firm’s infrastructure-
structural model and architectural and stormwater management were related disciplines, says modeling
components of the bridge. However, no included in the scope. Clark Nexsen the project improved visualization,
analysis was done in the models. was contracted the following year to enabled faster design reviews,
Although BIM was not required design a new mast arm traffic signal enhanced coordination, ensured
by the owner and the owner was not at the intersection. better constructability and
charged extra fees for the models, The team modeled the roadway increased collaboration.
Spears says, the effort paid off. “It and performed stormwater design Jacocks says that while BIM
streamlined our process,” he says. analysis based on the model. Quantity provided considerable benefits,
“There is a tight schedule for this takeoffs were performed for engineer’s it did add time to the process.
project, and modeling is one way estimates for inclusion in a bid package. However, he believes it proved
we were able to speed up the With the roadway model in place, Clark valuable on the project. “We know
process internally.” The client also Nexsen added its traffic signal study. some things took extra time, but
gained direct benefits through better The city commissioned a laser scan to it’s hard to measure what didn’t
over-the-shoulder reviews of the identify existing above-ground utilities happen,” he adds. “There was
models as they progressed. and other features, such as trees. The probably an additional cost, but
Still, the benefits were limited to model, laser scan and additional digital down the road, as we get more
the designer. Although the project is drawings were integrated to create experienced and faster [with
being delivered using design-build, the a virtual project “drive-through” for modeling], I anticipate that will be
contractor is not creating construction visualization and analysis. less of an issue.” ■
models. “That was not part of the initial
contract,” Spears adds.
Spears says he expects STV to
incorporate BIM into future heavy
civil projects, particularly on complex
facilities. “We’ve learned that this
is really effective at the intersection
between infrastructure and [vertical]
buildings,” he says. “If there are
minimal building elements, we can still
do it, but we don’t get the same kind
of benefits as when there are many
disciplines to coordinate.”
Chesapeake Roadway
Image courtesy of Clark Nexsen
Projects
While large, complex roadway
projects seem a more likely candidate
for BIM use, some firms are testing Clark Nexsen found value in modeling a $100,000 intersection in Chesapeake, Va.
M
ultibillion-dollar airport Scalamandre & Sons was awarded logistics and other aspects of
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
On San Diego International Airport’s Green Build, the team that handles the main roadway and parking aspects of the project
coordinates in BIM with a team under a separate contract that is building a terminal expansion, new gates and a new taxiway.
CONTINUED
U
N
ca
TI
N
CO
The Green Build at San On the civil side, Rob Foster, BIM also crossing competitive lines
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
Diego International manager for the Kiewit/Sundt/URS to work together. Dwain Brown,
On the $1.2 billion Green Build project at team, says a major initiative for his team TRIP implementation director and
San Diego International Airport, major was to model utilities and create highly program manager at Freese and
contractors on separate contracts work accurate as-built drawings. When the Nichols, says the airport authority
in harmony through BIM. The program team began its work, Foster says the wanted teams to work in common
is split primarily between the team of provided as-builts were very unreliable. platforms to enable high-value BIM
Kiewit, Sundt Construction and URS, “Like any good utility contractor, we use and consistent communication.
which handles the main roadway and tossed those aside and started drilling The airport also had a separate
parking aspects of the project, and the potholes [to locate utilities],” he says. sustainability goal to go paperless
team of Turner Construction, Flatiron “They cost about $1,000 each, and we on the project, necessitating greater
Construction, PCL Construction did more than 500 of them. We kept use of BIM and related tools. The
Services and HNTB, which is building track and modeled the existing and joint venture of Balfour Beatty
a terminal expansion, new gates and a new utilities so that when the as-builts Construction, Azteca Enterprises,
new taxiway. are sent to the next contractor, you’re H.J. Russell & Company and
From the outset of the program, saving another half million dollars.” CARCON Industries was the
the airport authority envisioned An overarching goal is to produce first team in, so Brown worked
a fully integrated program from a data-rich deliverable model for with those firms to establish an
design through construction with future facilities management, Hughes implementation plan.
modeled content that was created says. “Currently, for every dollar we Recognizing the potential
as a deliverable for the facilities spend in design, we spend $50 to $60 savings, the airport agreed to pay
management side, says AECOM’s Mark in maintenance,” he says. “If we can for items such as software and
Hughes, who serves as BIM manager spend an extra dollar in design and plan rooms with large computer
for the airport authority. save $10 in maintenance costs, that’s displays. The airport also purchased
When the teams were selected significant savings for us.” hundreds of iPads to allow
in 2007, both were contractually Hughes says that the process managers, superintendents and
obligated to collaborate in BIM and significantly accelerated the program, subcontractors digital access to
create data-rich models, Hughes trimming costs and keeping more all plans. WiFi throughout the site
says. “We entered a 90-day validation of the airport open for business. He enabled access to a cloud server for
period, where the three parties locked estimates that between hard and updated models and plans. “These
ourselves in a room and came up with soft costs, the $1.2 billion program are tools to achieve our goals,” he
a game plan,” he adds. might have cost nearly $2 billion using says. “We would pay for them one
Hughes says the team had very open traditional means. “We were able to way or another.”
dialogue about technology options and start foundations at 30% construction When a second joint venture of
expectations of deliverables. Although documents,” he says. “If we waited Manhattan Construction Co., Thos.
a plan was set in place, Hughes says the for the design to be done, we’d still be S. Byrne, James R. Thompson and
team understood that BIM technology waiting today, and we’re two years into 3i Construction came on board,
was still evolving. “We all recognized construction now. That’s a lot of lost Brown asked the Balfour Beatty
that this was really only a starting airport revenue.” team to get all parties on the
point,” he says. “We left the door open same platforms.
for exploration along the path. If we Terminal Renewal and Brown estimates that its
found a better solution, the opportunity Improvement at Dallas/ paperless initiative alone could
was brought to the table to discuss. Fort Worth save the airport more than $8
Simple things like platform changes Joint ventures on the Dallas/Fort million in printing costs and
and platform products had to be Worth International Airport’s added efficiencies. ■
discussed. New products came online $2.3 billion Terminal Renewal and
that we couldn’t even dream of initially.” Improvement Program (TRIP) are
T
he intersection of vertical
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
management, then there is a lot of segments with the encouragement of VivaNext Bus Rapid Transit system
value to be gained,” he says. “We the Toronto Transit Commission. Hatch project. A partnership of Kiewit
see more sophisticated clients taking Mott MacDonald (HMM) modeled its and EllisDon is modeling much of
CONTINUED
U
N
ca
TI
N
CO
a 7-kilometer section of the project design was well underway, so it had The point clouds are also used for
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
that will include road-widening for to build its model from scratch. For quantity takeoffs and estimating. Erlich
dedicated bus lanes, 22 stations, the second phase, Erlich says, the says the scans are accurate to “within a
two pedestrian bridges and five team got designers to work in 3D to couple of millimeters.”
new bridges built for environmental speed up the modeling process. The team is also scanning the
protection along the corridor. Perhaps the most robust tool roadways, using an outside firm with
The team converted 2D drawings used in its modeling effort is a vehicular scanner. Again, getting
into 3D models to help analyze road laser scanning. The team, which accurate measurements is a major
structures, corridors, intersections purchased its own scanner, is benefit. “A centimeter difference
and culverts for constructability. regularly scanning all conditions as over seven kilometers adds up to a
The team also generated quantity construction progresses. Kiewit/ lot in quantities.”
takeoffs and earthwork calculations EllisDon sees multiple benefits from During construction, the point
from the model. For the stations and the process. Erlich says the team clouds allow the owner and other
bridges, the team modeled structural uses the point clouds produced team members to monitor progress of
elements; coordinated existing and by the scanners to ensure quality, the project.
proposed utilities; and performed particularly at the interfaces Potentially, one of the most valuable
quantity takeoffs. The model was between the civil works aspects aspects of scanning will be realized after
also used for 4D scheduling with of the project and the vertical completion. Because the project is being
site superintendents to help them construction. Those point clouds scanned regularly, the point clouds can
visualize the process. can be pulled into the 3D model to be combined after completion to create
Denis Erlich, senior BIM compare site conditions with the highly accurate as-built models, Erlich
coordinator with EllisDon, says the design. When discrepancies are says. “You can see the station peeled like
team came in after the first phase of found, they can be addressed quickly. an onion,” he says. ■
Image courtesy of EllisDon
The VivaNext project is scanned regularly, creating a series of point clouds that are added to the model.
The top four benefits noted by users of BIM for Top Internal Business Benefits of Using BIM for
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
infrastructure are the same as the top benefits noted Infrastructure Projects for A/E Firms and Contractors
for buildings in MHC’s 2009 Business Benefits of Source: McGraw-Hill Construction, 2012
BIM SmartMarket Report, and they are ranked in the A/E Firms
same order. This demonstrates the consistent results Contractors
experienced from BIM across project types, especially to
create new business and improve project outcomes. Marketing New Business
Several of the most critical benefits of using BIM for 45%
infrastructure hold equally strong appeal to A/E firms 45%
and contractors. Overall Better Project Outcomes
■■Marketing New Business 38%
An equally high percentage (45%) of A/E firms and 51%
contractors rank the ability to leverage BIM capabilities Reduce Errors in Documents
and experience to win new work as a top benefit, making 42%
it the most universally important among all internal
41%
benefits. This competitive advantage aspect has scored
well consistently in previous BIM research conducted by Offer New Services
McGraw-Hill Construction. 39%
Other factors related directly to business concerns 42%
were also selected as important by over one third of A/E Maintain Repeat Business
firms and contractors: 38%
• Offer New Services
38%
• Maintain Repeat Business
Reduce Rework
■■Reduce Errors in Construction Documents 31%
A/E firms and contractors also agree (42% and 41%,
44%
respectively) on the high importance of BIM’s ability to
reduce construction document errors. Improve Learning for Younger Staff
34%
Improve Learning for Younger Staff
■■
38%
A/E firms and contractors also highly regard BIM’s
usefulness for working with younger staff, an important
aspect of attracting and retaining the emerging tech-
savvy workforce in the construction industry.
Benefits_Q21_AEC
Benefits scoring lower among A/E firms and contractors Variation by Player
include reduced claims/litigation and increased profits. There are a few benefits that appear to carry greater
This result does not suggest that these are unimportant weight with contractors than with A/E firms.
benefits, but that they are not yet demonstrated to the
■■ ver half (51%) of the contractors report overall better
O
extent that many firms can report experiencing them.
project outcomes as a top internal benefit from using
BIM. This benefit allow respondents to assign an
internal value to the sum of all of the project-oriented
benefits they experience, which is of particular concern
to contractors.
■■ educing rework is rated more highly by contractors
R
(44%) than A/E firms (31%), likely because they are
affected most directly by this issue.
As the entities ultimately responsible for project Top Internal Business Benefits of Using BIM
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
outcomes, owners have their own unique perspective for Infrastructure Projects for Owners
on what constitutes an internal benefit of BIM on Source: McGraw-Hill Construction, 2012
T
he specialized nature of Simulation parties. By modeling the existing
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
infrastructure projects Once surface and subsurface surface and subsurface conditions
creates the opportunity conditions are modeled, engineers of the entire downtown, PB could
for a number of benefits can simulate the impact of their produce numerous highly descriptive
resulting from BIM technologies and proposed design solutions. For and compelling animations that
processes. Even clash detection, a example, by using computational definitely accelerated the complex
staple of vertical BIM, has special flow analysis, an engineer can assess evaluation and approval process.
significance on infrastructure the downstream impact of a dam on See an example at <youtube.com/
projects. According to Dan Klancnik, the existing natural water system. watch?v=mWfwnkEbc4Q>.
VDC manager at the Walsh Group It is also possible to simulate the
in Chicago, “Conflicts tend to be effect of a natural disaster on the Visualization for
much more expensive in treatment built environment. This was done Business Development
plants and heavy construction than in in Seattle to assess the impact Marketing BIM capability is one of the
commercial work, so the benefits [of of an earthquake to an elevated top internal business benefits of BIM
BIM] are easily realized.” highway and the surrounding for infrastructure reported by current
grade level improvements. To see users in this SmartMarket Report (see
Civil Conditions the video, go to <youtube.com/ page 21). Combining that goal with
A building has a defined footprint watch?v=hos_uIKwC-c>. the power of visualization for highly
where it touches the earth, and complex engineering solutions,
once the foundation is in place, the Engaging Community many firms are modeling proposed
complex realities of the geophysical Stakeholders approaches to projects during the
environment that surrounds it have Large roadway and tunnel projects marketing phase. This allows them
minimal impact on construction. in urban areas are complex and to demonstrate their BIM prowess at
Horizontal projects, by contrast, can require choices between many the same time they impress the client
are subject to every nuance of the alternative approaches before with their understanding of the unique
extensive amount of terra firma with the final engineering solution is aspects of the project. ■
which they engage. “No two feet of approved for implementation. This
a roadway is like any other two feet,” process is further complicated
says Eric Cylwik, BIM engineer for by required involvement from
the Heavy and Civil Group of Sundt numerous stakeholder groups whose
Construction in Tempe, Ariz. members are often non-technical
Many firms putting BIM to work and have difficulty understanding the
on civil projects believe in using a differences between options based
variety of inputs including GIS data, on the handful of design documents
underground radar, laser scanning, and renderings that are typically
test borings, and any other source produced for these purposes.
of reliable information to develop a The Alaskan Way Viaduct and
complete-as-possible model of the Seawall Replacement project in
existing civil conditions with which Seattle, Wash., is just such a project.
they will be working. Once that model Coursing through the heart of the
is in place, engineers can leverage it city’s downtown business area, its
for nearly endless types of analysis, impact is enormous. The project’s
simulation and visualization to engineering firm, PB, developed 98
optimize design solutions. Says Jay different alternatives, from elevated
Mezher, VDC Manager for Parsons highways to tunnels, which had to be
Brinckerhoff (PB), “You can model and comparatively evaluated and then
analyze as many issues in horizontal narrowed down to a final plan with
projects as you can in buildings.” the involvement of a large array of
BIM is still maturing in its applicability throughout the High/Very High BIM Value for
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
lifecycle of a project. As a result, benefits are not being Infrastructure by Project Phase
experienced at equal levels across all phases by every Source: McGraw-Hill Construction, 2012
BIM generates varying degrees of value for each player High/Very High BIM Value for
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
Benefits_Q28
While there is much variability among the value of project Most Important Infrastructure Project Factors
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
factors by player, one factor, project complexity, rates that Add Value to BIM Use
equally high (total of 61%) among all respondent types. Source: McGraw-Hill Construction, 2012
Not surprisingly, each player has a very different view of Most Important BIM Benefits that Contribute
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
the top current benefits of using BIM for infrastructure. Value to Infrastructure Projects
Source: McGraw-Hill Construction, 2012
Variation by Player
A/E Firms
A/E FIRMS Contractors
The A/E responses are largely in agreement with the owner’s Owners
responses. The only area selected by significantly more A/E
Reduced Conflicts & Changes During Construction
respondents than owners is reduced conflicts and changes
during construction. One factor that may make this benefit 55%
particularly appealing to A/E firms is BIM’s ability to convey 65%
design intent, which reduces the likelihood that the contractor 47%
will make major changes to the project during construction. Improved Overall Project Quality
CONTRACTORS 44%
69% of contractors cite reduced conflicts and changes 50%
during construction as important, the highest percentage 59%
of any group for any of the benefits. It also has the highest
combined total percentage (58%) across all player types. Lower Risk & Better Predictability of Outcomes
46% of contractors also give high marks to prefabrication 37%
of larger and more complex parts of projects, a BIM trend 43%
that is well established and growing. Among the company 35%
types that comprise the contractor category, specialty
Prefabrication of Larger, More Complex Parts
contractors are especially enthusiastic regarding this benefit,
35%
with 38% reporting it as having very high importance and
none rating it with low or no importance. 46%
31%
OWNERS
The highest percentage of owners (59%) select improved Better-Performing Completed Infrastructure
overall project quality as an important BIM benefit, making 38%
this the second most important benefit overall, with a 34%
combined total of 48%. 40%
The benefits of reduced total project cost and reduced
Improved Review & Approval Cycles
overall project schedule are also selected by a significant
percentage of owners (44% and 38%, respectively), but their 36%
relatively low level of selection by design and construction 32%
respondents keep them out of the top group of BIM benefits 38%
as shown in the chart at right.
Other Benefits
Falling short of the top group of current BIM benefits are
improved individual participant productivity and improved
profitability of participating companies. While certainly
desirable outcomes, these benefits are likely selected by Benefits_Q30
fewer respondents as important due to a lack of reliable track
record of achieving them, a persistent trend throughout all
the lower-ranked data. As more data are collected from BIM
teams across the industry, these benefits are sure to rise
in perceived value.
All players believe that reduced conflicts and changes Areas of Greatest Value to BIM Practitioners for
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
during construction will be their top future benefit of Infrastructure Projects in 5 Years
using BIM for infrastructure. This finding corresponds Source: McGraw-Hill Construction, 2012
■■Improved review and approval cycles (63%) Improved Review & Approval Cycles
This result demonstrates an awareness of the value that 52%
streamlining decision making provides for everyone. 50%
■■ ower risk and better predictability of outcomes (61%)
L 63%
and reduced total project cost (59%) Reduced Total Project Cost
The importance of these areas reinforces the owners’ 52%
focus on the elements by which their performance
47%
ultimately will be measured.
59%
Interestingly, the fewest owners place high value on
the future benefit of higher-quality, better-performing
completed infrastructure, which should accrue the most
relative benefit to them. This may be because there
currently is not enough evidence of the ability to achieve
that result, and their opinion may shift once data are
collected to establish that potential. Benefits_Q31
The Panama Canal Authority added BIM to the workflow at its ongoing $6 billion expansion project, primarily for use by the
design team; however future plans call for use of BIM in other tasks, including scheduling.
B
uilding information modeling Seattle District, says that unlike the dam. Woods notes that the facility had
(BIM) is beginning to pique the “top-down” approach that the Corps relatively complex geometries, such as
interest of public entities that used to implement BIM on vertical a horn modeled as an elliptical curve,
own, operate and maintain building projects, the adoption of traction water conduit modeled as
dams, canals and levees. Such critical BIM on civil projects is starting in an ogee parabolic curve, and a flood
infrastructure is generally expected to the trenches. “We have engineers control tunnel modeled as a helical
remain in operation for many decades, interested in trying to get [BIM] into horseshoe. Additionally, a pedestrian
and some owners recognize the long- the workflow, and we are helping to bridge comes in on an angle and has
term benefits of creating models for support that,” he says. a slope.
ongoing analysis and improvement Woods says that a handful of Multiple disciplines worked on the
of facilities. districts are starting to test the model, including structural, mechanical,
technology’s applications in civil civil and geotechnical. Through its
U.S. Army Corps of projects, including recent work on coordination efforts, the team discovered
Engineers the Howard Hanson Dam through its that a planned drilling location for
The U.S. Army Corps of Engineers Seattle District. Initially, engineers reinforcement of the fish ladder would
released its BIM Roadmap in 2006, and chose to model the dam as a way to have clipped the existing structure.
since then it has made great strides by monitor a depression that appeared on “That was an interesting exercise in cost
requiring use of the technology on its an abutment. The team used terrestrial avoidance,” Woods says.
vertical building projects. Recently, the and aerial LIDAR data to build a 3D The team was also able to pull
Image courtesy of MWH Global
Corps started implementing 3D modeling site model. quantities from the model, such as
and BIM on civil works projects as well. The team has since built models on volume of concrete, rebar and structural
Van Woods, CAD/BIM manager top of that data, including a BIM model steel; volume of rock and soil excavation;
in the U.S. Army Corps of Engineers of a new fish passage facility at the and vertical and horizontal surface areas.
CONTINUED
U
N
ca
TI
N
CO
Although the Corps’ use of BIM on earth dam components. Other modeled Pansic notes that the biggest
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
civil projects is years behind its efforts elements include filling and emptying challenge has been getting up to speed
in vertical building, Steve Hutsell, components, large fixed-wheel gate on how BIM can be applied in civil
geospatial section chief in the Seattle valves, and 60 control buildings per lock projects while sticking to the project’s
District, says it will be part of the Corps’ complex. All mechanical systems and aggressive schedule. “We are coming
future workflows. “You’ll see more electrical controls for the complex are up the learning curve, so there have
civil projects with 3D as a requirement also modeled, as well as supporting been situations where we had to go
for design and construction,” he adds. utilities. Additional civil works and back to the conventional approach and
“Within the Corps, there’s recognition earthwork models were created by then come back later to catch up in the
of its value in the vertical world. The outside consultants. BIM model. It hasn’t been 100 percent
question we’re trying to answer is: Can Although the authority left the according to the grand plan.”
we not achieve those same results in implementation plan up to the Although the project is designed in
civil works?” consortium, Pansic says having all BIM, the build team is not required to
parties on the same platforms aided with use BIM. All construction documents
The Panama Canal coordination of models from the different will be provided in 2D. Still, Pansic sees
In recent years, the Panama Canal disciplines. “We had to resolve a conflict greater use of BIM on the project in the
Authority added BIM to the workflow at recently with the high-mast lighting future. He says the authority plans to
its ongoing $6 billion expansion project. required for operation of the locks,” contract a BIM consultant to develop
Nick Pansic, deputy design manager for he says. “The locations of those light a 4D schedule for the project. The
the project with MWH Global, has been poles are interfering with some access authority may also consider using the
involved with the project for more than roadways needed for equipment. The model for facilities management in the
a decade, and recently was asked by the BIM tool is an easy way to quickly identify future, but those plans have not been
authority to implement BIM. where we have those conflicts and finalized, he says.
Pansic says the initiative provided present that to the contractor and owner.” Beyond the benefits for the project,
MWH with an entrée into BIM for The team designed the project to Pansic says MWH is gaining a critical
civil works. “I was excited to see Level of Development 300 standards, understanding of the technology.
it requested,” he says. “I knew it which enables the team to create “They have been looking for ways
would challenge us to up our game construction documents and provide to introduce this technology and
and figure out a new way to design rough quantity takeoffs for estimating. understand what is needed to make this
projects versus traditional delivery of Pansic says the team didn’t link structural a standard approach going forward,”
something like this.” or hydraulic intelligence for analysis he says. “Having a real project with real
The master plan includes several purposes to the model, since that would challenges and lessons learned will
dredging projects, but the BIM initiative require a higher level of development. help with other projects in the future.” ■
is focused on the Third Set of Locks
project. MWH is part of a design
joint venture with Tetra Tech and the
Dutch firm Iv-Infra. The joint venture is
subcontracted under the design-build
consortium Grupo Unidos por el Canal.
Image courtesy of U.S. Army Corps of Engineers
Marketing BIM capability is the leading focus for both Focus of BIM Infrastructure Investments
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
current (38%) and future (51%) investment across all (Current and Future)
respondents. This result is not surprising because A/E Source: McGraw-Hill Construction, 2012
Because currently there is no widely accepted way Perceived ROI on Infrastructure BIM
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
26%
21% 21%
20%
19%
17%
16% 15% 16%
13% Invest_ROIExpertise
12% 11%
11%11%
10% 10% 10% 10%
2%
Negative Break-Even Less than 10% 10%-25% 26%-50% 51%-100% Over 100%
is the same in both surveys—15%. The overall greater t the other extreme, 43% of BIM experts claim high
A
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
■■
experience with BIM by the players in this survey positive ROI (50% or greater). Only 2% of beginners
combined with their relative lack of experience with using believe they are receiving that level of ROI.
it for infrastructure may account for these results.
Comparing the results by level of expertise to the 2009
report reveals a similar pattern. Far more beginners (62%)
ROI Investments by Level of Expertise reported negative/break-even ROI in 2009, but among
There is a strong correlation between respondents’
the experts, the percentage in 2009 who experienced
reported ROI on BIM for infrastructure and their BIM
50% or greater ROI is 39%, slightly lower than the 2011
expertise level.
infrastructure results. Again, this suggests that their
early half (47%) of BIM beginners are experiencing
N
■■ greater overall knowledge of BIM from building projects
negative or break-even ROI in BIM for infrastructure. may be impacting the ROI of those who consider
themselves beginners in BIM for infrastructure.
56% of all respondents engage in formal measurement of Formal Measurement of ROI on BIM
ROI for BIM on at least some portion of their infrastructure for Infrastructure Projects
projects, compared to 46% of BIM users on buildings in
Source: McGraw-Hill Construction, 2012
MHC’s 2009 Business Value of BIM SmartMarket Report.
This increase may be due to greater overall familiarity with
A/E Firms Contractors Owners
BIM in the industry since 2009.
Among all the organizations that measure ROI on some 56% Formally Measure ROI
portion of their projects, the largest group (28%) do so on
53%
less than 25% of them. Most of these are A/E firms and
contractors, who are typically not highly experienced with 46%
calculating ROI and thus only do so on a relatively small 42%
percentage of their projects. Also, many organizations
are probably assuming that the metrics for a few projects
28% 28%
reasonably apply across all of them, and thus measuring ROI 26%
on a sample of their portfolio is adequate.
16%
15% 15%
13% 13%
Variation by Player
A/E FIRMS AND CONTRACTORS 5%
58% of A/E firms conduct ROI measurement on at least some
of their projects, followed closely by contractors at 54%. None Less than 25% 25%-50% Greater than 50%
OWNERS
Taking the lead at both extremes, 53% of owners conduct
no ROI measurement, while another 16% of them are
measuring ROI on half or more of their projects. related to their construction programs. But if ROI is not
In both cases, this is probably a reflection of organization- being measured as a standard practice, it is unlikely that
wide policies. Organizations committed to measuring the introduction of BIM, in and of itself, would instigate this
ROI as a standard practice will also do so for investments major process change.
About one quarter of all respondents that measure ROI Length of Time ROI Has Been Formally
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
for BIM on infrastructure projects report having done Measured on BIM for Infrastructure Projects
so for a long time (more than two years), with roughly (Among those Doing Formal Measurements)
equal proportions of the three player types falling into Source: McGraw-Hill Construction, 2012
this category.
A/E Firms Contractors Owners
Variation by Player
44% of owners have been formally measuring ROI for a 47% 47%
moderate length of time (one to two years), leading that 44%
category by a significant margin. Thus, even though a
relatively smaller portion of the owners engage in formal 34%
measurement, those that do have been conducting such 30%29%
measurements for a longer time.
23%24%22%
This is likely due to long-standing organizational
policies that require ROI measurement on a wide range
of technology investments across the organization,
therefore establishing it as an expectation of construction
activity as well.
Almost half (47%) of the A/E firms and contractors
that report measuring ROI are new to it, having done so Less than More than
for less than one year. 1 Year 1-2 Years 2 Years
For players that measure the ROI of BIM, the top two Most Important Means of Improving ROI on
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
factors that can raise their perception of ROI are project- BIM for Infrastructure Projects
oriented benefits, not internally focused ones. (Among those Doing Formal Measurements)
Source: McGraw-Hill Construction, 2012
t 66%, the leading factor is improved project process
A
■■
outcomes (such as fewer RFIs and field coordination Improved Project Process Outcomes
problems). This represents an enlightened understanding 66%
that all participants benefit from smoother, more
Better Multi-Party Communication
trouble-free projects. This was especially strongly felt by
63%
contractors (71%).
Improved Productivity
etter multi-party communication, a close second at
B
■■
60%
63%, reflects the belief that the use of modeling can
improve information exchange so effectively that each Positive Impact on Marketing
company will directly benefit. 56%
These were also the top two factors selected by Reduced Cycle Time for Activities
organizations using BIM for buildings in MHC’s 2009 survey. 52%
Six other factors considered the most important means
Lower Project Cost
of improving ROI by 30% to 52% of the respondents are
project-based benefits, including reduced cycle time, lower 44%
project cost, positive impact of sustainability, increased Positive Impact on Sustainability
prefabrication, faster plan approvals and permits, and 38%
improved job safety.
Increased Prefabrication
These finding support the conclusion that better
project processes generate notable benefits for individual 37%
participants, benefits they believe are demonstrable in Faster Plan Approval & Permits
their ROI. 36%
However, internally focused benefits are still important
to the respondents, with improved productivity and Positive Impact on Recruiting/Retaining Staff
positive impact on marketing scoring third and fourth in 34%
the ranking—at 60% and 56% respectively. In addition, one Improved Jobsite Safety
third find great value in the impact of BIM on recruiting and
32%
retaining staff.
Green Infrastructure
38% of the firms that measure the first in the U.S. to rate the Engineering Companies (ACEC)
the ROI of BIM in infrastruc- sustainability level of all types andInvest_Q26
the American Public Works
ture consider improved sustain- of infrastructure across three Association (APWA).
ability an important means to dimensions: economic, social Government at all levels is
improve ROI. This result is con- and environmental. also engaged in pursuing green
sistent with rising industry The Envision standard may infrastructure. Cities like Chi-
interest in green infrastructure. have a broad reach since it is cago and Philadelphia have
One major milestone for the supported by leading infra- launched major initiatives, and
pursuit of green infrastruc- structure industry associations the federal government has
ture in the U.S. is the launch in the U.S. The founding organi- begun to look at how to green
of the Institute for Sustain- zations of the ISI are the Amer- the procurement of infrastruc-
able Infrastructure’s (ISI) Envi- ican Society of Civil Engineers ture across all agencies.
sion standard. This system is (ASCE), the American Council of
The factors expected to improve the value of BIM by Factors Most Important to Overall Experience of
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
organizations that are using BIM for infrastructure but are Value from BIM on Infrastructure Projects
not measuring ROI correlate with the benefits considered (Among those Not Measuring ROI)
important by those that already measure the ROI of BIM. Source: McGraw-Hill Construction, 2012
M
ajor design and read the 2D blueprints well, but they Arbennie Pritchett Water
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
B
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
IM is yielding powerful
results on energy projects.
Mortenson Construction,
which was an early adopter
of BIM in vertical building construction,
extended that commitment into its
Renewable Energy Group. “We wanted
to push its limits to see what it could
do,” says Sera Maloney, the group’s
integrated construction manager.
Wind Farms
On its wind farm projects,
Mortenson’s teams construct
Mortenson Construction uses BIM models to resolve potential conflicts between a
numerous turbines on vast sites wind tower’s electrical conduit and the structural rebar in its foundation.
that often have varying conditions.
Heavy equipment and materials may Scheduling is a major component Engineers at Enmax Power
need to cross small rural bridges, of its modeling effort. Deliveries must Corporation, which owns and
open streams or railroad tracks. be carefully planned so that materials operates an electricity distribution
Underground and overhead utilities are placed in the right location and and transmission network around
must also be considered. Many in the proper sequence. With solid Calgary, started modeling new
farms are built on mountaintops, planning, construction follows almost substations in mid-2010.
another challenge. “A blade an assembly line process, as crews “We build 3D models with
transport truck could be up to 190 move from pad to pad, ideally in a near- intelligence,” says Lindsey Porteous,
feet long with 19 axles,” she adds. repetitive pattern. electrical construction planner at
“Driving that over a rural road will “We model every piece of the Enmax. “We create a single-line
probably cause issues.” construction process,” she adds. “We diagram of the substation that shows
Speed of construction is critical, have plan room computers located on the equipment. Then, we can click on
as most farms must be delivered each site, and the 4D schedule is used in a device, such as a circuit breaker, and
within one season, so Maloney says our daily meetings.” navigate to that on the 3D model of that
preplanning is where BIM offers Models are also used for quantity station. You can click on it and get the
the greatest benefit. The team takeoffs and systems coordination. part number, the manufacturer and
investigates all site issues; considers For example, the electrical conduit the cost. You can also create accessory
where dirt needs to be moved; for a tower, which can be 100 feet tall, parts for each device, so you can
determines lay-down areas; and typically conflicts with the significant include things like the connector bolts.”
maps how equipment and materials structural rebar required in the Porteous says modeling saved time
will be moved around. foundations, she says. and reduced errors. The software
On one of its projects, about 70 Mortenson has also leveraged its automatically creates wiring diagrams,
towers were constructed on a U.S. preplanning modeling to create better which he notes are prone to errors
Bureau of Land Management site. proposals. “We won a recent project using traditional design methods. The
Image courtesy of Mortenson Construction
The team was given up to a three- based on the modeling we did [as part of team also generates bills of materials
acre radius per tower to work in. After our proposal] because we showed that and estimates costs from its models.
modeling each stage of the process, we knew the project better,” she says. Some suppliers provide his team
Mortenson found it only needed with models of devices. “Instead of
to use two acres per tower. “On Electrical Substations taking a week to build a model of a
environmentally sensitive land, that’s Some owners in the energy sector circuit breaker, it takes 10 minutes,”
a huge savings,” she adds. are also adding BIM to their workflow. he adds. ■
54% of respondents report that they do not currently use BIM Non-User Profile: Company Type
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
The player type data reveal a trend that runs through 74%
the non-user profile—exposure to BIM use on vertical
projects increases the likelihood of using BIM for
infrastructure as well. 61%
Owners have the highest percentage of non-users 54% 55% 55%
(74%), probably due to the slower pace of BIM adoption
in the infrastructure sector compared to the vertical
(building) market. Infrastructure owners are less likely to
do a large number of vertical projects that might expose 35%
them to using BIM. 14% of owners also indicate that they
do not understand what BIM is, compared to only 2% of
architects and 4% of engineers.
In contrast, architects have the lowest percentage of
non-users (35%). Many architects may also practice in a
variety of vertical project types. Thus, they are more likely
to use BIM elsewhere in their firms and can apply the
knowledge of its benefits to their infrastructure work. Trade/
Architect Engineer CM/GC Fabricator Owner Other
The involvement of different types of engineers with
BIM for infrastructure also supports this correlation:
■■ early two-thirds of MEP engineers (represented in
N
the “Other Engineers” pie chart below) use BIM on
infrastructure projects.
■■Structural engineers are evenly divided.
■■ wo thirds of civil engineers are non-users. These
T
engineers are less likely to be involved with vertical
projects compared with the other disciplines.
32% 48%
52% 60% 40%
68%
Comments by Users:
Converting Non-Users to Adopt BIM for Infrastructure
Starting With civil group in 2010, where the firm BIM by an owner requirement. This
Vertical BIM
I
continues to innovate in applying is taking place at all levels from
n some cases the organization BIM technologies and processes to local airport authorities, to state
was already successfully infrastructure projects. departments of transportation,
engaged with BIM on its vertical to large federal agencies such as
work, then discovered some Growing BIM the U.S. Army Corps of Engineers.
specific, tangible application of it to Organically Robert Bank, Chief of the Civil
a unique aspect of an infrastructure Organizations that specialize in Works Branch, Engineering &
project, and subsequently started the infrastructure typically have not Construction of the Corps sees
adoption process. had the chance to build BIM BIM as a fundamental part of the
This happened with Sundt expertise on vertical work and have Corps’ approach of “solutioneering,
Construction of Tempe AZ, where had to adopt BIM for infrastructure basically finding creative and
president Doug Pruitt championed more organically. collaborative solutions to problems.
the firm’s adoption of BIM in 2006 Infrastructure engineering As the projects get more complex,
by forming an internal group called powerhouse Parsons Brinckerhoff our smart A/E industry partners are
SIMCON, which provides BIM (PB) provides an example of this going to respond to the challenge.”
services to its project teams. From approach, where some business It is most effective when an owner
there its use grew steadily on Sundt’s units started leveraging 3D for is committed to BIM from the very
vertical projects, especially with the visualization in the early 1990s, beginning of a project and will, as
self-perform concrete group. including detailed rebar models George Pontikes, CEO of contractor
In 2009 the firm found the right and computational fluid dynamics Satterfield & Pontikes, puts it,
opportunity to apply BIM to Phase II in addition to 3D representations “drive the BIM train,” ensuring that
of a light rail project, the first phase of of proposed dams, bridges and all team members understand the
which Sundt had built conventionally. highways for client presentations. importance of compliance. Such
Coordination of underground utilities “Our culture at PB has always been committed owners are critical for
had been a major challenge on Phase very supportive of innovation,” driving industry-wide adoption. ■
I, and by modeling underground data says Jay Mezher, manager of virtual
from 700 locations on Phase II, they design and construction in PB’s
discovered over 1,000 issues that New York City office and part of the
would have created field problems. global technology team of parent
This successful proof-of-concept company Balfour Beatty, which
led to a more ambitious application has mandated an all-BIM policy
of BIM involving laser scanning by 2014. “Visualization of complex
and modeling of dangerously engineering solutions is so critical,”
deteriorating civil and structural he continues, “that at this point every
conditions on a complex and group in PB is modeling.”
time-critical bridge replacement.
Establishing BIM’s clear value in Owner-Driven Adoption
that instance, SIMCON placed Much infrastructure work is
a permanent BIM engineer in government related, and many
Sundt’s self-performing heavy organizations are brought into using
Non-User Profile:
Organization Size and Location
Variation by Region
An organization’s location within North America
seems to influence whether they have adopted BIM
for infrastructure.
■■ he highest percentage (30%) of non-users are located
T
the Southern U.S.
■■ he Northeastern U.S. (17%) and Canada (9%) have the
T
lowest percentages of non-users.
37% 36%
30%
23%
21%
16% 17%
11%
9%
There are clear correlations between the types of Non-User Profile: Project Type
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
Nu_QS14
non-users’ attitudes towards BIM are predominantly Among non-users, contractors and owners are the most
positive (79%). Firms that have rejected BIM after engaged with the possibility of using BIM, with A/E firms
experience with comprise a very small fraction of the comprising the largest percentage of non-users that are
total (5% of A/E firms and 3% of contractors). A few more simply not interested in using it.
have not tried it and are just not interested in using it, but This may be because many of the top benefits
by far the majority indicate that they are interested in reported by contractors and owners, such as reduced
exploring BIM adoption in the future, with well over 10% conflicts and changes during construction and
currently in the process of actively evaluating it. prefabrication of larger, complex parts, are typically more
These results are roughly equivalent, if slightly less tangible, measurable and visible than those enjoyed by
positive, than those of the non-users of BIM for buildings A/E firms during the design phase, such as improved
in MHC’s 2009 Business Value of BIM SmartMarket review and approval cycles.
Report, where almost one quarter of respondents were Also, the majority of North American A/E firms are
already evaluating it and 11% reported having no interest small, and their resource limitations may reduce their
in using it. Infrastructure has historically been a very interest in adoption. This conclusion is supported by
traditional segment of the construction industry, and two of the top reasons that A/E firms cite for delaying
slightly more skepticism is not surprising. adoption—the cost required and the view that BIM is less
efficient for smaller projects (see page 48).
58%
51%
43%
24%
22%
Non-User Forecast:
Importance of BIM to the Infrastructure Industry in Five Years
The generally positive forecast of the importance of BIM The positive perception of the future importance of
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
to the infrastructure industry in five years by current BIM for infrastructure by owner non-users signals an
non-users is another leading indicator of increased impending increase in demand from that sector, which will
adoption of BIM for infrastructure projects. Only 4% of all have a major impact on driving adoption by other players.
non-users believe it will have no importance in five years. Other findings in this study bear out the importance
Even more promising, 25% believe it will have high or of owner demand in increasing adoption, including the
very high importance. fact that nearly half of the A/E and contractor non-users
Even with this optimistic forecast, infrastructure believe that owner demand for BIM will drive non-user
respondents are more conservative than their building adoption, and that well over half of the A/E and contractor
counterparts in the 2009 survey, where 81% expected non-users (67% of A/E firms and 57% of contractors)
BIM to be very important in the next five years. Again, this believe that lack of demand is the biggest factor
may be a cultural difference between infrastructure and influencing the decision to not use BIM. (See pages 50
building organizations. and 49 for more information.)
A/E FIRMS
Variation by Player In contrast, A/E firms appear to be the most skeptical of
OWNERS BIM’s value for infrastructure. They represent the highest
Owner non-users place the highest value on the proportion of those who expect that BIM will have no or
importance of BIM in the future, with 43% of the low importance and the lowest proportion of those who
owners indicating that BIM will have high or very believe it will have high or very high importance.
high importance and 78% expecting it to have at least
moderate importance.
42%
35% 34%
27% 27%
20% 21%
9% 9%
7%
5% 5%
3% 2%
AEC Perception:
BIM Usage for Infrastructure by Competitors
When asked about their awareness of BIM usage in Non-User Perception of Competitors' Use of BIM
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
their markets, 71% of the A/E and contractor non-users (A/E Firms and Contractors)
indicate that they believe their competitors are using Source: McGraw-Hill Construction, 2012
BIM. Strong perception of use by competitors could be
a factor in the high level of interest in BIM adoption (see A/E Firms Contractors
page 43 for the breakdown of non-users that express
interest in BIM).
Do Not Perceive
Even though most of these non-users believe BIM is Perceive 29% Competitors
being used by their competitors, they do not think that Use BIM 71%
the level of implementation is very high. Most non-users
(55% on average) perceive that a low level (<15% of 57%
projects) of BIM use for infrastructure is taking place. 52%
These results are strikingly similar to the perception
of competitor use of BIM for buildings reported in MHC’s
2009 Business Value of BIM SmartMarket Report, with
almost every category within a few percentage points
of the 2009 non-users. This suggests that, despite their 30%
28%
more conservative estimates about the importance of
BIM, non-users may feel competitive pressure to begin
exploring it, which will expose them to the benefits 17%
already reported by those using BIM for infrastructure. 10%
Variation by Player 3% 3%
While 28% of the A/E firms perceive no competitive BIM
use, that percentage shrinks to 11% when considering <15% of 15%-30% 31% + of
architects alone. In addition, while the percentage is small Not at All Projects of Projects Projects
(3%), architects are the only firm type that believes that
competitors are using BIM on more than 30% of their
projects. Given the higher adoption levels by A/E firms
involved in infrastructure evident in this survey, this
estimation is consistent with the industry.
In contrast, 37% of specialty contractors and 31%
of engineers do not perceive any BIM use by their
competitors, far more than the architect respondents.
NU_Q4
AEC Perception:
BIM Usage for Infrastructure by Clients
78% of A/E and contractor non-users believe that their Non-User Perception of Clients' Use of BIM
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
clients use BIM. While the overall pattern echoes the (A/E Firms and Contractors)
perceptions of competitor use (see page 45), there are Source: McGraw-Hill Construction, 2012
some important variations, both in the expectations of
overall use and by firm type. A/E Firms Contractors
One critical difference is that client use is perceived to be
more widespread and more intensive than competitor use. Perceive Perceive
No Client Clients Use
higher percentage of non-users believe that their clients
A
■■
BIM Use 22% BIM 78%
are using BIM than believe that their competitors are.
58% 57%
■■ 0% of non-users believe their clients are using BIM
2
on more than 15% of their projects, compared to 16%
who perceive a similarly high level of use among their
competitors.
less than 15% of infrastructure projects. Perceived A/E Firm and Contractor Use of BIM
NU_Q6Q7
All of the top five reasons for delaying the adoption of Top Reasons for Delaying the Adoption of
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
BIM for infrastructure were selected by over 40% of the BIM for Infrastructure
non-user respondents. This demonstrates that several Source: McGraw-Hill Construction, 2012
NU_Q10
When non-users were asked to rate the importance of Top Influences on the Decision to Not Use
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
factors that impact their decisions not to use BIM for BIM for Infrastructure
infrastructure projects, the overwhelmingly dominant Source: McGraw-Hill Construction, 2012
CONTRACTORS 35%
Contractors show the least concern with interoperability 22%
issues related to existing authoring tools. 25%
Even more than the factors that prevent BIM adoption, Top Factors That Can Drive Non-User Adoption
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
the top factors that drive BIM adoption vary strongly of BIM for Infrastructure
by player type. This is due to the different ways that Source: McGraw-Hill Construction, 2012
these organizations typically use BIM, and again
strongly suggests that the approach to encouraging BIM A/E Firms
adoption needs to vary strongly by player. In particular, Contractors
the greatest differences are between owners and the Owners
other two groups. More Accurate Construction Documents
More accurate construction documents and improved
49%
communications were considered important factors to
59%
drive non-user adoption for buildings in the 2009 BIM
SmartMarket Report. However, reduced construction 73%
costs and schedule is selected as important by more Reduced Construction Costs & Schedule
infrastructure respondents in the current survey than 46%
building respondents in 2009. 59%
61%
Variation by Player
Improved Communication
A/E FIRMS AND CONTRACTORS
41%
Since not enough demand is the top reason influencing
56%
non-adoption among A/E firms and contractors, it is not
52%
surprising that they name owner demand as a top factor
encouraging BIM adoption. Less Time Drafting & More Time Designing*
Another important benefit to these firm types is the 49%
ability to offer new services. 0%
A/E Firms
■■ 0%
A/E firms want proof that BIM will lead to less time Owner Demand**
drafting and more time designing.
44%
■■Contractors 47%
Contractors find the improved ability to do digital 0%
fabrication to be a compelling benefit. MHC’s 2011
Reduced Number of RFIs & Change Orders
Prefabrication and Modularization SmartMarket
40%
Report revealed the importance of BIM to encourage
prefabrication in vertical construction, and the same 44%
principle clearly applies in infrastructure for contractors. 57%
OWNERS
* Asked of A/E Firms Only
Owners feel most strongly about benefits that would ** Asked of A/E Firms and Contractors Only
accrue directly to projects, likely due to the fact that
project outcomes are the main way that they measure
performance.
• More Accurate Construction Documents: 73%
MHC’s 2010 Green BIM SmartMarket Report, industry
• Reduced Construction Cost and Schedule: 61% Nu_Q8
practitioners who use BIM for green projects reported
• Reduced Number of RFIs and Change Orders: 57%
significant benefits in conducting energy modeling and
Owners are also interested in seeing evidence that BIM improving building performance, and they indicated
will improve operations and maintenance (O&M), as the value that greater use of BIM to monitor building
well as their ability to do sustainable construction. In performance for greener O&M would provide.
C
omplex park projects, “The fountain work was the Undulation on the site created
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
particularly those in urban most complicated part,” says Jeff challenges with grade changes. “We
areas, can face a myriad Ruschau, project executive at Messer modeled the [topography] and found
of civil, structural and Construction. “We didn’t have any that some of the pipe came up into the
hydrological challenges. As with opportunities to make mistakes.” frost line, so we had to move that,”
vertical buildings, multiple overlapping Seven different entities on the project, says Mike Kaiser, virtual construction
systems create ample reasons for some including the fountain contractor, modeler at Messer.
designers and contractors to model were involved in modeling the site. The team also held regular model
park projects . The architect provided the team with reviews with the owner. “They were
DWG [drawing] files. Messer modeled able to visualize the piping,” Kaiser
Scioto Riverfront some architectural features, structural, says. “They had concerns about
A $44 million transformation of the topography, some civil elements and access around the pumps and head
Scioto Riverfront in Columbus, Ohio, the existing utilities in-house. The clearance, which they were able to
into grand public spaces spurred electrical contractor modeled its own identify in the model.”
the first use of BIM for underground elements, and the civil contractor Additional design changes were
modeling on a public project in Ohio. modeled storm-sewer and water lines. made to the fountains while the project
The five-acre project, which broke “We knew we had a one-time shot was underway, which caused changes
ground in 2009, features a promenade, at this,” Ruschau says. “We needed in the piping. “Without a model, it would
a plaza, numerous green spaces everyone to weigh in about everything have been a real challenge to figure
and the 15,000 square foot signature going into the ground.” out if we could accommodate these
Scioto Mile Fountain. The fountain Large concrete and stone architectural changes,” Ruschau says.
features five stainless steel halos features were built above much of The coordination effort paid off. No
that reach up to 24 feet in height and the piping on the site. The granite was underground rework was required.
support more than 1,000 nozzles. An prefabricated and shipped to the site, Kaiser estimates that between the
additional 1,000 ground-level jets can so piping had to align perfectly with model coordination and streamlined
propel water up to 70 feet in the air. the nozzle openings. The stainless redesign process, the team saved
Due to the complexity of the steel features were also in the model, roughly half the time that would have
fountain, the team chose to model the including how they were bolted down. been required for those tasks on a
project’s five miles of underground Among the team’s early discoveries traditional project. Overall, the project
plumbing and electrical conduit. was a 12-foot-wide by 7-foot-high came in five months ahead of schedule
Piping was as large as 14 inches in stormwater outfall that would have and under budget.
diameter and was stacked up to 7 interfered with the fountain’s foundation The owner was also provided
pipes deep. and piping design. with a 3D model for future facilities
management.
3D models.
Subgrade utilities run throughout the
seven-acre site, which is being topped
At the Dallas Arboretum, subgrade utilities, structural piers and setbacks around with numerous landscape features
each of the park’s hundreds of trees were modeled for coordination. that will require hundreds of piers. In
CONTINUED
U
N
ca
TI
N
CO
know how this job could have been feel and some character.” this system pouring in,” Fleming recalls.
done effectively in 2D,” he adds. The river was designed to curve “Our assumptions proved out, and
gently through the plaza, featuring a everything survived.” ■
Saw Mill River new public park along its banks and a
Modeling played a critical role in pedestrian bridge crossing. Adjacent
restoring public access to the Saw water mains, sanitary sewer and
Determining the most important drivers of value in the Most Important Factors for Increasing
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
future is important since these drivers will encourage BIM Value on Infrastructure Projects
wider adoption, accelerate user implementation and Source: McGraw-Hill Construction, 2012
When current users were asked to identify the areas Areas Requiring Assistance in Implementing
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE DATA
where they need help in order to increase their BIM for Infrastructure
implementation of BIM for infrastructure, a significant Source: McGraw-Hill Construction, 2012
BIM adoption for infrastructure also useful information downstream many trade contractors. You’ve got
is behind adoption on vertical for both quantity analysis and work a lot of self-perform people who do
building projects. What’s your sequencing. And once you have all of their own work with their own
perspective on that? that, uploading that data into your equipment. It’s not like the building
JARBOE: It’s a somewhat natural field equipment will lend itself to side where a significant portion is
progression. With buildings, some GPS surveying and automated subcontracted.
of the biggest benefits are clash machine data systems to increase
detection and spatial coordination your field efficiency and reduce What are your thoughts
of very complex systems in close potential safety issues. about the future of BIM
proximity to each other, which are for infrastructure?
very difficult to accurately coordinate What are the unique cultural JARBOE: I’ll give you an example.
with traditional 2D drawings. This issues related to using BIM on A contractor I know is using state-
gave a lot of people very early infrastructure work? standard details they’ve entered
incentive to begin using BIM to JARBOE: One issue that has to be dealt into their computer. When a job
avoid problems. Then mechanical with is the willingness of the owners requires a retaining wall, they draw
and structural subcontractors found and designers to share their electronic two dots and a straight line, and the
they could fabricate directly from designs. Liability concerns are the computer generates that wall based
the model, which improved their biggest impediment in this area. We on the design criteria and the state
quality and cost. It also expedited the went through that on the building side standard details. They add in the
schedule. And now we have CIM, civil too, but it’s an issue that needs to be grades, and it makes the wall smaller
information modeling. resolved. Also, contracts are design- or larger, whatever is required. It also
bid-build in many of these types of generates all the quantities. The same
Are there benefits of BIM that projects, and they really haven’t started thing is true with trenching. There’s
are unique to infrastructure to use alternative procurement. There also modeling of bridges where you
projects? hasn’t been the incentive yet. These are locate the post-tension strands and
JARBOE: Yes, there are several, cultural changes on the procurement elevations for your embeds. In all
actually. CIM offers many of side. Once you do that, and people start these areas, things will really start to
the same conflict identification to use it and see the benefit of it, they’ll speed up. ■
attributes, such as identifying and become adopters.
resolving utility conflicts or other
unknown underground conditions. How do you get other companies
These are important because they on a project team to use BIM in
have a significant impact on traffic the ways that you want them to?
movements helping resolve issues JARBOE: It’s a bit simpler on the
once construction has begun. It’s civil side because you don’t have as
McGraw-Hill Construction (MHC) in the past year to be considered valid. • Non-Users: State that they
THE BUSINESS VALUE OF BIM FOR INFRASTRUCTURE
conducted the 2011 Infrastructure The following are the types of are “not using BIM” or “don’t
Building Information Modeling Study to infrastructure projects conducted by understand BIM.”
assess the overall incidence of the use of the respondents, by the percentage of • Users: State that they are
BIM on infrastructure projects and gauge responses for each type: “creating models,” “using but not
the value that organizations perceive • Roads and Bridges: 24% creating models,” or “creating and
they are receiving by implementing • Water (Drinking / Waste / Stormwater): analyzing models.”
BIM on such projects. The research was 21%
conducted through an Internet survey • Other Transportation (Aviation, Rail, In the analysis, the respondents were
industry professionals between October Transit): 17% grouped into three categories:
25 and November 22, 2011. The 466 • Public Parks and Recreation: 10% • A/E Firms: All respondents who work
respondents sample size benchmarks at • Energy: 9% at architecture, engineering or A/E
a 95% confidence interval with a margin • Dams, Levees, Inland Waterways: firms (Note that at times responses
of error of less than 5%. 8% from architects and engineers are
The sample for the study was • Hazardous / Solid Waste: 7% analyzed individually.)
provided by five associations plus • Other: 4% • Contractors: Construction managers,
players in MHC’s proprietary databases. general contractors, speciality
In the data analysis, respondents are
The respondents were screened based contractors and fabricators
classified as BIM users or non-users
on their involvement in infrastructure • Owners: Owners and all remaining
based on their use of BIM on
projects. All respondents were required respondents, such as consultants
infrastructure projects.
to have worked on infrastructure projects and educators n
Meth_Chart
SmartMarket Report
Resources
Organizations, websites and publications that can help you
get smarter about using BIM for infrastructure projects.
ACKNOWLEDGEMENTS:
The authors wish to thank our premier partners, Autodesk and the
American Society of Civil Engineers, for helping us bring this information
McGraw Hill Construction to the market. Specifically, we would like to thank Phil Bernstein and
Main Website : construction.com Catherine Palmer of Autodesk for their long-standing support of McGraw-
Research & Analytics : Hill Construction research. Additionally, we would like to thank Pat Natale
construction.com/market_research and Jim Rossberg at ASCE.
Engineering News-Record : enr.com
Architectural Record : archrecord.com We would also like to thank Jay Mezher of Parsons Brinckerhoff and Eric
GreenSource : greensourcemag.com Cylwik of Sundt Construction for their insight and expertise. We appreciate
Sweets : sweets.com the participation of Robert Bank of U.S. Army Corps of Engineers; Cory
Dippold of Hatch Mott MacDonald; Richard Humphrey of Autodesk; Joseph
Jarboe of Clark Construction; and Deke Smith of the National Institute of
Building Sciences who agreed to be interviewed and offered their insights.
Finally, we would also like to thank the firms that provided information
about their infrastructure projects and use of BIM in the case studies, as
well as for their assistance in helping us secure images to supplement their
project information.