May 15, 2020-RFP Triumph Trail 7-Eleven Development Re-Tender

Seko Construction (Vancouver) Ltd. is working with Triumph Properties Ltd. on a


commercial project in Trail BC consisting of a new 7-Eleven store. The scope of the
project with 7-Eleven has been evolving, and the project now consists of a convenience
store, fuel sales (consisting of a gas canopy, pumps, and underground fuel tanks), and
a car wash (7-Eleven constructs the fuel island, canopy, tanks, and car wash
themselves).

The architectural and civil drawings have been revised to reflect the latest layout and
plans. The structural, mechanical, and electrical plans reflect the previous building plan,
but are similar in scope and scale and will be sufficient for pricing.

Triumph Properties Ltd. has financing arrangements in place based on a target project
value. Once we confirm the project costing as a result of this tender, final drawing
revisions will be completed and we will proceed with final permits and construction.

The new building is generally of wood frame construction with typical exterior finishes.

Water and sanitary sewer connections will occur in the street as per the civil drawings.
Site servicing contractors must allow for these connections and rehabilitation of the
street / curbs / sidewalks to City of Trail standards.

There is a portion of the existing retaining wall that must be demolished and removed
from site, and it will be replaced by a new retaining wall (See civil drawings and
retaining wall section).

7-Eleven will provide the store retail sales, merchandise, and cooler-freezer equipment.

Seko is inviting trades to tender the work based on the Division 1 through 16 process,
the drawings included in the dropbox link included.

Interested trades are requested to complete the attached intent to quote form with the
required information completed.
Questions or information required will be by RFI attached or email only.

Quotations are be submitted for individual divisions (for cost budget purposes) and
should be fully detailed showing detailed inclusions and exclusions.
PST included, GST show separate. Quotations stating lump sum as per the drawing are
not accepted.

Tender closing Date Tuesday June 2, 2020 end of day

Rob Cameron
Construction Estimating/Manager

P: 604.946.7745
C: 604.999.8631
F: 604.946.7785
www.sekoconstruction.com