Professional Documents
Culture Documents
Furuncle Answer Key
Furuncle Answer Key
TO:
TRANSMITAL
NU B R 1433
SIGN, DATE, AND RETURN THE ACKNOWLEDGEMENT FORM WITHIN 10 DAYS TO THE PALISADES
PLANT DOCUMENT CONTROL.
Qa,,,ýv i4 D-te
Protedure Sponsor
NKBrott / 4/2/98
Technical Reviewer Date
DAWatkins / 4/6/98
Table of Contents
Table of Contents
ATTACHMENTS
I
PALISADES NucLEAR PLANT Proc No EI-4.2
EMERGENCY IMPLEMENTING PROCEDURE Revision 14
Page 1 of 14
USER ALERT
INFORMATION USE PROCEDURE
The OSC Director is responsible for overall activation and direction of the
OSC in support of the Technical Support Center (TSC), Engineering and
Maintenance Support Group, Health Physics (HP) Support Group, and
Operational Support Group Chemistry Team.
2.0 PURPOSE
3.0 REFERENCES
3.1 SOURCE DOCUMENTS
5.0 PROCEDURE
USER ALERT
INFORMATION USE PROCEDURE
The OSC provides a control point for onsite and initial offsite (prior to EOF
activation) support involving Chemistry, HP, Maintenance and Operations.
Reference Emergency Implementing Procedure EI-3, "Communications and
Notifications," Attachment 5, "Emergency Response Facilities Phone I
List," for the complete phone list.
PALISADES NUCLEAR PLANT Proc No EI-4.2
EMERGENCY IMPLEMENTING PROCEDURE Revision 14
Page 3 of 14
5.1.3 Organiz•tion
5.1.4 Equipment
5.2 ACTIVATION
NOTE: Quick dispatch of Search and Rescue Teams is vital in case missing
persons need medical assistance.
1. Number of teams.
3. Team(s) location.
7. Meteorological data.
b. Organize and direct the post accident sampling and analysis teams
in accordance with Emergency Implementing Procedure EI-7,
"Emergency Post Accident Sampling Decision Process," as directed
by the TSC.
d. Assist the OSC Director with dispatching AOs from the OSC.
e. Discuss OSC priorities with the other facility TIFs and notify OSC
leadership of impending conflicts.
d. Ensure the 10-mile EPZ map is updated with radiological data from
Offsite Monitoring Teams.
HP Technicians shall:
HP Support shall:
b. AOs will be dispatched from the Control Room until the OSC is
declared operational.
4. Perform assignment.
5.4 EVACUATION/RELOCATION
6.1 ATTACHMENTS
6.2 RECORDS
FAN ROOM
I .:. .Z
OSC-5 oSc #1 OSC $3 o9C #2
04
0
'1.
0
vialnLockaroom
Aoesably Ae.o VI
mainteanc.
Personnel
If
Lunch Room
Assoembly Area V
*OSC Phones
-X 2596 (Chem)
OSC BOARDS -x 2409 (HP)
-X 2410 (HP Communicator)
OSC-1 - OSC Resources -X 2346 (General)
OSC-2 - Emergency Onsite El -Direct Line to TSC
Monitoring Map -X 2109 OSC Director
-X 2110 TIP
OSC-3 - Response Teams -X 764-2730 (FAX)
OSC-4 - Monitoring Team Data** -X 2243 (Maint. Communicator)
OSC-5 - OSC Priorities Board -OSC to Met Tower Line
(HP Radio)
OSC-6 - Onsite Monitoring Board -764-9994 Phone Jack under wall
(Habitability Areas) * phone X2346
OSC-7 - 10-Mile EPZ Map**
OSC-8 - Sequence of Events
Board
-w/Offslte Teams
w/TSC HP
*The OSC Director is responsible for maintaining accountability of AOs after the OSC is declared operational and the Shift
Supervisor has released them to the OSC.
Proc No EI-4.2
Attachment 4
Revision 14
Page 1 of 1
OPERATIONAL SUPPORT CENTER
DOSIMETRY LOG SHEET Dose
Date:
Name Instrument Consumers Location Time Contam Operation Instrument
Type Energy # Out In Out !In OutJ I In Tagged OOS
t I 4. 4 I + I + I +
I -t 4- 4- .4 4- * + 4
4 4. 4- 4. 4 4- 1 4- 4.
4 4- 4 1 1. 1 4. 1 1
7 1 I 4. 1 I 4 4