Bearing-Sht 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PROJECT: MAJOR UP-GRADATION OF

MUZAFFARPUR JN. RAILWAY STATION IN


SONPUR DIVISION OF EAST CENTRAL RAILWAY
E.P.C CONTRACT NO :
N
RAIL LAND
DEVELOPMENT
AUTHORITY
E.P.C CONTRACTOR

P15 P16 P17

0+430
A2

0+350
P14

B4

B2

B4

B2

B4

B2

B4
B2

B1
B3

B3

B1

B3
B4

B1

B3
B1

B2
B4
B3

B4

B2

B4

B2

B4
B2

KEY PLAN SHOWING ARRANGEMENT OF


B4

BEARING LOCATIONS FOR POT cum PTFE BEARINGS


PLAN AT PEDESTAL LEVEL
(SCALE 1:300)

P14

P7 P8 P9 P10 P11 P12 P13

B2
B4

B1
B3

B2
B2

B4
B4
B2
B4

B4

B2

B4
B2

B4

B2
B4

B2

B4
B2

B1
B3
B3

B3

B1

B2
B3

B1

B3
B3

B1

B3
B1
B1

B1

B4
B2
B4
B4

B2

B2
B4

B4
B4

B4
B2

B2

B2

PLAN AT PEDESTAL LEVEL


(SCALE 1:300)

B4 B3 B4 B2
0+050

A1
0+000

B1

B2
P7

B4

B2
B2
B4
B2

B2
B4
B2
B4

B1
B3
B3

B1
B1

B1
B1

B3
B3

B4

B2
B2
B4
B2
B2

B4
B2

B2

B4

B3
B4

B1

B4

B2

B4

B2
B4

B2

B3

B1

B3

B1
PLAN AT PEDESTAL LEVEL

B4
(SCALE 1:300)

B2

B4

B2
STRUCTURAL DESIGN QUALITY ASSURANCE This drawing including its design and detailing has been checked in “Notice of No Objection” from RLDA is being accorded for design principles based BUILDING NAME:
This drawing including its design and
accordance with the requirements of EPC Agreement and found on the recommendations of the Design Consultants (DDF Consultants & TPCL) and
The responsibility of control, check and verification of accuracy, correctness, completeness, integration detailing has been checked. The same is NOTES:-
and full compliance of EPC Agreement provisions in respect of design analysis and drawings rests with vetted independently and found suitable suitable for the execution purpose. The overall responsibility of Authority Engineer(Voyants Solutions Pvt. Ltd.). However, the overall responsibility ELEVATED ROAD
for the execution purpose. correctness of design, detailing and compliance with EPC agreement for the detailing and design accuracy lies with the Contractor (Ram Kripal Singh
the Design Consultants and the Contractor
rests with the Structural Design Consultant and Contractor. Construction Pvt. Ltd.). DRAWING TITLE:
PROOF - CHECKING AUTHORITY ENGINEER AUTHORITY
BY ARCHITECTURAL DESIGN CONSULTANT BY STRUCTURAL DESIGNER BY CONTRACTOR
CONSULTANT VOYANTS SOLUTIONS PVT. LTD. RAIL LAND DEVELOPMENT AUTHORITY
Sig.: Sig.: Sig.: Sig.: Sig.: CHECKED BY APPROVED BY COUNTERSIGNED

DRAWING
NUMBER: RLDA/MFP/STR/ELE.RD/SUP-047
Date: Date: Date:
Accepted By: Prof. Nirjhar Dhang, DRAWING REVISION SCALE: SHEET SIZE:
Name: Ar. Sahil Katyal Name:Ar. Milind Surve Name: MRINAL 31.03.2024
Braj Kishore, Professor, Structural Engineering DATE: NUMBER
DESIGN CO-ORDINATOR DESIGN DIRECTOR LEAD STRUCTURAL DESIGNER PROJECT MANAGER Civil Engineering Department

DDF CONSULTANTS PVT. LTD.


RAM KRIPAL SINGH INDIAN INSTITUTE OF TECHNOLOGY,
(Santosh Kumar Singh)
LEAD DESIGNER/
(Raj Bhushan)
TEAM LEADER/ (Piyush Kumar Singh) (Pranay Kumar Singh) (Prabhat Ranjan Singh) CPM/RLDA, ~~
~~~~NDLS-2
R0 A1
CONSTRUCTION PVT. LTD. KHARAGPUR, WEST BENGAL Authority Engineer Authority Engineer APE/RLDA/MFP AM/Projects/RLDA,MFP JGM/Projects/RLDA,MFP
PROJECT: MAJOR UP-GRADATION OF
MUZAFFARPUR JN. RAILWAY STATION IN
SONPUR DIVISION OF EAST CENTRAL RAILWAY
E.P.C CONTRACT NO :
N
RAIL LAND
DEVELOPMENT
AUTHORITY
E.P.C CONTRACTOR

STRUCTURAL DESIGN QUALITY ASSURANCE This drawing including its design and detailing has been checked in “Notice of No Objection” from RLDA is being accorded for design principles based BUILDING NAME:
This drawing including its design and
accordance with the requirements of EPC Agreement and found on the recommendations of the Design Consultants (DDF Consultants & TPCL) and
The responsibility of control, check and verification of accuracy, correctness, completeness, integration detailing has been checked. The same is NOTES:-
and full compliance of EPC Agreement provisions in respect of design analysis and drawings rests with vetted independently and found suitable suitable for the execution purpose. The overall responsibility of Authority Engineer(Voyants Solutions Pvt. Ltd.). However, the overall responsibility ELEVATED ROAD
for the execution purpose. correctness of design, detailing and compliance with EPC agreement for the detailing and design accuracy lies with the Contractor (Ram Kripal Singh
the Design Consultants and the Contractor
rests with the Structural Design Consultant and Contractor. Construction Pvt. Ltd.). DRAWING TITLE:
PROOF - CHECKING AUTHORITY ENGINEER AUTHORITY
BY ARCHITECTURAL DESIGN CONSULTANT BY STRUCTURAL DESIGNER BY CONTRACTOR
CONSULTANT VOYANTS SOLUTIONS PVT. LTD. RAIL LAND DEVELOPMENT AUTHORITY
Sig.: Sig.: Sig.: Sig.: Sig.: CHECKED BY APPROVED BY COUNTERSIGNED

DRAWING
NUMBER: RLDA/MFP/STR/ELE.RD/SUP-048
Date: Date: Date:
Accepted By: Prof. Nirjhar Dhang, DRAWING REVISION SCALE: SHEET SIZE:
Name: Ar. Sahil Katyal Name:Ar. Milind Surve Name: MRINAL 31.03.2024
Braj Kishore, Professor, Structural Engineering DATE: NUMBER
DESIGN CO-ORDINATOR DESIGN DIRECTOR LEAD STRUCTURAL DESIGNER PROJECT MANAGER Civil Engineering Department

DDF CONSULTANTS PVT. LTD.


RAM KRIPAL SINGH INDIAN INSTITUTE OF TECHNOLOGY,
(Santosh Kumar Singh)
LEAD DESIGNER/
(Raj Bhushan)
TEAM LEADER/ (Piyush Kumar Singh) (Pranay Kumar Singh) (Prabhat Ranjan Singh) CPM/RLDA, ~~
~~~~NDLS-2
R0 A1
CONSTRUCTION PVT. LTD. KHARAGPUR, WEST BENGAL Authority Engineer Authority Engineer APE/RLDA/MFP AM/Projects/RLDA,MFP JGM/Projects/RLDA,MFP

You might also like