Download as pdf or txt
Download as pdf or txt
You are on page 1of 72

SAFER. STRONGER.

SM ARTER

Post-Tensioning
Systems
Contents
About Us 4 Internal Unbonded Wire Tendons 30
History 4 Application Fields 30
Tradition 4 Features 30
DYWIDAG Technology 4 Main Characteristics 30
Comprehensive Service 4 Brief Description 31
DYWIDAG – Today 5
Milestones 6 Internal Unbonded Bar Tendons 32
Application Fields 32
Post-Tensioning Design 8 Features 32
Bonded Post-Tensioning 9 Main Characteristics 32
Internal unbonded Post-Tensioning 9 Bar Types 32
External Post-Tensioning 9 Corrosion Protection for Unbonded Bar Tendons 33
Anchorages 34
Internal Bonded Post-Tensioning Systems 10 Anchor Plates 34
Ducts 10 Coupler 34

Bonded Strand Tendons 11 External Unbonded Post-Tensioning Systems 36


Application Fields 11
Features 11 External Unbonded Strand Tendons 36
Main Characteristics 11 Applications 36
Features 36
Anchorages 12 Main Characteristics 36
Multiple Anchorage MA - Standard Application Anchorage 37
up to 22 Strands 12
Multiple Anchorage MA – Application with 27 External One-Strand Tendons with Monostrands 39
or more strands and Special Application 12 Applications 39
Fixed Anchorage MP– Standard Application Features 39
up to 22 Strands 13 Main Characteristics 39
Fixed Anchorage MP – Special Application 13 Anchorage 39
Plate Anchorage SD 14
Flat Multiplane Anchorage FMA 14 External Unbonded Wire Tendons 40
Bond Head Anchorage HL/HR 15 Applications 40
Loop Anchorage HV 15 Features 40
Main Characteristics 40
Coupler 16 Anchorage 41
Coupler R 16 Coupler 43
Coupler K 16 Deviator 44
Coupler D 17 Tendons with Duct 44
Coupler V 17
Floating Anchorage Block MZ 18 External Unbonded Bar Tendons 45
Coupler M/ME 18 Applications 45
Features 45
Bonded Bar Tendons 19 Main Characteristics 45
Application Fields 19 Anchorage 45
Features 19
Assembly and Installation 46
Main Characteristics 19
Installation 46
Bar Types 20 Stressing 56
Thread Bar WR 20 Corossion Protection 60
Plain Bar WS 21
Equipment 65
Anchorages 22
Anchor Plates 22 Installation Devices 65
Coupler 23 Stressing Jacks 66
Special Application – Repair and Strengthening 23 Hydraulic Devices 66
Grout Mixer with Pump 67
Internal Unbonded Post-Tensioning Systems 24 Vacuum Grouting Devices 67

Internal Unbonded Strand Tendons 25 Services 68


Application Fields 25 Engineering Service (Consulting, Detailing And Design) 68
Features 25 Production and Supply of Tendons 68
Main Characteristics 25 Complete Installation 68
Supervising of Stressing 69
Monostrand Tendons 26 Monitoring 69
Application Fields 26 Survey of Existing Tendons 69
Features 26 Tendon Replacement/Strengthening of Prestressed
Main Characteristics 26 Concrete Structure 70
One-piece Casting for Fixed and Stressing Anchor 26 Temporary Tendons 70
Anchorages 27 Training and Certification of Stressing Personnel 70
Coupler 28
About Us
History Tradition
Today, DYWIDAG is a globally active Our long tradition began in 1950 with the The DYWIDAG Group was founded to
supplier of innovative systems and distribution of know-how developed by market DYWIDAG systems and technical
technologies for the construction Dyckerhoff & Widmann AG. The strong know-how worldwide and to develop
industry. growth and increasing globalization in new innovative systems through its own
the distribution of innovative DYWIDAG R&D activities, thereby expanding the
DYWIDAG's origins go back to the systems led to the bundling of activities products and systems offered. From
foundation of Dyckerhoff & Widmann within a specialized organizational unit the very beginning, DYWIDAG has been
AG in 1865 and thus to the beginnings in 1979. internationally active. We are operating
of industrial construction. in the fields of Post-Tensioning,
Geotechnical Engineering and Lifespan
Management.

Dywidag technology
DYWIDAG develops, produces and DYWIDAG and SUSPA Strand Post- DYWIDAG and SUSPA Post-Tensioning
distributes Post-Tensioning Systems Tensioning Systems are used worldwide Systems are tested according to
for the most demanding requirements for bridges, buildings and dams. Due European Directives and are certified
worldwide. to the variable number of strands, our according to European Technical
systems offer a high degree of flexibility Assessments (ETA).
DYWIDAG and SUSPA Post-Tensioning and are always adapted to the individual
Systems are characterized by their needs of our customers. Tensioned cables are used worldwide in
excellent load-bearing capacity as well bridge construction. Depending on the
as the durability and clear design of the DYWIDAG Bar Tendons have stood project, customers can choose either
systems. They enable safe, efficient for excellent technology, quality and the DYNA Bond® or the DYNA Grip® stay
and economical use in prestressed reliability for decades. Today, bar cable system. In addition, DYWIDAG
concrete. tendons are mainly used in the field of also develops monitoring systems, such
repair and reinforcement. as the DYNA Force® sensor system, to
Our post-tensioning systems are ensure a complete and economically
extremely versatile and have been cost-effective monitoring of the stay
known by our customers for their cable systems.
reliability for decades.

Comprehensive service
DYWIDAG's global presence is based request, we support our customers For example, we rent and sell
on a decentralized corporate structure. in instructing the construction site Prestressing jacks or grout mixers
With its own companies, licensees and personnel on site and, if necessary, also with the appropriate accessories. Of
agents in over 90 countries, DYWIDAG take over the complete installation of course, our services also include the
is represented on all continents. This our products and systems in selective professional calibration, maintenance
means that you, our local customers, markets. and repair of all equipment.
can reach us directly at any time.
As a leading system supplier, we can
We advise project-involved planners and also provide the entire equipment
engineering offices on implementation technology for safe and smooth
and are happy to provide CAD drawings installation on request.
and dimensioning aids at any time. On

4
About us
DYWIDAG – Today
Today, DYWIDAG is the market leader DYWIDAG is represented in more SAFER, STRONGER, AND
in the development, production and than 90 countries and thus on all SMARTER.
supply of Post-Tensioning Systems continents either by its own DYWIDAG
and Geotechnical Systems as well companies or through licensees and
as Concrete Accessories for the agents. Our products and systems
construction industry. More than 1,350 are manufactured locally in over 15
highly motivated employees worldwide production facilities worldwide. This
develop, produce and install innovative local presence, combined with globally
products and systems that meet the available know-how, forms the strength
highest quality standards. of the DYWIDAG network in accordance
with our vision.

Research and development Customer focus Ethic values


We actively drive new technical We put the needs and requirements DYWIDAG is known throughout the
developments and research projects. of our customers and business world as a strong business partner
Worldwide patent applications prove our partners first. We offer our customers and supplier. Our customers enjoy
leading position and are the cornerstone the advantages of an internationally working with us because we meet their
of our successful work - for your benefit. recognized system supplier with a expectations. Our employees enjoy
With our range of innovative products comprehensive product range that is working for DYWIDAG - because we
and systems, which always meet the optimally adapted to local needs. respect and trust each other. This helps
highest quality standards, we offer us to provide our services.
sustainable solutions that meet the Sustainability
continuously changing requirements We are committed to sustainability at all The foundation of this development
of our target markets. It is our declared levels and everywhere. For DYWIDAG, is our well-deserved reputation for
goal to always be at least one step sustainability means finding the integrity, honesty and ethical behavior
ahead in this exciting environment of right balance between financial and in our business relationships and at our
technical development. economic performance, social concerns workplaces. We stand by our values and
and our environment. have a zero-tolerance strategy towards
unethical behavior and violations of the
law.

5
Milestones

1904 1925 1927


■ Railway bridges near Kempten, ■ Construction of planetariums, System ■ Saalebrücke Alsleben, Germany
Germany Zeiss- DYWIDAG ■ First bridge with prestressed iron
■ Tamped concrete, longest span: ■ Nuremberg, Dresden, Berlin, Germany tension band, developed by Dr. Ing.
64.50 m Franz Dischinger

1953 1964 1970


■ First prestressed concrete bridge over ■ Bendorf Bridge, Germany ■ BMW administration building Munich,
the Rhine: The Nibelungen Bridge, ■ A new world record in prestressed Germany
Worms, Germany concrete: length: 524.70 m ■ 100 m high hanging house with
■ Longest span: 114 m 72,000 m² usable area. Construction
of the floors at ground level, then
lifting them to their final position
using the DYWIDAG Bar Post-
Tensioning System
■ DYWIDAG Bar Post-Tensioning
System and DYWIDAG Lifting Method

6
About us
1975 1988 2002
■ Construction of the CN-Towers, ■ Olympic Bridge, Seoul, Korea ■ Chancellor's Office Berlin
Toronto, Kanada ■ Development, production, delivery and ■ Largest German application of
■ 550 m high television tower with installation of DYWIDAG stay cables monostrands
restaurant platform. Upper tower
shaft made of DYWIDAG Prestressed
Concrete

2004 2012 2013


■ Snøhvit, Melkøya, Norway ■ Harbor Drive Pedestrian Bridge, San ■ Optimization of prestressing systems
■ Supply and installation of 1,650 t Diego, CA, USA for the construction of prestressed
cryogenic strand tendons for the ■ DYWIDAG supplies Post-Tensioning concrete and hybrid towers for wind
construction of four LNG tanks Systems for one of the longest self- turbines
anchored pedestrian suspension ■ Supply and installation of more than
bridges in the world. This project was 1,000 wind turbines on 4 continents in
awarded the "Best of the Best" prize the following years
by Engineering News Record (ENR)

2014 2018 2018


■ Chao Praya Bridge, Thailand ■ Gaildorf wind farm ■ Bridge A59 over the Wupper,
■ Development, supply and installation ■ Completion of the wind turbine with Leverkusen
of extradosed DYWIDAG Cable the world's highest hub height of ■ Supply and installation of DYWIDAG
Systems 178 m (natural power storage) Bar Tendons and SUSPA-Wire EX
■ Installation of a global monitoring ■ Supply of SUSPA EX and DYWIDAG Tendons to reinforce the bridge deck
system and initial installation of the Strand Tendons
DYNA® Link anchor box

7
Post-Tensioning Design
Prestressing of components generates Prestressing of concrete members with Bonded or unbonded, internal or
compressive stresses counteracting immediate bond, restricted to straight- external post-tensioned tendons are
tensile stresses from loads and line tensile elements only, requires a used for any tendon course, high
constraints. This largely avoids production plant and is therefore usually stressing forces and stressing on-site.
cracking in concrete members in the used for prestressed precast concrete
serviceability state. High-strength units.
prestressing steel tensile elements in
the form of strands, wires or bars are
used for stressing.

Post-Tensioning
Systems

Internal External

Bonded Unbonded Unbonded

Monostrand Monostrand
Strand PT Bar PT Wire PT Bar PT Strand PT Wire PT Bar PT
PT PT

■ Bridges ■ Repair & ■ Bridges ■ Bridges ■ Industrial ■ Bridges ■ Tanks ■ Bridges ■ Repair &
■ Buildings Strength- ■ Tanks building ■ Repair & ■ Wind ■ Wind Strength-
ening ■ Pier Head Strength- Towers Towers ening
■ Wind ■ Slabs
■ Railway / Base ening ■ Pier Head
Towers ■ Repair &
■ Underpass Anchorage Strength- / Base
■ Repair & ening Anchorage
Strength-
ening

8
Bonded post-tensioning
In case of bonded post-tensioned The stressing anchorage must be fully At construction joints, non-continuous
members, the tendons initially lie accessible for the stressing process, tendons can be stressed by means
slack in ducts during concreting or are whereas the fixed anchor can be of couplers in the already concreted
inserted into empty ducts of the already located anywhere within the structure. construction section and then strands
concreted members. can be fixed for the subsequent
Strand tendons with up to 55 strands construction section.
Besides sheet metal ducts, DYWIDAG can be installed in virtually any
offers plastic ducts as well. geometry. Plate anchorages and Bar tendons are applied for short and
multi-plane anchorages are available mainly straight tendon courses. The
After sufficient curing of the concrete, for anchoring. Further, bond anchors low-slip anchorage with nuts allows for
the tendons are stressed against the are also possible with anchors cast-in low losses of prestressing force, even
concrete. Then the ducts are grouted concrete. with short bars.
with cement grout. Grouting develops
bond between the tendons and the
concrete and additionally provides
corrosion protection due to the alkaline
cement grout.

Internal unbonded post-tensioning


Post-tensioning of unbonded internal Systems with double PE sheathing are Therefore, compact bundles of parallel
tendons follows the principles of used in case the monostrands shall be wires in thick-walled plastic ducts are
bonded post-tensioning. Instead exchangeable or shall satisfy special preferred for unbonded longitudinal
of grouting with cement grout, requirements. Internally unbonded post-tensioning. For internal unbonded
the tendons are protected against longitudinal post-tensioning with tendons, a stressing force check is
corrosion before or after stressing with monostrands is technically feasible, but possible by means of lift-off tests or
grease or similar corrosion protection with the amount of typically required built-in load cells. If required, these
compounds in plastic sheaths. Tendons prestressing steel, this leads to a strong tendons can also be re-stressed later
consisting of bundled, greased and cross-sectional weakening, which must provided the stressing anchors are
PE-sheathed monostrand tendons are be considered in the shear force design. accessible.
used in building construction and for
transversal post-tensioning of bridges.

External post-tensioning
External tendons are guided outside the External tendons with strands and
concrete cross-section and either run wires are used in bridge construction
straight between the end anchorages or and for prestressing of wind farms with
are deflected at cross beams, saddles concrete and hybrid towers.
etc.
External bar tendons are mainly used
Tendons for external prestressing for strengthening of buildings. A major
consist of individual PE-coated strands field of application here is strengthening
protected against corrosion by grease, against shear stress, whereby bar
which are bundled in a PE pipe or wire tendons are arranged vertically outside
bundles in grease filled sheaths. the webs and can replace missing
stirrup reinforcement accordingly.

9
Internal Bonded
Post-Tensioning Systems
Ducts
Metal sheet ducts
■ Round ■ Flat
■ Strand and Bar ■ Strand up to 5 strands only

PE/PP-Ducts
■ Round ■ Flat
■ Strand and Bar ■ Strand up to 5 strands only

10
Bonded Strand Tendons

Internal tensioning system


Applications Features
■ Bridges ■ Prefabrication or On-site Production ■ Cryogenic Application
■ Tanks & Silos possible ■ LNG-Tanks

■ Slabs ■ Electrically isolated Version available ■ Metal Sheet or Plastic Ducts available
■ Round

■ Oval

Bonded
Main characteristics

Minimum Tendon Size 1 Strand


Maximum Tendon Size 55 Strands
Steel Grade of Strands Y1770, Y1860
Strand Diameter 0.5", 0.6", 0.62"
Corrosion Protection Cement Grout, Special Grout
Replacement possible No
Restressing possible No
Coupling possible Yes
Possible Tendon Course Curved and straight

11
Anchorages
Multiple anchorage MA – Standard application up to 22 strands
■ 5-22 Strands ■ Longitudinal Post-Tensioning of ■ ETA-13/0815
■ Helix not required Beams and Bridges ■ ETA-13/0839
■ Minimum Concrete Compressive ■ Horizontal Post-Tensioning of Tanks
Strength from 34 N/mm2 (Cube) at (Silos, LNG)
Time of Stressing

DYWIDAG System SUSPA System

Multiplane anchorage MA – Application with 27 or more strands and special application


■ 5-55 Strands (Cube) at Time of Stressing
■ Optimized Center Distances ■ Longitudinal Post-Tensioning of
compared to Standard Application Bridge Girders
by Use of Helical and Stirrup ■ Horizontal Post-Tensioning of Tanks
Reinforcement (Silos, LNG)
■ Electrically isolated Version available ■ ETA-13/0815
■ Minimum Concrete Compressive ■ ETA-13/0839
Strength already from 25 N/mm2

System DYWIDAG with helix System SUSPA with helix Electrically isolated

12
Internal tensioning system
Fixed anchorage MP – Standard application up to 22 strands
■ 5-22 Strands ■ Minimum Concrete Compressive ■ Preferred Fixed Anchorage for
■ In Conjunction with SUSPA System Strength from 34 N/mm2 (Cube) Prefabricated Tendons in Bridges
MA Stressing Anchorage ■ ETA-13/0839
■ Immediate Casting in Concrete
possible - Reduced Formwork
Expenditure

Bonded
System SUSPA

Strand
Fixed anchorage MP – Special application
■ 5-22 Strands ■ Minimum Concrete Compressive ■ Prefabricated Tendons in Bridges
■ In Conjunction with SUSPA System MA Strength already from 25 N/mm2 (Cube) ■ ETA-13/0839
Stressing Anchorage at Time of Stressing
■ Center Distances optimized by
Installation of Helical Reinforcement
compared to Standard Application

System SUSPA

13
Plate anchorage SD
■ 3-9 Strands ■ Minimum Concrete Compressive ■ Transversal Post-Tensioning in
■ ETA-13/0815 Strength from 30 N/mm2 (Cube) at Bridges, Floor Slabs, Tanks and Silos
Time of Stressing

Flat multiplane anchorage FMA


■ 2-5 Strands ■ Minimum Concrete Compressive ■ For Floor Slabs
Strenght from 25 N/mm² (Cube) at
Time of Stressing

14
Bond head anchorage HL/HR
■ 3-22 Strands ■ Minimum Concrete Compressive ■ ETA-13/0839

Internal tensioning system


■ Cast-in Fixed Anchorage Strength from 34 N/mm2 (Cube) at
■ Reduced Formwork Expenditure Time of Stressing

Bonded
Strand
Loop anchorage HV
■ 3-22 Strands ■ Minimum Concrete Compressive ■ German Approval Z-13.1-148
■ Vertical Tendons for Tanks Strength from 28 N/mm2 (Cube) at
Time of Stressing

15
Coupler
Coupler R
■ 5-37 Strands ■ Prefabricated ■ ETA-13/0815
■ Fixed Coupler ■ Bridges

Coupler K
■ 3-22 Strands ■ Fixed Coupler ■ Bridges
■ Quick Installation in Conjunction with ■ Enables Electrically Isolated Execution ■ ETA-13/0839
Compression Fittings

16
Internal tensioning system
Coupler D
■ 5-37 Strands ■ Bridges ■ ETA-13/0815
■ Movable Coupler

Bonded
Strand
Coupler V
■ 3-22 Strands ■ Movable Coupler ■ Bridges
■ Quick Installation in Conjunction with ■ Enables Electrically Isolated Execution ■ ETA-13/0839
Compression Fittings

17
Floating anchorage block MZ
■ 2-8 Strands ■ Post-Tensioning of Tanks ■ ETA-13/0839
■ Fixed Floating Anchorage Block

Coupler M/ME
■ 1-12 Strands ■ Movable Coupler ■ Tanks and Strengthening of Pipelines

18
Bonded Bar Tendons

Internal tensioning system


Applications Features
■ Connection of Precast Members ■ Low slip Anchorages
■ Tensioning of Launching Noses ■ WS Bar Tendons for short Lengths
■ Fixation or Tie-back Anchorage of < 2,5 m
Steel Structures ■ WR Bar Tendons for Lengths > 2,5 m
■ Transversal Post-Tensioning ■ Possible with Metal Sheet or Plastic
■ Strengthening of buildings, bridges, Duct

Bonded
and civil engineering structures

Strand
Main characteristics

Minimum Tendon Size 18 mm


Maximum Tendon Size 75 mm
Steel Grade of Bar Y1030, Y1050
Bar Types WR/WS
Corrosion Protection Cement Grout, Special Grout
Replacement possible No
Restressing possible No
Coupling possible Yes
Possible Tendon Course Mainly straight

19
Bars Types
WR
■ Diameter 18-75 mm ■ Can be divided and coupled in any
■ Continuous hot-rolled Thread Section
■ Coarse Thread – robust and ■ Constant Young’s Modulus by factory-
appropriate for on-site Conditions controlled Elongation of the Thread
Bar Steel
■ Available for a large Range of
Diameter ■ Continuous Quality Inspection and
Control

WR bar types
Bar Types
Designation Unit
18 WR 26 WR 32 WR 36 WR 40 WR 47 WR 57 WR 65 WR 75 WR
Nominal diameter mm 17.5 26,5 32 36 40 47 57 65 75
Nominal cross sectional
mm² 241 552 804 1,018 1,257 1,735 2,581 3,331 4,418
area
Characteristic breaking
kN 255 580 845 1,070 1,320 1,820 2,671 3,447 4,572
load
Maximum initinal
stressing force 1) kN 204 464 676 856 1,056 1,457 1,940 2,502 3,321
Pm0,max = Sn x 0.8 x fp,k

Max. overstressing 2)
kN 219 499 722 912 1,131 1,566 2,047 2,641 3,508
P0,max= Sn x 0.95 x fp0,1k
ETA-05/0123 – X X X X X X
Z-13.71/72/73-50123 – X X X X X
1)
The specified values relate to maximum values according to EN 1992-1-1, e.g. (k1 x fpk, k2 x fp0,1k).
2)
Overstressing is allowed in case the stressing jack can be read with a precision of ±5% (possible outside of Germany).

20
tensioning system
WS

InternalSpannsysteme
■ Diameter 26-40 mm ■ Continuous Quality Inspection and
■ Cold-rolled Thread on either Side – Control
low Anchorage Slip

Interne
■ Constant Young’s Modulus by
factory-controlled Elongation of the
Thread Bar Steel

Verbund
MitBonded
WS bar types

Bar
Bar Types
Designation Unit
26 WS 32 WS 36 WS 40 WS
Nominal Diameter mm 26.5 32 36 40
Nominal cross sectional
mm² 552 804 1,018 1,257
area
Characteristic breaking
kN 580 845 1,070 1,320
load
Maximum initial stressing
force1 1) kN 464 676 856 1.059
Pm0,max = Sn x 0.8 x fp,k

Maximum overstressing
force 2) kN 499 722 912 1.131
P0,max= Sn x 0.95 x fp0,1k
ETA-05/0123 – 3)
X X 3)

Z-13.71/72/73-50123 – 3)
X X 3)

1)
The specified values relate to maximum values according to EN 1992-1-1, e.g. (k1 x fpk, k2 x fp0,1k).
2)
Overstressing is allowed in case the stressing jack can be read with a precision of ±5% (possible outside of Germany).
3)
Without approval

21
Anchorages
SYSTEM OVERVIEW
WR Bar Type WS Bar Type
Anchor
Designation 18 26 32 36 40 47 57 65 75 26 32 36 40
Plate
WR WR WR WR WR WR WR WR WR WS WS WS WS

Bonded bar tendon with


QR-plate anchorage
2074 X X X X X
with additional
reinforcement

Bonded bar tendon with


small solid rectangular
plate anchorage 2076 X X X X X X X X X X
with additional
reinforcement

Bonded bar tendon with


QR-plate anchorage
2074 X X X X X
without additional
reinforcement

Bonded bar tendon with


small solid rectangular
plate anchorage 2076 X X X X X X X X X X
without additional
reinforcement
Bonded bar tendon with
small solid square plate
anchorage 2011 X X X X X X X X X X X X X
without additional
reinforcement
Bonded bar tendon with
solid rectangular plate
anchorage 2012 X X X X X X X X X X
with additional
reinforcement

Anchor plates
Solid square plate without additional reinforcement Solid rectangular plate with additional reinforcement
2011 2012

2011 2012

2074 2076

22
Coupler
Standard application

tensioning system
Coupling with equal diameter of the same bar type

InternalSpannsysteme
Interne
Verbund
MitBonded
Bar
Special application – extension and strengthening of existing structures
1. Coupling with equal diameter of different bar types 2. Coupling of the same bar type but with different diameter
■ Connection of a plain bar with cold-rolled thread to an ■ For strengthening or extension of existing structures
existing thread bar for minimizing anchorage slip ■ Also applicable for connection to former bar types in
existing structures

23
Internal Unbonded Post-Tensioning
Systems
■ Internal unbonded tendons are not ■ Grease, wax, or gel in a plastic duct ■ Highest quality of corrosion protection
rigidly bonded to surrounding concrete. provides corrosion protection in case of prefabrication
■ Low induced stress range ■ Requirements for crack widths as on
■ Corrosion protection is usually
■ Less fretting fatigue reinforced concrete members
prefabricated with the tendon,
■ Monitoring of stressing forces ■ More favorable conditions for
delivered to site, and installed
■ Restressing possible, if required decompression check
■ Replaceable, if required

24
Internal Unbonded Strand Tendons

tensioning system
Applications Features

InternalSpannsysteme
■ Bridges ■ Factory or on-site Production possible
■ Containers (e.g. Tanks, Silos) ■ Electrically isolated Version available
Slab Systems

Interne

Verbund
Unbonded
Main characteristics

Mit
Minimum Tendon Size 1 Strand
Maximum Tendon Size 55 Strands
Steel Grade of Strands Y1770, Y1860
Strand Diameter 0.5", 0.6", 0.62"
Corrosion Protection Cement Grout, Special Grout
Replacement possible System-dependent
Restressing possible System-dependent
Coupling possible Yes
Possible Tendon Course Curved and straight

25
Monostrand Tendons
Applications Features
■ Bridges, Transversal and – ■ Factory or on-site production possible ■ Additional PE-sheathing for bridges
occasionally – longitudinal Post- ■ No grouting operations required on site in case the option for replacement is
Tensioning required
■ High-quality prefabricated
■ Tanks, Ring Tendons Monostrands do not require additional
■ Buildings, Slab Systems ducts to ensure corrosion protection

Main characteristics

Minimum Tendon Size 1 Strand


Maximum Tendon Size 7 Strands
Steel Grade of Strands Y1770, Y1860
Strand Diameter 0.6”, 0.62”
Corrosion Protection PE-Sheathing and Corrosion Protection Compound
Replacement possible Yes
Restressing possible Yes
Coupling possible Yes
Possible Tendon Course Curved and straight

One-piece casting for fixed and stressing anchor


■ 1-7 Strands ■ Minimum Concrete Compressive ■ Transversal Post-Tensioning in Road
■ Z-13.2-147, ETA/19-0077 Strength from ab 23 N/mm2 (Cube) at Bridge Slabs
Time of Stressing ■ Slabs

MGS stressing anchor MGF fixed anchor

SKM stressing anchor SFM fixed anchor

26
Internal tensioning system
Anchorages
Plate anchorages MER, MEF
■ 2-5 Strands ■ Minimum Concrete Compressive ■ Replaceable and restressable
■ Z-13.2-113 Strength from 20 N/mm2 (Cube) at Time longitudinal Post-Tensioning of Bridge
of Stressing Girders
■ ETA-03/0036

Unbonded
MER stressing anchor MEF fixed anchor

Strand

Single anchorage in conjunction with EV


precast concrete members
■ 1 Strand
■ Post-Tensioning of Tanks and Silos
■ Minimum Concrete Compressive Strength from
30 N/mm2 (Cube) at Time of Stressing
■ Z-13.2.95

27
Ring anchorage for insitu concrete
solutions
■ 2-12 Strands
■ Minimum Concrete Compressive
Strength from 30 N/mm2 (Cube) at
Time of Stressing
■ Post-Tensioning of Tanks and Silos
■ Z-13.2.40

Anchor head MZ

Coupler FKM fixed coupler BK movable coupler

FKM, BK
■ 1-7 Strands
■ Buildings
■ ETA-03/0036
■ Z-13.2-147

28
29
Strand Unbonded Internal tensioning system
Internal Unbonded Wire Tendons
Applications Features
■ Occasionally as longitudinal Post- ■ Low slip ■ Inspectable (e.g. warning signs
Tensioning for Bridges ■ Prefabrication through the structural behavior)
■ No grouting operations required on
site

Main characteristics

Minimum Tendon Size 30 Wires


Maximum Tendon Size 84 Wires
Steel Grade of Wires Y1670, Y1770
Wire Diameter 7 mm
Corrosion Protection PE-Sheathing and Corrosion Protection Compound
Replacement possible Yes
Restressing possible Yes
Coupling possible Yes, provided no Replacing/Restressing is required
Possible Tendon Course Curved and straight

30
tensioning system
Short description

InternalSpannsysteme
■ 30-84 Wires ■ Minimum Concrete Compressive ■ Longitudinal Post-Tensioning of
■ Z-13.2-109 Strength from 33 N/mm2 (Cube) at Bridge Girders
Time of Stressing

Interne
Verbund
Unbonded
Stressing anchor C Fixed anchor D

Mit
Wire

31
Internal Unbonded Bar Tendons
Applications Features
■ Connection of Precast Members ■ Low slip Anchorages ■ ETA-05/0123 bzw. Z-13.72-50123
■ Pier Cap and Base Anchorage ■ No grouting operations required on ■ Restressable
■ Fixation or Tie-back Anchorage of site
Steel Structures ■ WS Bar Tendons for short Lengths
■ Transversal Post-Tensioning < 2,5 m
■ Strengthening of buildings, bridges, ■ WR Bar Tendons for Lengths > 2,5 m
and civil engineering structures ■ Inspectable

Main characteristics

Minimum Tendon Size 18 mm


Maximum Tendon Size 47 mm
Steel Grade of Bar Y1050
Bar Types WR/WS
■ Heat Shrink Sleeve or DYNA Protect® Bar and PE-Duct
Corrosion Protection
■ Grouting with corrosion protection wax acc. to EAD16
Replacement possible Yes
Restressing possible Yes
Coupling possible Yes
Possible Tendon Course Mainly straight

Bar types
WR WS
■ Diameter 18-47 mm ■ Diameter 26-40 mm
■ Continuous hot-rolled Thread ■ Cold-rolled Thread on either Side with low slip special
■ Specifications see Page 20 Thread
■ Specifications see Page 21

32
tensioning system
Corrosion protection for unbonded bar tendons

InternalSpannsysteme
Injection with corrosion protection wax Heat shrink sleeve
■ Sheathing of the PT steel with PE protection duct and filling ■ Application of suitable heat shrink sleeves with glue layer on
of the annular space with corrosion protection compound the inside

Interne
■ Highest Maximum corrosion protection quality by factory ■ Highest corrosion protection quality by factory production
production ■ Commonly supplied within a PE protection duct
On-site injection possible

Verbund

Unbonded
Injection with cementitious grout
DYNA Protect® Bar Sheathing of the PT steel with PE protection duct and filling

Mit

■ Double layer, machine-wrapped corrosion protection tape of the annular space with corrosion protection compound
■ Commonly supplied within a PE protection duct ■ Highest corrosion protection quality by factory production
■ On-site grouting possible

Stab
Bar

33
Anchorages
System overview
WR Bar Types WS Bar Types
Anchor
Designation 18 26 32 36 40 47 57 65 75 26 32 36 40
Plate
WR WR WR WR WR WR WR WR WR WS WS WS WS
Unbonded and external
bar tendon with solid
square plate anchorage 2011 X X X X X X X X X X X X X
without additional
reinforcement
Unbonded and external
bar tendon with solid
square plate anchorage 2012 X X X X X X X X X X
with additional
reinforcement

Anchor plates
■ For Post-Tensioning operations already from a Concrete
Compressive Strength of 25 N/mm2 (Cube) (e.g. early Time
of Stressing, existing structures with low concrete strength)

Solid square plate without additional reinforcement Solid square plate with additional reinforcement 2012
2011

Coupler
Coupler with constant diameter
■ Coupling of workshop-prefabricated and corrosion protected ■ Installation and grouting of the coupler on site
tendons

34
35
Stab
Bar Mit
Unbonded
Verbund Interne
InternalSpannsysteme
tensioning system
External Unbonded Post-Tensioning
Systems
■ External unbonded tendons are solely connected to the ■ Grease, wax, or gel in a plastic duct provides corrosion
structure in the anchorage and deviation zone; there is no protection
rigid bond to the surrounding concrete ■ Requirements for crack widths as on reinforced concrete

■ Low induced stress range members


■ Less fretting fatigue

■ Monitoring of stressing forces

■ Restressing possible, if required

■ Replaceable, if required

External Unbonded Strand Tendons


Applications Features
■ Bridges ■ Inspectable ■ Electrically Isolated Version available
■ On-site production of even very long ■ Stress measurement with DYNA Force®
tendons possible possible

Main characteristics

Minimum Tendon Size 3 Strands


Maximum Tendon Size 55 Strands
Steel Grade of Strands Y1770, Y1860
Strand Diameter 0.6", 0.62"
Corrosion protection by filling with wax or grease, and cementitious grout in a
Corrosion Protection
PE-duct
Replacement possible Yes, if filled with wax or grease
Restressing possible Yes, if filled with wax or grease
Possible Tendon Course Straight line with deflection on a deviator possible

36
External tensioning system
Anchorages
MA anchorage – standard application up to 22 strands
■ 5-22 Strands ■ Minimum Concrete Compressive ■ Longitudinal Post-Tensioning of
■ No Helix Strength from 34 N/mm2 (Cube) at Bridge Girders
Time of Stressing ■ ETA-13/0979

Unbonded
Strand
System DYWIDAG without helix

MA anchorage – application with 27 or more strands System dywidag with helix


and special application
■ 3-55 Strands
■ ETA-13/0979
■ Optimized Center Distances compared to Standard
Application by Use of Helical Reinforcement
■ Minimum Concrete Compressive Strength from 25 N/mm2
(Cube) at Time of Stressing
■ Longitudinal Post-Tensioning of Bridge Girders

37
Plate anchorage
■ 3-55 Strands ■ Longitudinal Post-Tensioning of Bridge Girders, Strengthening
■ ETA-13/0979 of Bridges for enhanced bending loading capacity
■ Minimum Concrete Compressive Strength from 25 N/mm2
(Cube) at Time of Stressing

38
External Single-Strand Tendons with
Monostrands

External tensioning system


Applications Features
■ Tanks and Silos ■ Inspectable ■ Prefabrication or on-site production
■ Strengthening of girders ■ No grouting operations required on site possible

Unbonded
Main characteristics

Tendon Size 1 Strand

Strand
Steel Grade of Strands Y1770
Strand Diameter 0.6”, 0.62"
Corrosion Protection Double Layer PE-Sheathing and Corrosion Protection Compound
Replacement possible Yes
Restressing possible Yes
Possible Tendon Course Curved and straight

Anchorage
Plate anchorage
■ 1 Strand ■ Minimum Concrete Compressive ■ Ring tendon for tanks and silos,
■ Z-13.3-135 Strength from 30 N/mm2 (Cube) at strengthening of girders in bridges and
Time of Stressing buildings

39
External Unbonded Wire Tendons
Applications Features
■ Longitudinal Post-Tensioning in ■ Low slip ■ Extremely small deviations possible,
Bridges ■ Inspectable Deviation half shells provide easy
■ Wind Power tendon installation, even with biaxial
■ Complete prefabrication of the
deviation
corrosion protected tendon up to a
length of 400 m possible ■ Stress measurement with
DYNA Force® possible
■ No grouting operations required on
site ■ Infinitely restressable

Main characteristics

Minimum Tendon Size 30 Wires


Maximum Tendon Size 84 Wires
Steel Grade of Wires Y1670, Y1770
Wire Diameter 7 mm
Corrosion Protection PE-Sheathing and Corrosion Protection Compound
Replacement possible Yes
Restressing possible Yes
Coupling possible Yes
Possible Tendon Course Sectional straight line with deviation, if applicable

40
External tensioning system
Anchorages
MA anchorage
■ 30-84 Wires ■ Minimum Concrete Compressive ■ ETA-07/0186
■ Longitudinal Post-Tensioning of Strength from 33 N/mm2 (Cube) at
Bridges and Wind Power Time of Stressing

Unbonded
Stressing anchor C Fixed anchor D

Wire

41
Plate anchorage
■ 30-84 Wires ■ Minimum Concrete Compressive ■ Longitudinal Post-Tensioning
■ ETA-07/0186 Strength from 33 N/mm2 (Cube) at of Bridges and Wind Power,
Time of Stressing Strengthening of Bridges for
enhanced bending loading capacity

Stressing anchor C

Fixed anchor D Fixed anchor E (one-piece)

42
Coupler
■ 30-66 Wires, up to 84 Wires on ■ Longitudinal Post-Tensioning ■ ETA-07/0186

External tensioning system


request of Bridges and Wind Power,
Strengthening of Bridges for
enhanced bending loading capacity

Fixed coupler C-K

Unbonded
Wire
Movable coupler K

43
Deviations
■ Standard deviation setting up by ■ Intended deviation angle of up to 2 x ■ Minimum deviation radii depend on
means of deviation half-shells 10° possible tendon size and steel grade, see table
■ For special applications also possible ■ Deviation half-shells provide an
as cast-in and bent ducts allowance angle of 3° each direction
■ Bi-axial deviations are easily possible for unintended deviations
by using of deviation half-shells

Tendon deviation with deviation half-sell

PE-Duct Deviation half-shell Deviation half-shell PE-Duct

Ø da

α α
∆α = 3º ∆α = 3º

R R Deviation half-shell

Tendons with duct


Tendon Type
EX-30 EX-36 EX-42 EX-48 EX-54 EX-60 EX-66 EX-72 EX-78 EX-84
SUSPA-Wire
– – mm mm mm mm mm mm mm mm mm mm
90 x 90 x
PE-duct Type 1 1)
Ø da x s 75 x 4.3 75 x 4.3 90 x 5.1 90 x 5.1 90 x 5.1 90 x 5.1 90 x 5.1 90 x 5.1
5.1 5.1

Minimum deviation
radius for wire grade R 2,700 2,700 2,700 2,700 2,700 2,900 3,200 3,500 3,800 4.,00
St 1570/1670
Minimum deviation
radius for wire grade St R 2,500 2,500 2,500 2,500 2,800 3,100 3,400 3,700 4,000 4,300
1570/1770
1)
Optimized duct diameter

44
External Unbonded Bar Tendons

External tensioning system


Applications Features
■ Strengthening of bridges to enhance ■ Low slip Anchorages ■ DYNA Force® monitoring possible
shear load capacity ■ WS Bar Tendons for short Lengths ■ ETA-05/0123, Z-13.72-50123, resp.
■ Pier cap and base anchorage < 2,5 m ■ Restressable
■ Stressing of deviators and anchor ■ WR Bar Tendons for Lengths > 2,5 m
blocks for longitudinal strengthening

Unbonded
Main characteristics

Minimum Tendon Size 18 mm

Bar
Maximum Tendon Size 47 mm
Steel Grade of Bar Y1050
Bar Types WR/WS

■ Heat Shrink Sleeve or DYNA Protect® Bar and PE-Duct


■ Grouting with corrosion protection wax acc. to EAD16, factory-
Corrosion Protection
controlled grouting with cementitious grout (DCP), grouting with
cementitious grout after stressing

Replacement possible Yes


Restressing possible Yes
Coupling possible Yes
Possible Tendon Course Mainly straight

Anchorages
System overview
WR Bar Types WS Bar Types
Anchor
Designation 18 26 32 36 40 47 57 65 75 26 32 36 40
Plate
WR WR WR WR WR WR WR WR WR WS WS WS WS
Unbonded and external
bar tendon with solid
square plate anchorage 2011 X X X X X X X X X X X X X
without additional
reinforcement
Unbonded and external
bar tendon with solid
square plate anchorage 2012 X X X X X X X X X X
with additional
reinforcement

45
Assembly and Installation
Installation
Site fabrication (for strand and bar) Placing and fixing of the ducts Coupling of metal sheet ducts
■ Ducts, strands or bars, anchorages ■ Placement of the ducts on preinstalled ■ One half of the coupler screwed onto
and couplers are delivered to site on chairs the already placed duct
schedule ■ Alignment of the ducts to correct ■ Fixing and sealing by means of
■ Tread bars (WR) are usually delivered position and height adhesive tape
to site prefabricated to project-related ■ Tying of the ducts for securing against ■ Placing next duct and screwing onto
lengths lifting and displacement the coupler
■ However, due to the continuous, robust ■ Installation of vents on high points ■ Fixing and sealing by means of
coarse thread also cutting and coupling adhesive tape
■ Installation of vent tubes on high
at any position of the tendon is possible
points and anchorages
Coupling of plastic ducts
■ Connection of the duct section by
attaching of the couplers
■ Subsequent fixing and sealing

Installation of the anchorages with corresponding additional reinforcement/helixes


■ Fabrication of the formwork with ■ With wires
block-out for strands and bars as well ■ Fitting of a retaining nut onto the
as boreholes for threaded bars for stressing anchor
installation of the anchorages ■ Scewing-in of the duct into the
■ Screwing-in of the treaded bars into retaining nut and sealing by means
the anchors, grout port to be covered of an adhesive tape
for protection against pouring grout
■ Positioning and fixing of additional
■ Anchor with threaded bars to be lead reinforcement and helix, if required
through boreholes in the formwork
■ With cast-in fixed anchors the process
■ Threaded bars to be fixed with nuts steps for fixing the formwork are
from the outside omitted. In return adequate fixing of
■ With strands the reinforcement components is to
■ Trumpet (transition tube to the duct) be provided
to be screwed onto the anchor
■ Helix and, if required, additional
reinforcement threaded onto
trumpet and anchor
■ Duct connected to the trumpet by
means of a coupler, and fixed and
sealed with tape

46
Installation of strand tendon couplers
■ For installation of the fixed couplers ■ Installation of the ducts in the second ■ Closing the coupler by pushing back
in the first construction phase, the construction phase, whereby a the coupling trumpet
instructions for installation of the coupler trumpet with sleeve tube is ■ In the second construction phase no
anchorages apply to be provided for connection to the stirrups or helical reinforcement is
■ As soon as the tendon has been coupler required in the coupler area

Assembly and Installation


stressed and grouted in the first ■ Pushing in the strands from the ■ For movable couplers, please refer to
construction phase, the tendon stressing end of the second the installation instructions available
can be connected in the second construction phase and connecting to on request
construction phase the coupler

Special features on Electrically-Isolated Tendons (EIT)


■ Installation of the ducts onto prepared ■ Particular importance is paid to the
support rebars, if required plastic half- sealing of the duct couplers and the
shells are placed underneath in deviation connections to the anchorages by
sections means of heat shrink sleeves

Pushing-in of the
Prestressing steel
■ Allow for appropriate space in the
pushing area (no formwork elements
in front of the anchorage opening,
installation area for pusher and
dispenser)
■ Hoist for lifting of new strand coils
required
■ Pushing speed up to 400 m per
minute
■ On-site fabrication of bond or fixed
anchorages
■ Only possible before concreting
■ Appropriate space to the
peripheral formwork for mounting
compression fittings
■ The top layer reinforcement may
not be placed yet in the anchorage
installation zone

47
Prefabricated tendons
■ Post-tensioning steel (strand or bar) is ■ Strand tendons are delivered to the ■ Stressing anchors are supplied
inserted into the duct in the factory to construction site on robust steel reels, separately
the highest quality standards ready for installation and just in time
■ The fixed anchors are installed ■ Uncoilers designed for the reels
■ Prefabricated tendons that are and tendon types are available in
coupled to already installed tendons accordance with the highest safety
in the structure consist exclusively of standards
strand bundles and ducts

Installation of prefabricated strand tendons with pre-assembled anchorage


■ Stirrups must be open to the top ■ Appropriate hoist for complete ■ Uncoiling the tendon from the fixed
■ Rebars chairs must be installed. If there installation length including reel weight; anchor end
are multiple layers: Place the lowest hook height min. 5 m above top layer of ■ Feeding the stressing end into
layer of support rebars - place the tendons the stressing anchors fixed to the
lowest layer of tendons - place the next ■ When using several hoists, sufficient formwork, connecting them with
layer of rebar chairs - place the next load capacity of all hoists must be trumpet by means of a sleeve duct,
layer of tendons, etc. ensured at the handling point fixing and sealing with adhesive tape

Installation of stressing anchor and coupler


■ Fixation of the stressing anchors to ■ With Strands ■ Positioning and fixing of additional
the formwork is carried out in the ■ Trumpet (transition tube to the duct) reinforcement and helix, if required
same way as with site production to be screwed onto the anchor after threading of the prefabricated
■ Helix and, if required, additional tendon
reinforcement threaded onto ■ The installation of the coupler is
trumpet and anchor carried out in the same way as with
site production

48
Procedure for continuous tendons over several construction sections
■ In some countries it is not allowed ■ Install up to the end of the ■ After the concrete pour, relocate the
to couple all tendons at construction construction section to be concreted tendon section that has not been
sections (100% coupling); this immediately, lay out the remaining concreted to the already concreted
requires that a certain amount of the tendon in the next construction construction section
required tendons runs across the section depending on the length and ■ Minimum deviation radii shall be met
construction sections conditions, or place it on a reel

Assembly and Installation

49
Fabrication of monostrand tendons – prefabrication or site production
■ For prefabricated monostrand ■ Tendons are then delivered to ■ In case of site fabricated monostrand
tendons, the individual monostrands site either on steel reels or in self- tendons, the anchorage components
are cut to length and bundled in the supporting coils or in straight line and monostrands (in coils) are
workshop according to plan, then the delivered to site and installed on site
fixed anchor is installed as a complete assembly according to
the installation manual

Installation of prefabricated monostrand tendons with pre-assembled fixed anchors


■ Pre-installation of the stressing ■ Placing the tendons on the tendon ■ Alignment of the tendons - consider
anchors – this requires adequate supports – these must be open at the warping zone and bundling
space for placement and alignment of top ■ Fixing any one meter with plastic
the strands during installation ■ Feeding the single strands into the zip ties or any other fixings is not
stressing anchor permitted

Installation of anchorages with corresponding additional reinforcement


■ Fabrication of the stressing pockets ■ Screw threaded bars into the ■ Fix the threaded bars with the nuts
by means of formwork or pocket stressing anchor, attach sealing ring from the outside
former (holes for threaded bars and ■ Feed threaded bars through the bore ■ Install additional reinforcement (only
opening for stressing head must be holes in the formwork required for closed stirrups), set in
fabricated) position and fix in place

50
Factory production for internal unbonded bar tendons
■ Unbonded bar tendons are ■ Due to the prefabrication of the ■ With an unbonded system, stressing
prefabricated in the workshop and corrosion protection under controlled force control or retensioning of the
delivered to the construction site conditions and by trained factory system is possible at any time
ready for installation personnel, the highest standards for
■ The corrosion protection consists of the durability of the system are met
a special, approved heat shrink sleeve ■ Based on the existing corrosion
or DYNA Protect® Bar and a PE-duct protection during the installation of
as mechanical protection the bars, this system is particularly
■ Alternatively: design with protective recommended for projects where
PE pipe and factory-injected already during construction stage
corrosion protection compound in the a longer exposure time in the open

Assembly and Installation


annular space formwork may be expected

Installation
■ Alignment and fixation of the ■ Temporary installation of the anchor After positioning the duct sleeve with
prefabricated bar tendon, as well as nuts, as well as installation of grout and vent ports, sealing to the
assembly of the anchor plates with the steel caps for protection until PE protective tube is carried out. The
attached tube and fastening to the tensioning is carried out annular space between the bar or
formwork ■ When using movable coupler joints, coupler and the duct sleeve is grouted
■ Sealing of the tube to the tendon by both bar ends must be screwed with cementitious grout or anti-
means of adhesive tape or heat shrink halfway into the coupler and kept corrosion compound after tensioning.
sleeve in position by means of special
■ Filling of the annular space around pressure-sensitive adhesive, a tapered
the tube with corrosion protection cut of the bars or locknuts arranged
compound on both sides.

51
External wire tendons for bridges
■ External wire tendons of type Wire-EX ■ Pulling in complete prefabricated
are supplied completely prefabricated tendons offers the shortest possible
and corrosion-protected on reels to installation times
the construction site ■ Special half shells allow a perfect
adaptation of the tendon geometry to
the actual structural conditions and
can compensate for imperfections in
the execution of the structure

Fixing of penetration tubes prior to concreting of the bulkheads and placement of the deflection half shells
■ Depending on the planned deflection ■ Penetration tubes are straight and can circumferential direction and can thus
situation (deflection angle, deflection therefore be placed accurately in the be optimally aligned with the actual
radius and bulkhead thickness), formwork; depending on the length, tendon geometry
DYWIDAG provides appropriate suitable stiffeners are available
penetration tubes for the different ■ Immediately prior to the tendon
tendon sizes installation, plastic half-shells are
inserted into the penetration tubes
from both sides of the cross girder
These half-shells can be moved in any

Pulling-in the tendons


■ The tendons are pulled in using ■ The tendons are pulled into the ■ In boxed girders, the tendon is
winches. The winch rope is passed superstructure through recesses in passed over pulleys located on the
through all deflection points and the abutment cross girder, or in the floor slab to prevent damage to
connected to the end of the reeled deck or floor slab, where the edges the prefabricated tendons during
tendon have to be lined adequately installation

52
External wire tendons for application in wind towers
■ External post-tensioning system Wire- ■ Installation of tendons from tower ■ The Wire-Ex post-tensioning method
Ex with 30 to 84 wires, PE duct and crown or tower shaft possible has been successfully employed in
pre-assembled stressing and fixed ■ Completely factory prefabricated over 1,500 concrete and hybrid towers
anchors tendons allow timesaving installation worldwide
■ Completely factory-prefabricated and and stressing at the construction site ■ Retensioning, replacement and force
corrosion-protected tendons monitoring of the tendons possible at
■ Delivery of the tendons either on steel any time
reels or coiled without reels

Assembly and Installation


Deviations
■ Typical concrete towers have variable ■ The robust sheathing allows various ■ Larger deviations (greater than 1°,
diameters, resulting in changes in deviation situations where corrosion cf. type 2 or type 3) are achieved by
inclination of the tower wall protection durability has been proven arranging deviation half-shells
■ See Type 1-4 by extensive testing ■ The deviations of tower types 2-4 may
■ External tendons located close to the ■ Small deviations (type 4) are obtained also be combined
tower wall usually need therefore to by direct contact of the tendons with
be deviated the tower wall

53
Installation from the tower crown
■ Insert tendons supplied on reels into ■ The uncoiler is lifted by crane approx. ■ Prior to completion of the insertion
the uncoiler. Self-supported tendon 5 m above the tower crown. From work, the tensioning sleeve is turned
coils are placed in a hinged reel there, the tendon is uncoiled. In onto the basic body and the tensioning
beforehand this process, the basic body of the spindle is screwed into the internal
stressing anchor is first threaded thread of the tensioning sleeve
through the recess in the upper
anchor plate and lowered to the base
slab or steel structure

Installation from the tower shaft


■ Installation of the tendons requires ■ The fixed anchor is fixed to the top ring ■ The insertion process is completed
no crane and is therefore possible by screwing the bearing nut onto the by turning the tensioning sleeve onto
independent of the wind speed basic body the basic body and screwing the
■ The tendon is pulled upwards by ■ Installation can even be executed tensioning spindle into the internal
means of an electric hoist after the electrical equipment has thread of the tensioning sleeve
been installed in the tower, so offering
maximum flexibility

54
Factory production for external bar tendons
■ External bar tendons are prefabricated ■ External bar tendons can either be ■ Additional grouting of the tendon
in the factory and delivered to the freely installed in a recess or drill (e.g. wax grouting) on site can be
construction site ready for installation channel or arranged in or along the avoided. This significantly increases
■ Corrosion protection consists of a structure the installation speed for time-sensitive
special, tested heat shrink sleeve or ■ Prefabrication of the corrosion projects (e.g. precast structures)
DYNA Protect® Bar and a PE duct as protection under controlled conditions ■ With an external placement of the
mechanical protection and by trained staff in the factory prefabricated tendon, prestressing
■ Alternatively: version with PE duct means that the highest standards of force monitoring, restressing and,
protective and annular space injected system durability are met under certain conditions, removal of the
in the factory with corrosion protection system is possible at any time
compound

Assembly and Installation


Installation
■ Insertion of the external bar tendon ■ Temporary installation of the grout and vent ports, sealing to the
into the recess channel anchoring nuts, as well as installation PE protective duct is conducted. The
■ Threading and alignment of the of the steel protective caps for annular space between the bar or
anchor plate with tube. Sealing protection until stressing coupler sleeve and the sleeve duct is
between the tube and PE protective ■ When using movable couplers, both filled with cementitious grout or anti-
duct is provided by means of a bar ends must be screwed halfway corrosion compound after stressing.
gasket insertion in the tube. It is into the coupler sleeve and locked
recommended to apply a high in position by means of special
strength leveling layer for a solid load adhesive, a bevel cut of the bars or
transfer in case of an uneven bearing locknuts arranged on both sides.
surface. After positioning the sleeve duct with

55
Stressing
Post-tensioning of strand tendons (bonded or unbonded)
Threading of the jack
To install the press, thread two mutually ■ Place jack onto the strand ■ The stressing niche must be
twisted combs in the wedge plate area ■ Connect hydraulic hoses between fabricated in accordance with the
and pull them back to the strand end pump and jack specifications – any interfering rebar
or concrete parts shall be avoided
■ Sufficient space required on the
■ Slide the bullets onto the strand ends
scaffold
■ Slide on compression plate ■ Sufficiently dimensioned hoist
required

Stressing according to stressing instruction and anchoring


■ Applied by hydraulic system and, ■ The area behind the jack shall strictly ■ Wedges are retracted to the jack plate
depending on the elongation, in not be accessed during the stressing during stressing; when released, they
several steps operation for safety reasons slide into the wedge seat and thus
anchor the strands in the wedge plate

Record of stressing forces


The stressing force is measured by means of a manometer and manual reading of the elongation - this is recorded in the
stressing record

56
57
Assembly and Installation
Stressing of wire tendons for external application
■ The stressing force is applied by ■ The stressing jack is sitting on the ■ At the end of the stressing operation,
means of hydraulic jacks, depending anchor plate by means of a support the tendon is seated with the bearing
on the elongation optionally in several frame fitted with openings nut at the stressing force specified in
steps, and in accordance with the ■ For tensioning, the stressing jack the stressing record
stressing record engages with the tensioning spindle ■ For safety reasons the area behind
■ Prestressing can be carried out even ■ During the stressing operation, the the jack shall be kept clear, not be
under difficult boundary conditions by stressing accessories are turned accessed, respectively
using lightweight and compact hollow through the openings of the support
piston jacks and corresponding frame
stressing equipment
■ The force applied during stressing
■ For stressing, the tensioning spindle is continuously measured by means
is screwed into the tensioning sleeve of a manometer and documented in
of the stressing anchor. Then bearing the stressing record together with the
nut and the buttress nuts for the measured elongation
stressing operation are mounted over
the spindle

58
Stressing of bar tendons
Mounting of the jack
■ After temporary extension of the bars ■ After application of the specified ■ In case of prestressing work in
by means of a tensioning spindle, the hydraulic pressure, the anchor nut is confined spaces, special compact or
tensioning jacks specially developed set onto the anchor plate by means of project-specific prestressing jacks can
for the bar tensioning process are the ratchet which is an integrated part be provided after consultation with
placed on the bar to be tensioned with of the stressing jack, thus anchoring DYWIDAG
a built-in ratchet. After screwing on the prestressing force
the high-strength stressing nut behind ■ After releasing the hydraulic pressure,
the jack and connecting the hydraulic the stressing jack can be removed
pump, the stressing operation can again together with the stressing
start spindle and stressing nut. Thereafter,

Assembly and Installation


■ Stressing is executed on the basis the bar projection behind the nut
of a checked stressing instruction can be compared with the projection
specifying the prestressing force, before stressing. The determined
the applied hydraulic pressure, the elongation path is then recorded in
expected elongation of the tendon the stressing record
and the stressing sequence

Stressing according to stressing


instruction
The stressing jack is sitting on the anchor
plate by means of a support frame fitted
with openings

Record of stressing forces


The stressing force is measured by
means of a manometer and manual
reading of the elongation – this is
recorded in the stressing record

59
Corrosion protection
Grouting of post-tensionned strand and bar tendons with cementitious grout
■ Corrosion protection of tendons, ■ The mixture of the grout, the mixing ■ The grouting process is solely carried
anchorages and couplers is provided process and the grouting process out and documented by trained and
by cementitious grout in accordance are subject to the highest structural certified DYWIDAG personnel
with EN 447 engineering standards

Installation of the grout caps/


accessories
■ Screw the grout caps thoroughly onto
the wedge plates
■ Screw vent tubes into the grout ports
of the stressing anchors and open the
valves

60
Grouting preparation
■ Patency test: testing the patency of ■ In case a tendon is not continuous, ■ Testing of external temperature
the section to be grouted by means of the duct must be drilled to and temperature of the structure:
compressed air accommodate a new vent port Measured temperatures may not
exceed minimum and maximum
values

Suitability test of the grout

Assembly and Installation


■ Immersion tests according to EN 445 ■ Tests are carried out with grout ■ Cans are sealed and stored
(1996): immediately after mixing from the protected from vibration and thermal
■ The cylinder is filled with about 1.9 hopper and after 30min radiation
liters of grout to about 26 cm below ■ Volume change: ■ After 24 hours, a control
the rim, so that the plunger is just ■ In order to carry out a sedimentation measurement is taken between
fully immersed when inserted, when test to determine the volume change, the solid grout surface and the can
its stop on the guiding rod rests on samples must be filled into sealable rim. The difference of the mean
the spacer placed on top of the tube 1 kg cans of approximately 120 mm values between zero and control
■ The spacer is removed, the height and of approximately 99 mm measurement in mm corresponds at
immersion body sinks to the stop on internal diameter 100 mm filling height to the change
the tube in volume in vol.%
■ After filling the grout into the cans, the
■ The immersion time is measured distance of the grout surface from the ■ The change in volume of the cans
can rim is measured by means of a may not exceed 2%; the objective is
■ Funnel test according to EN 445
depth gauge and a stop plate to obtain an expansion
(2005):
■ 5 l of the grout shall be slowly
poured into the funnel through the
sieve to avoid the formation of air
bubbles in the grout
■ The lower funnel outlet is now
opened and the stopwatch is started
at the same time

Grouting operation
■ Set the water quantity on the grout
mixer and fill it into the mixing drum
■ When using grouting agents, these
are added together with the cement
according to the specified recipe
■ When using grout cements with
integrated additives, these are added
in accordance with the application
notes
■ Mixing time is typically 120 s
■ Ready-mixed grout is pumped into
the hopper of the mixer
■ Mixer hose is plugged to the tendon
to be grouted
■ Dead end vents as well as any
intermediate vents must be open
■ Grout is pumped in until the grout
pours out at the outlet free of air ■ Once the discharged grout meets the DOCUMENTATION
bubbles and in due consistence specification, the tendon is closed at ■ Results of the suitability test are
the outlet, then increased pressure is recorded in test records
built up by the mixer and the tendon is
closed at the grout port
■ Documentation of the grouting
sequence with details of the grouting
operations

61
Corrosion protection in the anchorage zones of unbonded tendons / monostrand anchorages
■ Cutting off the strand protrusions with an angle grinder or ■ Placing the sealing gasket and keeper plate, then screwing
cutting device them onto the cast anchor
■ Attaching PE caps filled with corrosion protection ■ Filling the anchorage pocket with concrete
compound to the strand ends

62
Corrosion protection in the anchorage zones of external wire tendons
■ After installation or after stressing, the ■ Special greases or grease-soaked ■ Finally, the entire anchorage zone is
fully prefabricated fixed anchor and fabrics are wrapped around the covered by a PE cap
the on-site installed stressing anchor external thread of the bearing nut and
shall be protected against corrosion tensioning sleeve

Wrapping the visible anchor parts with corrosion protection tape

Assembly and Installation


■ Unscrew the protective transport caps ■ Coating the end face of the tensioning ■ Cleaning the entire anchor body
from the basic body sleeve on the tendon side and the of any debris and fully wrapping
■ Screwing the tensioning sleeve onto upper half of the thread with Vaseline (covering) the entire anchor with
the thread of the basic body that has ■ Coating the end face of the anchor anti-corrosion tape
already been coated during factory plate side of the bearing nut with
production Vaseline

Installation of the anchor caps


■ Inserting/attaching the PE ■ Wrapping Denso sealing tape around ■ Covering the screws with the PE-cap
supporting/protection pot provided the external thread of the tensioning ■ Fitting the anchor cap onto the anchor
with anti-corrosion compound into/ sleeve and the bearing nut body and fixing by means of threaded
onto the tensioning sleeve ■ Fitting the anchor cap onto the anchor bars and nuts
plate and fixing it by means of screws
backed with DUBO locking

63
Wax injection of external strand tendons
■ Wax injection of external strand ■ Injection from an anchor or, in the ■ Sealing at anchors, caps, grout ports
tendons is performed on site due to case of very long tendons, from a low and vents
design requirements point along the free length ■ Perform pressure test on duct to
■ Corrosion protection waxes for ■ Positioning of vents in sufficient verify tightness prior to injection
tendons are heated to 100-110 °C for number and preparation of an
application injection manual for intended
sequence

■ All injection ports and vents on ■ During injection, the pressure, ■ After complete filling of the tendon
tendons shall be attended by temperature and injected quantity are and closing of all vents, the injection
personnel. All personnel shall be monitored at all times. In addition, pressure is maintained for a short
briefed prior to injection and shall be the progressive filling in the tendon time. After completion of injection,
in steady contact via radios can be controlled by using a thermal the vents and caps are permanently
■ Preheat and maintain adequate imaging camera sealed
quantity of wax for injection. Tank ■ When the injected wax reaches the
(car) and pump are usually located vents, they are closed after overflow
on the bridge so that the hot wax is of 3-5 l of wax
led from above via hoses into the
superstructure and to the tendons.

64
Equipment
Installation devices
Strand cage
Strand cages are used for uncoiling the strand cages can be perfectly adapted the perfect optimization of the strand
strand, which can be universally used to a wide range of coil sizes. The robust cages for construction site application.
for both left and right wound strand. design as well as integrated transport
Strand coils of up to 4 tons can be aids (forklift receptacle and transport
used. Due to various setting options, the lugs) are just a few features reflecting

Pusher
By means of the pusher, the strand The pushers are hydraulically driven.
can be pushed into the duct at up to The feeding speed is continuously
12.2 m/s. The highest priority is also adjustable. The maximum pushing
given to a robust design suitable for force is 3.9 kN.
construction sites for these devices.

Equipment
Uncoiler/ reels
Reels are the easiest way to install nor hydraulic drives are required. and elaborately designed. Unlike the
prefabricated tendons. Due to their The braking effect is generated reels, an electric drive makes it possible
rather small dimensions and simple mechanically via air pressure using to wind up tendons as well. Both speed
design, the devices have a very compressed air cylinders. Uncoilers, on and direction can be controlled by
low dead weight. Neither electric the other hand, are much more complex remote control.

65
Stressing jacks
Due to their robust design, DYWIDAG In our in-house workshop, the devices
stressing jacks have proven their are assembled, regularly serviced,
reliability in rough construction site repaired as required and calibrated.
conditions for decades.

Strand tendons
DYWIDAG stressing jacks are Due to rapidly exchangeable adaptions Likewise, it is optionally possible to
outstanding for their robust design the stressing jacks can be applied to a attach a power seating device for
made of hard-chromium plated alloy wide range of tendon types. A standard minimizing wedge slip. With special
steel and/or aluminum alloys and cover automatic gripping device allows easy adaptations, the stressing jacks can
a wide range of applications. handling on the construction site. also be used for destressing tendons.

Bar tendons
DYWIDAG bar tensioning jacks tendons behind the nut and are fixed application or in particularly confined
are designed for easy handling to by a tensioning nut. By means of an spaces, tensioning jacks with worm-
facilitate and subsequently speed up integrated wrench sleeve with hand gear cylinders are available achieving a
the tensioning operation. The jacks ratchet, the nut is force-tightened after high tensioning force despite very low
are coupled via tensioning spindles the tensioning operation. Thus, slippage weight.
to the projecting end of the bar is reduced to a minimum. For overhead

Wire tendons
Carbon fiber reinforced hollow Direct comparison reveals a weight Despite the lightweight design, CFRP
rams provide a good alternative saving of at least 60%, allowing easier hollow rams are still robust and durable.
to conventional steel or aluminum handling during tensioning operations.
tensioning jacks. The lightweight and slim design allows
work to be carried out in confined
spaces.

Hydraulic pumps
Suitably optimized hydraulic pumps Oil flow rates of up to 22 l/min can be Optionally, cooling units for the oil can
are available for the tensioning jacks. achieved. If required, hydraulic pumps be set in-between to ensure the perfect
This allows fast and safe operation. are available with cable remote control, operation temperature of the oil even
The hydraulic pumps have up to three which makes it easy to choose a safe in case of permanent use or very high
fittings, depending on the type of jack and optimal location for the pump, even outside temperatures.
used, for gripping, power seating and at some distance from the stressing
runback. position.

66
Grout mixer with pump
The grouting operation is based on a Swibo MP-Series
highly plasticized and thixotropic grout. The SWIBO grouting and mixing unit The MP series is designed to be
For this purpose, durable grouting has been approved by the German compact while maintaining high
equipment has been developed. approval body. Besides the good mixing performance. The maximum pumping
Advanced methods such as pressure and grouting properties, the focus capacity is 4,000 l/h (MP 4000-2) with a
grouting, post-grouting and vacuum during the development was also on mixing drum capacity of 100 l.
grouting are the result of many years of the transport properties. Hence, every
continuous development. mixing and grouting unit of this type is
fitted on a trailer chassis and is licensed
according to the road traffic regulations.

Equipment
Vacuum grouting devices
Vacuum grouting devices are used
for the repair of tendons. By using
the corresponding volume measuring
system, the first step is to determine
the volume of the defective sections.
Subsequently, grouting is carried out.
Grout is injected into the void and the
amount of injected grout is measured.
Finally, the grout volume is compared
with the previously measured void
volume to check whether the voids have
been completely filled.

67
Services
Engineering service (consulting, detailing and design)
In all design stages of a concrete ■ Preparation of assembly drawings ■ Design of flat slabs in accordance
structure, DYWIDAG offers a ■ Preparation of stressing records with EN 1992-1-1 and the applicable
comprehensive range of engineering national annexes
services: In addition, we offer further planning ■ Preparation of the associated
services, particularly for building formwork and reinforcement
■ Identification of suitable stressing construction: drawings (incl. reinforcement data)
systems for preliminary and ■ Redesign of flat slabs originally ■ Preparation of stressing records
construction design designed as reinforced concrete
■ Optimization of anchorage zones for slabs, to prestressed concrete
preliminary and construction design slab systems with optimized slab
■ Supply of CAD drawing blocks for thicknesses or larger spans between
anchorage areas columns.
■ Supply of CAD drawing blocks for
deviation zones of external tendons

Production and supply of tendons


■ Manufacture of project-specific ■ Delivery to the construction site on ■ Manufacture of project-specific
tendons (bonded strand tendons schedule external tendons (type Wire-EX) with
up to 150 m in length, bar tendons ■ On reels for direct use in uncoilers factory-finished corrosion protection
and monostrand tendons) with provided by DYWIDAG and anchorages on both ends
preassembled fixed anchor (as an ■ Self-supporting with the option of
alternative to the fixed anchor, a
inserting them into temporary reels
coupler can also be preassembled
at the construction site and then
in order to extend tendons of the
hooking them into uncoilers
subsequent construction section).

Complete installation
Bonded tendons Internal unbonded tendons External tendons
■ Placement of ducts with professional ■ Installation of prefabricated ■ Execution of surveying and core
fixing, installation of the anchorages tendons with professional fixing, drilling operations on the existing
and connection of the anchorages to installation of the anchorages and structure
the ducts corrosion-resistant connection of the ■ Pulling-in or feeding-in the tendons
■ Installation of prefabricated tendons anchorages on the stressing end
■ Professional installation of deflection
with professional fixation, installation ■ Stressing operation in accordance half shells in deviation areas
of the anchorages and connection of with stressing records in as many
■ Stressing operation in accordance
the anchorages on the stressing end stages as required, with professional
with stressing records in as many
to the ducts documentation
stages as required, with professional
■ In the case of field fabricated tendons, ■ Corrosion protection of the documentation
pushing prestressing steel strands anchorages with professional
■ Corrosion protection of the
into the ducts documentation
anchorages with professional
■ Stressing operation in accordance documentation
with stressing records in as many
stages as required, with professional
documentation
■ Grouting of the tendons with
cementitious grout with professional
documentation

68
Supervision of stressing operations
Some work may also be carried out by ■ Placement of ducts and installation of ■ All stressing operations and corrosion
the contractor after instruction by and anchorages protection work (incl. grouting
under supervision of DYWIDAG: ■ Placement of monostrand tendons with cement grout) are carried out
and installation of anchorages exclusively by specialist personnel
from DYWIDAG or specialist
companies qualified by DYWIDAG

Monitoring
■ Preparation of monitoring solutions ■ Supply and installation of standard ■ Integration of all sensors into a global

Services
in cooperation with the structural sensors (e.g. for temperature, strain, monitoring system
engineer acceleration, inclination, etc.) ■ Data logging and data analysis
■ Supply and installation of load cells ■ Electrical connection of all sensors by ■ Maintenance and servicing of
or elastomagnetic sensors for force local certified partners monitoring systems during the
measurement (DYNA Force®) operation period

Survey of tendons in existing structures


Bonded tendons Internal unbonded tendons External tendons
■ Evaluation of the grouting condition ■ Determination of the stressing forces ■ Visual inspection
■ Endoscopy of tendons by means of lift-off tests ■ Condition inspection by robot-
■ Vacuum grouting of insufficiently ■ Restressing assisted non-destructive MI test
grouted tendons ■ Determination of the stressing forces
by means of lift-off tests
■ Determination of the stressing forces
by means of vibration measurement
■ Restressing of tendons
■ Replacement of tendons
■ Retrofitting of elastomagnetic sensors

69
Tendon replacement / strengthening of prestressed concrete structures
Bonded tendons Internal unbonded tendons External tendons
■ Supply, installation and stressing of ■ Placement of additional unbonded ■ Strengthening of bridge structures
DYWIDAG bar tendons, e.g. for anchor DYWIDAG bar tendons (tendons with against shear stress using external
and deviator blocks for retrofitted bond anchor) bar tendons from DYWIDAG
external post-tensioning ■ Supply, installation and stressing of
external wire and strand tendons for
bridge strengthening
■ Installation of external monostrand
tendons for retrofitting of tank
structures

Tendons for temporary applications


External tendons
■ DYWIDAG bar tendons for pier ■ Tendons for temporary support of
head strengthening and bearing high loads
replacement

Training and certification of stressing personnel


Professional installation of the tendons Both DYWIDAG's specialist personnel The training program consists of
and qualified execution of the post- and those of the specialist companies theoretical and practical parts. The
tensioning and corrosion protection must receive initial training or have achieved qualifications and skills have
work are essential requirements for sufficient experience for each stressing to be proven. The qualification of each
the high technical quality, reliability method (bar, wire, strand) separately, individual specialist is certified after
and durability of DYWIDAG and SUSPA depending on the application. passing the examination.
Post-Tensioning Systems. Therefore, Furthermore, regular training courses
all such work may only be carried out are held. Special attention is paid to
by DYWIDAG specialist personnel or health and safety at work and the use of
by specialist companies qualified by hydraulic equipment.
DYWIDAG.

70
Installation of external tendons of
arbitrary length e.g. tendons of 300
m length of type SUSPA-Wire EX, A4
motorway interchange Köln-Ost

Services

71
Get in touch

Europe and RoW


DYWIDAG-Systems International
GmbH
Neuhofweg 5
85716 Unterschleissheim
Germany
+49 89 30 90 50 100 Please Note:
dywidag.com
This brochure serves basic information purposes only.
North America Technical data and information provided herein shall be
considered non-binding and may be subject to change
04477-1/03.20-20 jb

DYWIDAG-Systems International without notice.


USA Inc.
320 Marmon Drive We do not assume any liability for losses or damages
Bolingbrook, IL, 60440 attributed to the use of this technical data and any improper
Phone 630/739-1100 use of our products. Should you require further information
dywidag.com on particular products, please do not hesitate to contact us.

dywidag.com Follow us dywidag-systems-international

You might also like