Powador

XP500/550-OD-TL

Operating Instructions
 English Version

GM06201i
Operating Instructions
- English Version -

Powador XP500/550-OD-TL
General Instructions for Installers and Operators

1 General Notes ........................................4 6 Faults and Warnings ...........................43


1.1 About this documentation ....................... 4 6.1 Warning ................................................. 43
1.2 Name plate .............................................. 6 6.2 Fault.......................................................44
1.3 Intended use ............................................ 7 6.3 Solution for Error code ........................... 46
1.4 Safety instructions .................................... 7 7 Maintenance/Cleaning........................54
2 Service....................................................8 7.1 Maintenance intervals ............................ 55
3 Unit Description ....................................9 7.2 Cleaning and replacing the filters ........... 56
3.1 Technical Data .......................................... 9 7.3 Cleaning and Replacing the fans ............. 58
3.2 Dimensions ............................................ 11 8 Parameters ...........................................60
3.3 Components inside the inverter .............. 13 8.1 PV Array parameters .............................. 60
4 Transportation and Delivery .............. 15 8.2 Inverter parameters ................................ 62
4.1 Delivery .................................................. 15 8.3 Grid parameters ..................................... 62
4.2 Transportation........................................ 15 8.4 Time Parameters..................................... 71
4.3 Centre of Gravity of the Inverter ............. 16 8.5 Digital Parameters ................................. 71
5 Storage/Installation/Start-up .............18 8.6 Analog Parameters ................................ 72
5.1 Storage ................................................. 18 8.7 Controller Parameters ............................ 73
5.2 Transporting the unit to the installation 9 User interface ......................................90
location ................................................. 18
9.1 Digital input/output................................ 91
5.3 Selecting the installation location ........... 20
9.2 RS485 interface...................................... 94
5.4 Electrical connection .............................. 21
9.3 Analog input .......................................... 96
5.5 Start-up ................................................. 27
10 Overview circuit Diagram...................99
5.6 Operation .............................................. 30
11 Decommissioning/Dismantling ........100
5.7 User interface ......................................... 34
12 Disposal .............................................101
5.8 Software upgrade .................................. 35
5.9 Connecting to inverter via Wi-Fi in local . 38

Operating Instructions Powador XP500/550-OD-TL Page 3


General No tes

1 General Notes
1.1 About this documentation
WARNING
Improper handling of the inverter can be dangerous
› You must read and understand the operating instructions before you can install and
use the inverter safely.

1.1.1 Other applicable documents


During installation, observe all assembly and installation instructions for components and other parts of the
system. These instructions are delivered together with the respective components and other parts of the system.
Some of the documents which are required to register your photovoltaic system and have it approved are
included with the operating instructions.

1.1.2 Retention of documents


These instructions and other documents must be stored near the system and be available whenever they are
needed.

Page 4 Operating Instructions Powador XP500/550-OD-TL


General Not es

1.1.3 Description of safety instructions

DANGER
Imminent danger
Failure to observe this warning will lead directly to serious bodily injury or death.

WARNING
Potential danger
Failure to observe this warning may lead to serious bodily injury or death.

CAUTION
Low-risk hazard
Failure to observe this warning will lead to minor or moderate bodily injury.

ATTENTION
Hazard with risk of property damage
Failure to observe this warning will lead to property damage.

NOTE
Useful information and notes.

Operating Instructions Powador XP500/550-OD-TL Page 5


General No tes

1.1.4 Symbols used in this document

General danger symbol Information

High voltage Risk of burns

1.1.5 Description of actions


Action

 Perform this action


 (Possibly additional actions)
The result of your action(s)

1.1.6 Abbreviations
MMI Man Machine Interface RPC Remote Power Control
PEBB Power Electronics Building Block APS Anti-islanding method
PSI PEBB Signal Interface board ACI Advanced Communication Interface
protocol (KACO Communication protocol)
ASI Analog Signal Interface board PLL Phase Locked Loop
GUI Graphic User Interface XCU XP Control Unit (Inverter control system)
MPPT Maximum Power Point Tracking CAN Controller Area Network
MPP Maximum Power Point FPGA Field-Programmable Gate Array
Vdc PV Voltage DSP Digital Signal Processor
FRT Fault Ride Through ADC Analog to Digital Converter
CEI 0-21 Italia grid code NVSRAM Non-volatile Static RAM

1.2 Name plate


The name plate is located on the inside of the left door of the two housing components.

Page 6 Operating Instructions Powador XP500/550-OD-TL


General Not es

1.3 Intended use


The inverter converts the DC voltage generated by the photovoltaic (PV) modules into AC voltage and feeds this
into the power grid. The inverter is built according to the state of the art and recognized safety rules. Neverthe-
less, improper use may cause lethal hazards for the operator or third parties, or may result in damage to the
unit and other property. The inverter may be operated only with a permanent connection to the public power
grid.

1.4 Safety instructions

DANGER
Lethal voltages are still present in the terminals and lines of the inverter even after
the inverter has been switched off and disconnected!
Coming into contact with the lines and terminals in the inverter will cause serious
injury or death.
Only authorised electricians who are approved by the supply grid operator are allowed
to open, install and maintain the inverter.
› Keep all doors and covers closed when the unit is in operation.
› Do not touch the lines and terminals when switching the unit on and off!

The electrician is responsible for observing all existing standards and regulations.

• Above all, be sure to observe standard IEC 60364-7-712:2002, “Requirements for Special Installations or
Locations – Solar Photovoltaic (PV) Power Supply Systems”.
• Ensure operational safety by providing for proper earthing, conductor dimensioning and appropriate
protection against short circuiting.
• Observe the safety instructions located on the inner sides of the doors.
• Switch off all voltage sources and secure them against being inadvertently switched back on before per-
forming visual inspections and maintenance.
• When taking measurements while the inverter is live:
– Do not touch the electrical connections.
– Remove jewelry from your wrists and fingers.
– Make sure that the testing equipment is in good and safe operating condition.
• Stand on an insulated surface when working on the inverter.
• Generally, the inverter may not be modified.
• Modifications to the surroundings of the inverter must comply with national and local standards.

Operating Instructions Powador XP500/550-OD-TL Page 7


S e rv ice

2 Service
If you need help solving a technical problem with one of our KACO products, please contact our service
hotline. Please have the following information ready so that we can help you quickly and efficiently:
• Inverter type / serial number
• Fault message shown on the display / Description of the fault / Did you notice anything unusual? / What has
already been done to analyse the fault?
• Module type and string circuit
• Date of installation / Start-up report
• Consignment identification / Delivery address / Contact person (with telephone number)

You can find our warranty conditions on our website:


http://kaco-newenergy.de/de/site/service/garantie
From there, you can easily navigate to our international websites by clicking on the appropriate flag. Please
use our website to register your unit within 24 months:
http://kaco-newenergy.de/en/site/service/registrieren
You can also select the appropriate flag on this page to access the website for your own country.
In this manner, you can assist us in providing you with the quickest service possible. In return, you receive two
additional years of warranty coverage for your unit.
Note: The maximum length of the warranty is based on the currently applicable national warranty conditions.

We have prepared a template for complaints. It is located at


http://www.kaco-newenergy.de/en/site/service/kundendienst/index.xml.

Hotlines
Technical troubleshooting Technical consultation
Inverters (*) +49 (0) 7132/3818-660 +49 (0) 7132/3818-670
Data logging and accessories +49 (0) 7132/3818-680 +49 (0) 7132/3818-690
Construction site emergency (*) +49 (0) 7132/3818-630
Customer helpdesk Monday to Friday from 7:30 a.m. to 5:30 p.m. (CET)
(*) Also on Saturdays from 8:00 a.m. to 2:00 p.m. (CET)

Page 8 Operating Instructions Powador XP500/550-OD-TL


Unit Descr ipt ion

3 Unit Description
3.1 Technical Data
Model XP500-OD-TL XP550-OD-TL

DC Input
PV Max. generator Power 600kW 660kW
MPP range 550V ~ 830V
Max. permissible DC voltage 1100V1*
Max. permissible DC current 1091A 1200A
Voltage ripple < 3%
Current ripple < 4%
Number of DC inputs 6
AC Output
Rated power 500kVA 550kVA
Grid voltage 3*370V (±10%)

Rated current 780A 858A


Grid frequency 50Hz / 60Hz
THD of grid current < 3% at rated power
Power factor (cos θ) ≥ 0.99 at rated power
0.8 leading … 0.8 lagging (Adjustable)
Power Consumption
Internal consumption in operation < 1% of rated power (< 1650W)
Internal consumption in stand-by < Approx. 110W
Efficiency
Max. efficiency 98.7% 98.7%
Euro efficiency 98.3% 98.3% (Expectation)
Environment
Operating temperature range -20°C ~ +50°C
Storage temperature range -20°C ~ +70°C
Relative humidity 0 ~ 100% (condensing)
Max. altitude above mean sea level 2000m (as per IEC 62040/3)
Cooling Forced Fan (6940m3 per hour)
Audible noise < 70dB
Protection class IP54
Table 1: Electrical data of the inverter
1*
1100Vdc is no-load voltage. And max. operating voltage is 1000Vdc

Operating Instructions Powador XP500/550-OD-TL Page 9


Unit D esc rip tion

Model XP500-OD-TL XP550-OD-TL

Physical Parameters
Dimensions(H/W/D) in mm 2125 / 2600 / 860
Weight 2200kg
Power Density 0.100W/cm3
Standard
EMC EN61000-6-2, EN61000-6-4, EN61000-3-3, EN61000-3-12
Certificates CE
Grid monitoring In accordance with BDEW directive
RD1663
Features
Ground fault detection Yes
Heating Yes
Emergency stop Yes
Overvoltage protection device Yes / Yes
AC / DC
Overvoltage protection for Ethernet Yes
Overvoltage protection device for Yes
auxiliary supply
Interfaces
Communication 2 × RS485 / Ethernet / Wi-Fi
Analog input 4 × UAI2*
Argus box string-monitor RS485
User Digital Input / Output3* 1/1
S0 input / output4* 1/1
Monitoring Device Smart phone (iPhone, Android Phone)
Tablet pc (iPad)
Table 1: Electrical data of the inverter
2*
UAI: User Analog Input. 4 inputs are 1×irradiation input, 1×module temperature, 1×ambient temperature,
1×wind speed. (Option)
3*
UDIO: User Digital Input - 1×Start/Stop signal of the inverter. User Digital Output - 1×External fault signal.
4*
So-impulse signal for energy meter.

Page 10 Operating Instructions Powador XP500/550-OD-TL


Unit Descr ipt ion

3.2 Dimensions

Figure 1: Dimension of the inverter [mm]

Figure 2: Dimension of the inverter base (Bottom View) [mm]

Operating Instructions Powador XP500/550-OD-TL Page 11


Unit D esc rip tion

Figure 3: Minimum workspace requirements of right side [mm]

Figure 4: Minimum workspace requirements of rear side [mm]

Page 12 Operating Instructions Powador XP500/550-OD-TL


Unit Descr ipt ion

3.3 Components inside the inverter


Left side

13

12 1

11
14
10 3
9 4
5
8 15
7
6

Figure 5: Components inside the inverter (left side)

Key
1 EMC 1 (EMC Filter on DC) 8 Overvoltage protection (SP1 - DC Side)
2 GFD (Ground fault detection) 9 Terminals for user connection
3 PSIM (Master control for interface) 10 CB10 (MCCB for use 1100V DC side)
4 CB20 (MCCB for AC grid connection) 11 DC current transformer
5 Overvoltage protection (SP2-AC Side) 12 PEBB (IGBT block)
6 Fuse protection for voltage supply 13 Door sensor
7 DC connection

Fuses information
14 F1, F2 1000Vdc, 2A, gPV
15 F1~F12 1100Vdc, 250A, gPV

Operating Instructions Powador XP500/550-OD-TL Page 13


Unit D esc rip tion

Right side

12

13
11 1
2
10
3
4
5
9

7
8

14

Figure 6: Components inside the inverter (right side)

Key
1 FRT Diode 7 EMC Filter for control power
2 CTR (1PH Transformer) 8 XCU Module
3 FRT TR (1PH Transformer) 9 AC current transformer
4 Capacitor for FRT 10 Filter capacitor
5 Fan for Reactor Cooling 11 MC21 (Contactor for grid connection)
6 SMPS 12 Door sensor

Fuses information
13 F38, F39 600V, 15A, fast-acting
14 F30, F31, F36 600V, 8A, fast-acting
14 F34, F35 600V, 15A, fast-acting

Page 14 Operating Instructions Powador XP500/550-OD-TL


T ransp o rtat ion and Deliver y

4 Transportation and Delivery


4.1 Delivery
The inverters leave our factory in proper electrical and mechanical condition. Special packaging ensures that
they are transported safely. The shipping company is responsible for any damage that occurs during transporta-
tion.

4.1.1 Scope of delivery


• XP500/550-OD-TL
• Documentation

Check your delivery

 Inspect the inverter thoroughly.


 Notify the shipping company immediately if you discover any damage to the packaging which indicates
that the inverter may have been damaged or if you discover any visible damage to the inverter.
 Send the damage report to the shipping company right away. It must be received by them within six days
following receipt of the inverter. We will be glad to help you, if necessary.

4.2 Transportation
The inverter should be shipped using the original packaging to ensure that it is transported safely.
The inverter cabinets is delivered on a pallet.

Operating Instructions Powador XP500/550-OD-TL Page 15


T r ansp o rtation and Deliver y

4.3 Centre of Gravity of the Inverter


The centre of gravity of the inverter is not in the middle of the XP500/550-OD-TL. Take this into
consideration when transporting the XP500/550-OD-TL.
The centre of gravity of the inverter is marked with the centre of gravity symbol on the packaging and the enclo-
sure.

Don‘t Lift This Side


Center of gravity

Left Front
Figure 7: Centre of gravity by Front side

Right Back

Figure 8: Centre of gravity by Rear side

Page 16 Operating Instructions Powador XP500/550-OD-TL


T ransp o rtat ion and Deliver y

Figure 9: Don’t lift by left side

Symbol Explanation

Centre of gravity of the inverter

Can lift from a this side of inverter

Don’t lift from a this side of inverter

The centre of gravity is not center of inverter

Table 2: Symbols on the Packaging

Operating Instructions Powador XP500/550-OD-TL Page 17


S t o rag e/Installat ion/St ar t -up

5 Storage/Installation/Start-up
5.1 Storage
When inverters are in storage, the following conditions are required. If not, this may cause failures. The com-
pany will not be responsible for the problems if following condition is not observed.

• The unit should be stored indoor in its original packaging when it’s being stored more than 6 months. If its
original packaging is removed, it should be stored indoor in a cool, dry place.
• When the unit is stored outdoor, please keep the remained original packaging and do not leave the unit out-
side for long term period.
• Storage temperature: -20°C ~ +70°C
• When inverter is stored under high humidity condition for long term period, it has to be dried out sufficiently
more than 1 day before connecting to the power.

CAUTION
Inverter Storage Caution
Inverters need to be sotred at the correct temperature and correct humidity. If not,
this may cause failures.

5.2 Transporting the unit to the installation location


Once it has arrived at the installation location, the inverter may be transported using the designated eyebolts
or fork-lift. These are located on the top of the inverter housing.

CAUTION
Impact hazard, risk of breakage to the inverter
The centre of gravity is located in the upper part of the inverter.
› Transport the inverter in an upright position.

Transporting the inverter

Transporting the inverter using eyebolts

 Transport the inverter in an upright position.


 Connection the rope to the two eyebolts on the left.
 Connection the rope to the two eyebolts on the right.
 Attach both ropes to a hook, making sure that the ropes do not cross each other.
*The rope length: 1650mm over
 Position the hook at the middle of the unit.

Transporting the inverter using fork-lift

 Remove the front cover of base frame.

Page 18 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

[Eye Nut]

[Fork Lift]

Figure 10: Transporting the unit at the installation location

Figure 11: Transporting the using eyebolts

Operating Instructions Powador XP500/550-OD-TL Page 19


S t o rag e/Installat ion/St ar t -up

5.3 Selecting the installation location


NOTE
The maximum flow rate of the cooling air is 6940m³ per hour.
Please keep this value in mind when you select the installation location.

Figure 12: Ventilation for the inverter [mm]

Page 20 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

5.4 Electrical connection


DANGER
Lethal voltages are still present in the terminals and lines of the inverter even after
the inverter has been switched off and disconnected!
Coming into contact with the lines and terminals in the inverter will cause serious
injury or death.
Only authorised electricians who are approved by the supply grid operator may open,
install and maintain the inverter.
› Use extreme caution when working on the unit.
› Disconnect the AC and DC sides.
› Secure them against being inadvertently switched back on.
› Connect the inverter only after the aforementioned steps have been taken.

5.4.1 Protective earth connection


Connect the PE bus bars
The PE (protective earth) bus bars are located on the left and right sides of the inverter cabinets.

 Connect the wires for “both” PE bus bars.

Earth the inverter

 Determine the lay-out of the permanent wiring.


 Secure the protective earths (tightening torque for PE terminals: 43Nm). Do not use plug connections.
 Check whether all connected cables are securely attached and protected from mechanical forces.
 Attach the Plexiglas cover.

Figure 13: PE busbar

Operating Instructions Powador XP500/550-OD-TL Page 21


S t o rag e/Installat ion/St ar t -up

5.4.2 Connecting to the external transformer (AC connection)


The inverter is connected to the power grid using a 3-phase connection. The connection for the power grid is
located in the left side of the housing, at the bottom.
Use the screws that are supplied to screw down the bus bars on both sides.

Connection data
Number of AC Cables (A,B,C) 12
Max. Cable diameter for each phase 240mm2 x 4
Tightening torque for AC terminal connections 43Nm
Cable lug hole size 12mm ~ 14mm

Connect the cables

Each cable corresponds to one phase.

 Guide the cables through the opening. Be sure to connect each of the cables to the correct terminal.
 Screw down the cables.
 Check to make sure that all of the cables are securely attached.

Figure 14: AC connection

Page 22 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

5.4.3 Requirements for cable routing between transformer and inverter


(AC connection)

WARNING
Fire hazard due to overheating of cables
Differing cable lengths result in overheating of the cables.
› All line conductors from the inverter to the transformer must be of the same length.

The followings are requirements for avoiding current imbalances and cable overheating:

• The minimum size of conductor must be designed based on Table24 of IEC62109-1 2010.
• The AC cables must be bundled in a three-phase system (Required to use cables of the equal type, diameter
and length).
• Between the transformer and the inverter there must be four separate cable routes for the AC cables.
• Lay one A, B and C line conductor in each cable route. Ensure that the distance between the cable bundles
at least doubles the cable diameter.

Figure 15: Arrangement of AC cables with 4-cable-per-line conductor (example)

Operating Instructions Powador XP500/550-OD-TL Page 23


S t o rag e/Installat ion/St ar t -up

5.4.4 Connection for the PV generator (DC connection)


The DC connection is located in the left side of the housing, at the bottom.

Connection data
Tightening torque for DC terminal connections 43Nm
Max. Cable diameter for each fuse 240mm2 x 2
Cable lug hole size 12mm ~ 14mm
Fuse protection for DC connection 250A, 1100V
6 fuses each for DC+ / DC-

DANGER
Lethal voltages in the PV system
Lethal voltages are present in the PV system.
› Make absolutely sure that the plus and minus poles are properly insulated.

Connect the cables

Each cable corresponds to a specific pole.

 Connect the cables to the poles. Make sure the polarity is correct.
 Screw down the cables.
 Check to make sure that all of the cables and seals are securely attached.

NOTE
Please refer to DC Connector Installation manual (NH Fuse Type).

Figure 16: DC connection

NOTE
Use only the optional earthing kit to earth the PV generator.

Page 24 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

5.4.5 Connection for the DC Cable

Figure 17: Bolt & NH Fuse

Item Description
A M12 Bolt Fuse Cover-1
B Flat Washer Fuse Cover-2
C Spring Washer Fuse
D M12 Nut Fuse Base
Table 3: Parameters of operating states

Operating Instructions Powador XP500/550-OD-TL Page 25


S t o rag e/Installat ion/St ar t -up

Single-cable Dual-cable

1 1

2 2

3 3

4 4

NOTE
Bolt Torque: 43Nm

Page 26 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

5.5 Start-up
Before starting the inverter, if components are condensed inside the inverter or have been stored in a highly
humid air for a long time, it has to be dried out enough for more than a day, otherwise it will cause failure. After
that the circuit breakers must be switched ON to start the inverter, which also switches on the control circuits.

DANGER
Lethal voltages are still present in the terminals and lines of the inverter even after
the inverter has been switched off and disconnected!
Coming into contact with the lines and terminals in the inverter will cause serious
injury or death.
Only authorised electricians who are approved by the supply grid operator may open,
install and maintain the inverter.
› Keep all doors and covers closed when the unit is in operation.
› Do not touch the lines and terminals when switching the unit on and off!

Switch on the circuit breakers or Fuse

Step Check Action


1 Fuse F30, 31, 34, 35, 36, 38, 39 ON  Proceed to Step 2
Circuit breakers CB32, 40
OFF  Switch on,
Then proceed to Step 2
2 Circuit breakers MCB20, 21 ON  Proceed to Step 3
Circuit breakers CB20
OFF  Switch on,
Then proceed to Step 3
3 Circuit breaker CB37  Switch on
Then proceed to Step 4
4 Key switch ON  Inverter ON
OFF  Inverter OFF

NOTE
For NG and PG type Inverter, please do not operate MCB20 arbitrarily.
It may cause failure of the unit.

Operating Instructions Powador XP500/550-OD-TL Page 27


S t o rag e/Installat ion/St ar t -up

1, 2, 3
2
1

Figure 18: Cabinet (interior view)

Key
1 Fuse F30, 31, 34, 35, 36, 38, 39
Circuit breakers CB32, 40
2 Circuit breakers MCB20, 21
Circuit breakers CB20
3 Circuit breaker CB37

When voltage is present at the inverter, it can be started up. Use the HMI interface to start up the inverter.
The inverter begins operation in a specified sequence. For more information, see section 5.2 (“Transporting
the unit to the installation location”).
If a fault occurs, the inverter cannot begin operation. For more information on faults, see section 6 (“Faults
and Warnings”).

NOTE
If the fault cannot be reset using “Fault reset”, please contact our service depart-
ment.

Page 28 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

Since CB20 cannot be switched ON/OFF by Key switch, it must be operated manually.
CB20 is a MCCB which can be ON after charged and then OFF without further charging. (one cycle)
When operating, the process below showing how to turn on and off CB20 must be followed.

1 2

3 4

Figure 19: On/off operation of CB20

Key
1 The default appearance of CB20, with black-on-white phrase “DISCHARGED SPRING”.
2 After pulling out the handle, move it back and forth continuously until the CB20 gets charged.
3 When charged, the black-on-white phrase “DISCHARGED SPRING” turns to be “CHARGED SPRING”
in black-on-yellow.
4 Push “Push ON” button to switch ON CB20, then the state of CB20 will go back to the state of
‘Key 1’. To switch it OFF, press the “Push OFF” button.

Operating Instructions Powador XP500/550-OD-TL Page 29


S t o rag e/Installat ion/St ar t -up

5.6 Operation
DANGER
Lethal voltages are still present in the terminals and lines of the inverter even after
the inverter has been switched off and disconnected!
Coming into contact with the lines and terminals in the inverter will cause serious
injury or death.
Only authorised electricians who are approved by the supply grid operator may open,
install and maintain the inverter.
› Keep all doors and covers closed when the unit is in operation.
› Do not touch the lines and terminals when switching the unit on and off!

5.6.1 Operating states


The Inverter has eight operating states. The explanations about each state are below.

Disconnected (default) Before operation has commenced the inverter is in the disconnected state. In
this state, the inverter is totally isolated from the PV array and the utility grid.
Connecting to the PV array When the inverter is in the “Disconnected” state, the ‘Key Switch On’ com-
mand is operated and the PV voltage is kept above 400V for 5 seconds, the
system turns on the PV Array side contactor (PV_MC).
Connecting to Grid When the inverter is in the “Connecting to PV Array” state and the PV volt-
age is kept above the value of “MPPT V Start” parameter during the time set
by “MPPT T start” parameter, the contactor on the grid side is turned on. The
inverter keeps this state for 8 seconds.
Initializing MPP The inverter calculates the MPPT start voltage which is product of measure-
ment of PV voltage and the parameter “MPP Factor”. After 5 seconds, the
inverter system enters into the “MPP start” state.
MPP start In this state, the inverter controls the PV voltage. Reference of the PV voltage
is determined by MPPT start voltage which is calculated at “Initializing MPP”
state.
MPPT If the PV voltage approximates the MPP start voltage (value of “MPPT V Start”
parameter), the MPPT will start. The inverter follows the MPP target value
automatically, which is varied by irradiance values. If the MPP target value is
out of the allowable MPPT range ([MPP start voltage – MPP Range lower] ~
[MPP start voltage + MPP range upper]), the system will return to the “Initial-
izing MPP” state and will recalculate the MPPT start voltage.
System stop When the key switch is off, the PV Array side contactor and the Grid side
contactor are turned off and the system stops. If the output power of inverter
is kept below value of “MPPT P stop” parameter during time of “MPPT T
stop” parameter, connection to the grid is terminated.
Table 4: Operating states

Page 30 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

Fault If a fault occurs during operation, the system stops. The system resets the
fault and tries to remove the fault. In the case that system removes a fault
successfully, system restarts all by itself. The system tries to remove the fault
at intervals of “MPPT Start” parameter since the last try until trial count
reaches to the number set in an “Auto Fault Reset Count” parameter. After
the number reaches to the “Auto Fault Reset Count” parameter, the system
will log an error and the system will not try to restart. In this case, XP500/550-
OD-TL inverter will try to remove the fault again using key Switch On com-
mand (after turning off by key Switch).
Table 4: Operating states

NOTE
If The System doesn’t try to remove the fault, please contact our service hotline.

Operating Instructions Powador XP500/550-OD-TL Page 31


S t o rag e/Installat ion/St ar t -up

5.6.2 Overview of operating states

Figure 20: Overview of operating states

Tag Parameter Default Value


TShift Time Shift (Grid tab) 0sec
Vpv_start MPPT V Start (PV Array tab) 700V
Tstart MPPT T Start (PV Array tab) 900sec
Vmpp_min MPPT V Minimum (PV Array tab) 505V
Pstop MPPT P Stop (PV Array tab) 7kW (above 550kVA capacity: 8kW)
Tstop MPPT T Stop (PV Array tab) 60sec
Table 5: Parameters of operating states

Page 32 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

5.6.3 Run/Stop Condition


The XP500/550-OD-TL inverter supports On/Off function using Key Switch and CMT software.
The states about each condition are below sequence diagram.

Figure 21: Run & Stop Condition about Key Switch & CMT

The XP500/550-OD-TL inverter can be turned On & Off using only Key Switch, and can be turned off through
‘Off’ command of CMT. If the inverter is turned off by ‘Off’ command of CMT, the Fault Lamp is toggled.
Because the Key Switch is on state. And it is turned on by ‘On’ command of CMT or by Key Switch (after turning
off by key Switch).

Operating Instructions Powador XP500/550-OD-TL Page 33


S t o rag e/Installat ion/St ar t -up

5.7 User interface


The HMI (No LCD) has the following functional features:

• SD card: The HMI continually records data to the SD card. When recording once every 10 minutes (around the
clock), the maximum amount of data per year is 360KB. When the SD card is full, the oldest data is overwrit-
ten.

• Ethernet interface for monitoring and service, network connection for remote use

• RS485 interface for logging and transferring data

1 6

3 5
4

Figure 22: HMI Housing Figure 23: HMI Cover Open

Key
1 Housing cover 5 Ethernet interface
2 SD card 6 RS232 interface (internal interface)
3 Wi-Fi antenna 7 RS485 interface
4 Power connection

Page 34 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

5.8 Software upgrade


5.8.1 Changing the SD card, HMI status
Buzzer tells you the status of the SD card because HMI has no LCD Display.

beep once as short Complete the network setting after SD card recognition
beep twice as long Start upgrade HMI Software
beep three times as long Start upgrade XCU Software
beep three times as short Successfully upgraded
beep eight times as short Upgrade fails

Table 6: Changing the SD card, HMI status

*When HMI is not beep (once as short) after inserting the SD card, please reinsert SD card into the HMI after a
few seconds.

DANGER
Lethal voltages are still present in the terminals and lines of the inverter even after
the inverter has been switched off and disconnected!
Coming into contact with the lines and terminals in the inverter will cause serious
injury or death.
Only authorised electricians who are approved by the supply grid operator may open,
install and maintain the inverter.
› Keep all doors and covers closed when the unit is in operation.
› Do not touch the lines and terminals when switching the unit on and off!

Operating Instructions Powador XP500/550-OD-TL Page 35


S t o rag e/Installat ion/St ar t -up

5.8.2 Software upgrade


If an update is available (for example, when new functions are added), use the SD card to update the inverter
software.

Update the HMI software

Perform the following steps in the indicated sequence:


 Copy the software image file (*.img) to the Root directory in the SD card.
 Once the copy is complete, Change the name of the image file to the following text.
- HMI: ‘XP_HMI_SW.img’ (*Name must be the same as above.)
 Insert the SD card into the HMI.
 The start buzzer indicating HMI Software Upgrade after a few seconds will beep twice as long.
 After the upgrade of about 2 ~ 3 minutes is complete, the system is restarted.
 When the upgrade is successful, the short buzzer will sound three times as short.
 If the upgrade fails, the short buzzer will sound eight times as short.

DANGER
Never turn off the power of the HMI and don’t remove the SD card until software
upgrade automatically start and complete.
When power is interrupted or SD card removed during the software upgrade, HMI
can not boot normally.

Update the C6x software

Perform the following steps in the indicated sequence:


 Copy the software file (*.hex) to the Root directory in the SD card.
 Once the copy is complete, Change the name of the image file to the following text.
- XCU: ‘XP_XCU_SW.hex’ (*Name must be the same as above.)
 Insert the SD card into the HMI.
 The start buzzer indicating XCU Software Upgrade after a few seconds will beep three time as long.
 After the upgrade of about 5 minutes is complete.
 When the upgrade is successful, the short buzzer will sound three times as short.
 If the upgrade fails, the short buzzer will sound eight times as short.

Page 36 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

5.8.3 Sequence of the software upgrade

Insert the SD card Insert the SD card


after the SD card HMI Start
removed
Fail SD card recognition
(beep once as short)
OK

NO
HMI Upgrade?

OK
Fail Progressing HMI Upgrade
beep eight times (beep twice as long)
as short Success
Complete HMI Upgrade
(beep three times as short)

NO
XCU Upgrade?

OK
Fail Progressing XCU Upgrade
beep eight times (beep three times as long)
as short Success

Complete XCU Upgrade


(beep three times as short)

Figure 24: Sequence of the software upgrade

Operating Instructions Powador XP500/550-OD-TL Page 37


S t o rag e/Installat ion/St ar t -up

5.9 Connecting to inverter via Wi-Fi in local


HMI has Wi-Fi module that can operating AP mode. Smart Device can connect HMI AP.

5.9.1 IPhone CMT Application


After carry out App. Store, type “kaco” in the research tap. After you go into the set-up of Wi-Fi network,
choose ‘Model Name_Serial No.’

Figure 25: The Wi-Fi setup screen

After you execute CMT, touch the research button on the ‘Local Mode’ screen. Then choose the researched IP.
After that, click the application and it is diverted to the Status screen due to being accessed to the inverter.

 

Figure 26: The Local-connection setup screen

Page 38 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

The status screen shows the trouble of the inverter, Emergency and Stop information and the amount of the
electricity produced. It is the function list of CMT. If you touch the function that you want, it is diverted to the
pertinent function.

Figure 27: The Status screen / The Function screen

The statistic screen displays the statistic data saved in the inverter. If the inverter is broken down, trouble details
are printed out as a list.

Figure 28: The Statistics screen / Fault list screen

Operating Instructions Powador XP500/550-OD-TL Page 39


S t o rag e/Installat ion/St ar t -up

5.9.2 IPad CMT Application


After carry out App. Store, type “kaco” in the research tap. After you go into the set-up of Wi-Fi network,
choose ‘Model Name_Serial No.’

Figure 29: The Wi-Fi setup screen

The status screen shows the status of the inverter, CO2 savings and sensors and the amount of the electricity
produced. It is the function list of CMT. If you touch the function that you want in the navigators of the screen
bottom, display screen is converted to face book / home / statistics / local conn / setup.

Figure 30: The Main screen

Page 40 Operating Instructions Powador XP500/550-OD-TL


Sto rag e/In st allat ion/St ar t -up

It prints out the statistical data per diem in detail. It is possible to move the date using the left and right scroll
on the graph. Or otherwise It is possible to selection of a date.

Figure 31: The Statistics screen

If the inverter is broken down, trouble details are printed out as a list. In case that there are a lot of trouble
details, you can check on the list using the up and down scroll.

Figure 32: The Fault list screen

Operating Instructions Powador XP500/550-OD-TL Page 41


S t o rag e/Installat ion/St ar t -up

It is the function to check on the balance of the electricity produced easily. If you input the standard price per
kWh on the text box located on the top, the balance is shown.
*Due to the fact that it is calculated based on the amount of the produced electricity that is computed in soft
ware, it is not complies with the actual balance.
*A unit price is input once and is saved until it will be changed.

Figure 33: The Balancing screen

Page 42 Operating Instructions Powador XP500/550-OD-TL


Faults and War nings

6 Faults and Warnings


When a problem occurs in the system, the Inverter will inform the user on the Fault Lamp. The Inverter displays
two basic error messages in the CMT (Support the PC and the Mobile version). The first, the fault, is a serious
problem that causes the inverter to stop running. The second, a warning, is a minor problem that does not
cease the system operation. The CMT will indicate faults in red and warnings in yellow. The user can find a
description of the different fault and warnings in the following Tables.

6.1 Warning
Message Code Description
SP1(PV SP) Failure 81 Failure of the PV side surge protector(SP1)
CB10(PV Contactor) Failure 82 PV side contactor(CB10) failure
PV Fuse Failure 83 PV side Fuse failure(option)
Ground Fault Warning 84 The insulation resistance of the PV falls short of the limit set in the
ground fault monitoring for Alert1(option)
PV Over Voltage 85 PV voltage exceeds the parameter [DC over voltage Level]
PEBB Over Temp. Warning 100 The temperature of the PEBB(Power Electronics Building Block) over
85°C(185°F)
PEBB Fan Failure 101 Failure of a PEBB(Power Electronics Building Block) fan
PEBB Temperature 102 The Difference of each PEBB temperature exceeds the operational
Unbalance parameter [PEBB Temperature Unbalance Level]
SP2(Grid SP) Failure 110 Failure of the grid side surge protector(SP2)
ASYNC Warning 111 The phase synchronous of inverter and grid failure
Test Mode 120 The system is working in test mode
Watchdog 121 Abnormalities detection in the DSP
Invalid Parameter 125 Parameter is invalid value
Reconnection Condition 126 The grid voltage or frequency exceeds the reconnection condition
Warning when reconnection to grid during operational parameter [Reconnec-
tion Condition Warning Delay] seconds
Cabinet Over Temp. 130 The temperature of the cabinet over the parameter [Cabinet Tempera-
Warning ture Maximum]
Cabinet Under Temp. 131 The temperature of the cabinet falls below the parameter [Cabinet
Warning Temperature Minimum]
SP3(Control Power SP) 132 Failure of the control side surge protector(SP3)
Failure
CB32 Open 133 Failure of the top fan or power supply
SMPS Warning 134 Failure of the control SMPS(Switching Mode Power Supply)
CAN TX Failure 135 CAN bus communication transmission failure
CAN RX Failure 136 CAN bus communication reception failure

Table 7: Warning

Operating Instructions Powador XP500/550-OD-TL Page 43


Faults and War nings

Message Code Description


CAN EP Failure 137 CAN bus communication Error-Passive error
CAN Bus-Off 138 CAN bus communication Bus-off error
CAN Wrong Message 139 Reception of Wrong message in CAN bus communication
CAN Time Out 140 Time out in CAN bus communication
CAN Multiple Master 141 There are multiple Masters in CAN bus communication

Table 7: Warning

6.2 Fault
Message Code Description
PV Over Voltage 1 PV voltage exceeds the parameter [DC over voltage Level]
PV Over Current 2 PV current exceeds the parameter [DC over current Level]
CB10(PV CB) Trip 4 PV side circuit breaker(CB10) tripped
PV Polarity Failure 5 Polarity(+, -) of PV side is reversed
Ground Fault 6 PV side ground fault
Inv. Over Voltage 10 Inverter side Voltage over the parameter [Grid Over Voltage Level 2]
Inv. Under Voltage 11 Inverter side Voltage under the parameter [Grid Under Voltage Level 2]
Inv. Over Frequency 12 Inverter side Frequency over the parameter [Grid over Frequency Level 2]
Inv. Under Frequency 13 Inverter side Frequency under the parameter [Grid under Frequency
Level 2]
Inv. Over Current 14 Inverter side Current over the parameter [Inverter OverCurrent Level]
MC21(Inv. MC) Failure 15 Inverter side contactor(MC21) failure
Inv. Phase Order 16 Phase order failure on the inverter side, wrong phase rotation
Inductor or TR Over Temp. 18 Inductor or Transformer temperature over 150°C
Inv. Current Unbalance 19 The unbalanced current of inverter side
PEBB(1) IGBT Fault 20 PEBB 1 IGBT failure
PEBB(2) IGBT Fault 21 PEBB 2 IGBT failure
PEBB(3) IGBT Fault 22 PEBB 3 IGBT failure
PEBB Over Temp. Analog 24 The temperature of the heat-sink over the parameter [Heatsink OT
Level] (Analog)
PEBB Over Temp. Digital 25 The temperature of the heat-sink over 100°C(Digital)
Grid Over Voltage 1 30 Grid side Voltage over the parameter [Grid Over Voltage Level 1]
Grid Under Voltage 1 31 Grid side Voltage under the parameter [Grid Under Voltage Level 1]

Table 8: Fault

Page 44 Operating Instructions Powador XP500/550-OD-TL


Faults and War nings

Message Code Description


Grid Over Frequency 1 32 Grid side Frequency over the parameter [Grid Over Frequency Level 1]
Grid Under Frequency 1 33 Grid side Frequency under the parameter [Grid Under Frequency Level 1]
Grid CB Trip 34 CB20(AC Disconnect/Grid circuit breaker) was tripped during operation
Grid Over Voltage 2 35 Grid side Voltage over the parameter [Grid Over Voltage Level 2]
Grid Under Voltage 2 36 Grid side Voltage Under the parameter [Grid Under Voltage Level 2]
Grid Under Frequency 2 37 Grid side Frequency Under the parameter [Grid Under Frequency Level 2]
Grid Over Frequency 2 38 Grid side Frequency Over the parameter [Grid Over Frequency Level 2]
Parameters Version Error 40 Different version between the NVSRAM parameter table and the pro-
gram parameter table
Flash Memory Failure 41 C6000 DSP program flash memory failure in XCU(main control) board
FPGA Failure 42 FPGA failure in XCU(main control) board
DSP28x Failure 43 F2000 DSP failure in XCU(main control) board
ADC Failure 44 ADC block failure in XCU(main control) board
NVSRAM Failure 45 NVSRAM Failure in XCU(main control) board or invalid parameter set-
ting
Asynchronous 46 Synchronous fail of Grid and Inverter
CAN Failure 47 CAN bus communication failure
Emergency Stop 50 A door is open
MasterSlave Fault 52 Master Slave operation Failure
Grid Over Frequency Level3 57 Grid side Frequency over the parameter [Grid Over Frequency Level 3]
Grid Under Frequency 58 Grid side Frequency under the parameter [Grid Under Frequency Level 3]
Level3
Grid Over Voltage Slow 59 Grid side Voltage over the parameter [Grid Over Voltage Level Slow]
(RMS average value per 10 min)
MMI-XCU Communication 63 MMI-XCU communication Error
Error

Table 8: Fault

Operating Instructions Powador XP500/550-OD-TL Page 45


Faults and War nings

6.3 Solution for Error code


The Inverter can detect faults during operation. The inverter will display the fault in the CMT. Faults are indi-
cated in the CMT with an error code, and a plain text message with the error code and system plant name in
the text line will be sent to the system operator (only available if purchased and configured during setup). This
section describes how to recognize the types of faults and how to correct these faults.

Warning
Code Message Warning description Possible problem and Solution(s)
81 SP1(PV SP) Failure Failure of the PV side surge Possible problem
protector(SP1) • Lightning strike on or near the PV system
wiring
Solution(s)
• Visual inspection
• Change the SPD
83 PV Fuse Failure PV side Fuse failure(option) Possible problem
• PV system wiring short
• Short circuit in the IGBT
Solution(s)
• Check the input current
• Check module wiring
• Change the FUSE
100 PEBB Over Temp. The temperature of the Possible problem
Warning PEBB(Power Electronics Building • PEBB Fan Failure
Block) over 85°C(185°F)
Solution(s)
• Clean the filters or PEBB heat-sink fins
• Change the PEBB Fan
101 PEBB Fan Failure Failure of a PEBB(Power Elec- Possible problem
tronics Building Block) fan • PEBB Fan Failure
Solution(s)
• Change the PEBB Fan
110 SP2(Grid SP) Failure Failure of the grid side surge Possible problem
protector(SP2) • Lightning strike on or near the grid
system wiring
Solution(s)
• Visual inspection
• Change the SPD
120 Test Mode The system is working in test Possible problem
mode • The system is working in test mode
Solution(s)
• Change the parameters in the GUI

Table 9: Warning

Page 46 Operating Instructions Powador XP500/550-OD-TL


Faults and War nings

Code Message Warning description Possible problem and Solution(s)


130 Cabinet Over Temp. The temperature of the cabinet Possible problem
Warning over the parameter [Cabinet • Cabinet Fan Failure
Temperature Maximum]
Solution(s)
• Clean the air filters
• Change the cabinet fan
131 Cabinet Under Temp. The temperature of the cabinet Possible problem
Warning falls below operational param- • Ambient temperature is too low for
eters [Cabinet Temperature operation
Minimum]
134 SMPS Warning Failure of the control SMPS Possible problem
• Failure of the control SMPS
Solution(s)
• Change the control SMPS
135 CAN TX Failure CAN bus communication
transmission failure
136 CAN RX Failure CAN bus communication
reception failure
Possible problem
137 CAN EP Failure CAN bus communication
• CAN bus communication Failure
Error-Passive error
Solution(s)
138 CAN Bus-Off CAN bus communication
• Check the CAN bus Connection
Bus-off error
• Check the CAN bus terminal registers
139 CAN Wrong Message Reception of Wrong message in
CAN bus communication
140 CAN Time Out Time out in CAN bus communi-
cation
141 CAN Multiple Master There are multiple Masters in Possible problem
CAN bus communication • CAN ID is duplicated
Solution(s)
• Change the parameters in the GUI

Table 9: Warning

Operating Instructions Powador XP500/550-OD-TL Page 47


Faults and War nings

Fault
Code Message Warning Description Possible problem and Solution(s)
1 PV Over Voltage PV voltage exceeds the param- Possible problem
eter [DC over voltage Level] • The voltage of the solar generator is too
high
Solution(s)
• Check the input voltage
• Check module wiring and system
2 PV Over Current PV current exceeds the parame- Possible problem
ter [DC over current Level] • The current of the solar generator is too
high
• PV system wiring short
Solution(s)
• Check the input current
• Check module wiring and system
4 CB10(PV CB) Trip PV side circuit breaker(CB10) Possible problem
tripped • CB10 disconnect switch is open
• Auxiliary switch is inoperable, CB10
contactor failed closed
Solution(s)
• Check the wiring connection
• Change the CB10, replace CB10
contactor
5 PV Polarity Failure Polarity(+, -) of PV side is Possible problem
reversed • Polarity of PV side is reversed
Solution(s)
• Check the wiring connection and
change if necessary
6 Ground Fault PV side ground fault Possible problem
• The GFDI fuse in inverter is opened
causing PV side grounding or short-cir
cuit fault(DC side Grounding Type)
• The unbalance of measured PV voltage
in inverter causing PV side grounding or
short-circuit fault(DC side Isolation
Type)
Solution(s)
• Check the solar generator for a
grounding or short-circuit fault and
Replace the GFDI Fuse(DC side
Grounding Type)
• Check the solar generator for a
grounding or short-circuit fault(DC side
Isolation Type)

Table 10: Fault

Page 48 Operating Instructions Powador XP500/550-OD-TL


Faults and War nings

Code Message Warning Description Possible problem and Solution(s)


10 Inv. Over Voltage Inverter side Voltage over the Possible problem
parameter [Grid Over Voltage • The inverter voltage is too high
Level 2] Solution(s)
• Check the inverter voltage
• Check the inverter parameter
11 Inv. Under Voltage Inverter side Voltage under the Possible problem
parameter [Grid Under Voltage • The inverter voltage is too low
Level 2] Solution(s)
• Check the inverter voltage
• Check the inverter parameter
• Check the MC21
12 Inv. Over Frequency Inverter side Frequency over the Possible problem
parameter [Grid over Frequency • The grid frequency is outside the
Level 2] permitted range
Solution(s)
• Check the grid frequency
13 Inv. Under Frequency Inverter side Frequency under Possible problem
the parameter [Grid under • The grid frequency is outside the
Frequency Level 2] permitted range
Solution(s)
• Check the grid frequency
14 Inv. Over Current Inverter side Current over the Possible problem
parameter [Inverter OverCurrent • Short circuit in the IGBT
Level]
• Short circuit in the Grid
Solution(s)
• Check the grid connection
• Check the inverter connection
15 MC21(Inv. MC) Failure Inverter side contactor(MC21) Possible problem
failure • MC21 contactor is open
• Auxiliary switch is inoperable
Solution(s)
• Check the wiring connection
• Change the MC21
16 Inv. Phase Order Phase order failure on the Possible problem
inverter side • Phase order failure on the inverter
• Wrong phase rotation
Solution(s)
• Check the wiring connection
• Reverse two phases

Table 10: Fault

Operating Instructions Powador XP500/550-OD-TL Page 49


Faults and War nings

Code Message Warning Description Possible problem and Solution(s)


18 Inductor or TR Over Inductor or Transformer temper- Possible problem
Temp ature over 150°C • Cabinet fan failure
Solution(s)
• Cleaning the filters
• Change the cabinet Fan
20 PEBB(1) IGBT Fault PEBB IGBT U failure Possible problem
21 PEBB(2) IGBT Fault PEBB IGBT V failure • Short circuit in the IGBT
Solution(s)
22 PEBB(3) IGBT Fault PEBB IGBT W failure
• Visual inspection
• Change the PEBB
24 PEBB Over Temp. The temperature of the heat- Possible problem
Analog sink over the parameter [Heat- • PEBB fan failure
sink OT Level] (Analog)
Solution(s)
• Clean the filters
• Inspect and if necessary clean the
heat-sink fins
• Change the PEBB Fan
25 PEBB Over Temp. The temperature of the heat- Possible problem
Digital sink over 100°C(Digital) • PEBB Fan Failure
Solution(s)
• Inspect and if necessary clean the
heat-sink fins Change the PEBB Fan
30 Grid Over Voltage Grid side Voltage over the Possible problem
level 1 parameter [Grid Over Voltage • The grid voltage is too high
Level 1]
Solution(s)
• Check the grid voltage
• Check the grid parameter
31 Grid Under Voltage Grid side Voltage under the Possible problem
level 1 parameter [Grid Under Voltage • The grid voltage is too low
Level 1]
Solution(s)
• Check the grid voltage
• Check the grid parameter
• Check the MCB24
32 Grid Over Frequency Grid side Frequency over the Possible problem
level 1 parameter [Grid Over Frequency • The grid frequency is outside the
Level 1] permitted rang
Solution(s)
• Check the grid frequency
• Check the grid parameter

Table 10: Fault

Page 50 Operating Instructions Powador XP500/550-OD-TL


Faults and War nings

Code Message Warning Description Possible problem and Solution(s)


33 Grid Under Frequency Grid side Frequency under the Possible problem
level 1 parameter [Grid Under Fre- • The grid frequency is outside the
quency Level 1] operation range
Solution(s)
• Check the grid frequency
• Check the grid parameter
34 Grid CB Trip CB20(AC Disconnect/Grid circuit Possible problem
breaker) was tripped during • Short circuit in the grid
operation
Solution(s)
• Check the wiring connections
35 Grid Over Voltage Grid side Voltage over the Possible problem
Level 2 parameter [Grid Over Voltage • The grid voltage is too high
Level 2]
Solution(s)
• Check the grid voltage
• Check the grid parameter
36 Grid Under Voltage Grid side Voltage Under the Possible problem
Level 2 parameter [Grid Under Voltage • The grid voltage is too low
Level 2]
Solution(s)
• Check the grid voltage
• Check the grid parameter
37 Grid Under Frequency Grid side Frequency Under the Possible problem
Level 2 parameter [Grid Under Fre- • The grid frequency is outside the
quency Level 2] operation range
Solution(s)
• Check the grid frequency
38 Grid Over Frequency Grid side Frequency Over the Possible problem
Level 2 parameter [Grid Over Frequency • The grid frequency is outside the
Level 2] permitted range
Solution(s)
• Check the grid frequency
40 Parameters Different version between the Possible problem
Version Error NVSRAM parameter table and • Different version between the NVSRAM
the program parameter table parameter table and the program
parameter table
Solution(s)
• Initialize the parameter menu setting in
the GUI and reset faulted parameter
• Change the PCB module

Table 10: Fault

Operating Instructions Powador XP500/550-OD-TL Page 51


Faults and War nings

Code Message Warning Description Possible problem and Solution(s)


41 Flash Memory C6000 DSP program flash Possible problem
Failure memory failure in XCU(main • Internal C6000 error
control) board
Solution(s)
• Change the PCB module
42 FPGA Failure FPGA failure in XCU(main Possible problem
control) board • Internal FPGA error
Solution(s)
• Change the PCB module
43 DSP28x Failure F2000 DSP failure in XCU(main Possible problem
control) board • Internal F2000 error
Solution(s)
• Change the PCB module
44 ADC Failure ADC block failure in XCU(main Possible problem
control) board • Internal Analog to Digital converter
error
Solution(s)
• Change the PCB module
45 NVSRAM Failure NVSRAM failure in XCU(main Possible problem
control) board or invalid param- • Internal NVSRAM error
eter
• Invalid parameter
Solution(s)
• Initialize the parameter menu setting in
the GUI
• Change the PCB module
47 CAN Failure CAN bus communication failure Possible problem
• CAN bus communication Failure
Solution(s)
• Check the CAN bus Connection
• Check the CAN bus terminal registers
50 Emergency Stop The door is open Possible problem
• Front door is open
• Broken or out of alignment door switch
Solution(s)
• Close the door
• Align or replace door switch

Table 10: Fault

Page 52 Operating Instructions Powador XP500/550-OD-TL


Faults and War nings

Code Message Warning Description Possible problem and Solution(s)


52 Master Slave Fault Master Slave operation Failure Possible problem
• Wrong CAN ID
• CAN bus communication Failure
Solution(s)
• Check the parameters
• Check the CAN bus Connection
• Check the CAN bus terminal registers
57 Grid Over Frequency Grid side Frequency over the Possible problem
Level 3 parameter [Grid Over Frequency • The grid frequency is outside the
Level 3] permitted range
Solution(s)
• Check the grid frequency
• Check the grid parameter
58 Grid Under Frequency Grid side Frequency under the Possible problem
Level 3 parameter [Grid Under Fre- • The grid frequency is outside the
quency Level 3] operation range
Solution(s)
• Check the grid frequency
• Check the grid parameter
63 MMI-XCU Communi- MMI-XCU communication Error Possible problem
cation Error • MMI-XCU Communication Error
Solution(s)
• Check MMI-XCU communication
connectivity

Table 10: Fault

Operating Instructions Powador XP500/550-OD-TL Page 53


Maintenance/Cleaning

7 Maintenance/Cleaning
Maintenance must be performed on the inverter at regular intervals (below is the maintenance schedule).

DANGER
Lethal voltages are still present in the terminals and lines of the inverter even after
the inverter has been switched off and disconnected!
Coming into contact with the lines and terminals in the inverter will cause serious
injury or death.
Only authorised electricians who are approved by the supply grid operator may open,
install and maintain the inverter.
› Keep all doors and covers closed when the unit is in operation.
› Do not touch the lines and terminals when switching the unit on and off!

Switch off the inverter

 Using CMT or Key switch to Stop the inverter.


 Switch the Power grid switch to OFF (disconnect the inverter from the grid).
 Switch the DC disconnector to OFF (disconnect the inverter from the PV generator).
 Make sure that the inverter is disconnected from all voltage sources.
 Please open the door, switch the CB33 or CB37 to OFF.
 Wait at least ten minutes before working on the inverter.

Switch on the inverter

 Switch the CB33 or CB37 to ON.


 Switch the Power grid switch to ON (connect the inverter to the grid).
 Switch the DC disconnector to ON (connect the inverter to the PV generator).
 Turn ON the key switch.
 Press the HMI ON button.

Page 54 Operating Instructions Powador XP500/550-OD-TL


Maintenan ce/C leaning

7.1 Maintenance intervals


DANGER
Lethal voltages are still present in the terminals and lines of the inverter even after
the inverter has been switched off and disconnected!
Coming into contact with the lines and terminals in the inverter will cause serious
injury or death.
Only authorized electricians who are approved by the supply grid operator may open,
install and maintain the inverter.
› Do not touch the lines and terminals when switching the unit on and off. Do not
touch exposed contact connections.
› Always shut down the inverter prior to cleaning or maintenance.

NOTE
Even between maintenance intervals, pay attention to any unusual behaviour that the inverter
displays during operation, and fix the problem immediately.

Recommended
Maintenance-inter- Maintenance work
vals
6 months* Cleaning or replacement Filter mats in the air intake filter
6 months Cleaning Inside of the cabinet
Fans
12 months* Function check Emergency stop (OFF)
12 months Cleaning Power section of the heat sink
12 months Visual inspection Contact connection
Fuses
Switches
Overvoltage protection
Redundant auxiliary power supplies
Check all parts in the cabinet for
– Heavy dust deposits and soiling
– Moisture (especially water that has
permeated from the outside)
Visual inspection All warning labels
(and replacement, if necessary)
Function check Fans
Door contacts
Operating lights and fault lights
12 months Torque check Input, output, Check the status of the screws
*If heavy soiling is present at the installation location, you may need to shorten the maintenance interval.

Table 11: Maintenance intervals

Operating Instructions Powador XP500/550-OD-TL Page 55


Maintenance/Cleaning

7.2 Cleaning and replacing the filters


The inverter is equipped with thirteen filters. Filters at the top and bottom of the equipment, and is in the back
The filters must be cleaned on a regular basis to ensure maximum performance. If there are any problems with
the fans, repair or replace them.

7.2.1 Accessing the fans


Cleaning & Replacing the top side filters

 Switching off the Inverter.


 Remove the upper cover from the inverter.
 Remove the filter cover.
 Cleaning or Replacing the filter.
 Assembly the filter cover.
 Assembly the upper cover from the inverter.
 Switching on the Inverter.

Cleaning & Replacing the rear side filters

 Switching off the Inverter.


 Remove the cover on rear side filter from the inverter.
 Cleaning or Replacing the filter.
 Assembly the filter cover.
 Assembly the filter cover of rear side from the inverter.
 Switching on the Inverter.

Cleaning & Replacing the bottom side filters in inverter

 Switching off the Inverter.


 Remove the filter on rear side.
 Remove the filter cover on bottom side in inverter.
 Cleaning or Replacing the filter.
 Assembly the filter cover.
 Assembly the filter cover of rear side from the inverter.
 Switching on the Inverter.

Page 56 Operating Instructions Powador XP500/550-OD-TL


Maintenan ce/C leaning

Roof Cover

Filter Cover

Filter

Figure 34: Cleaning & Replacing the top side filter

Filter Bracket

Filter

Inner Cover

External Cover

Figure 35: Cleaning & Replacing the rear side filter

Figure 36: Cleaning & Replacing the bottom side filter

Operating Instructions Powador XP500/550-OD-TL Page 57


Maintenance/Cleaning

7.3 Cleaning and Replacing the fans


The inverter is equipped with ten fans. Six of the fans are installed in the left-top side of the housing to provide
ventilation for left side enclosure including PEBB (IGBT Stack). The other four fans in the right side of the hous-
ing is used to ventilate the right side enclosure. The fans must be cleaned on a regular basis to ensure maximum
performance. If there are any problems with the fans, repair or replace them.

7.3.1 Accessing the fans


Cleaning & Replacing the top side Fans

 Switching off the Inverter.


 Remove the upper cover from the inverter.
 Remove the filter on top side.
 Cleaning or Replacing the fans.
 Assembly the filter on top side.
 Assembly the upper cover from the inverter.
 Switching on the Inverter.

Cleaning & Replacing the inner side Fans

 Switching off the Inverter.


 Open the front door.
 Cleaning or Replacing the inner side fans.
 Close the front door.
 Switching on the Inverter.

Figure 37: Cleaning & Replacing the Top side fans

Page 58 Operating Instructions Powador XP500/550-OD-TL


Maintenan ce/C leaning

Figure 38: Cleaning & Replacing the Inner side fans

Operating Instructions Powador XP500/550-OD-TL Page 59


Parameters

8 Parameters
The KACO XP-HV and XP-TL series parameters are pre-configured for operation. It is a good idea to adapt a
number of the KACO XP series parameters to the solar generator.
XP500/550-OD-TL parameters are subdivided into ten:

• PV Array
Setting values for MPPT control and startup of inverter
• Inverter
Setting values for inverter rate and cabinet temperature
• Grid
Setting values for abnormal and rated levels of grid
• Time
Setting values for the current time
• Digital
Setting values for digital interface
• Analog
Setting values for analog interface
• Controller
Setting values for inverter control
• Trace
Setting values for inverter fault analysis
• Offset
Setting values for sensing offset calibration
• Gain
Setting values for sensing gain calibration

8.1 PV Array Parameters


Parameters Min Max Unit Descriptions
MPPT Enable 0 1 - 1: MPPT is enabled
0: MPPT is disabled
MPPT V Maximum 0 830 Vdc Maximum voltage to run MPPT
MPPT V Start 200 800 Vdc MPPT wake-up voltage
MPPT T Start 0 3600 sec Time delay for MPPT wake-up
MPPT P Stop 0 10000 W Disconnect inverter from Grid when PV output
power is lower than the setting value of {MPPT P
Stop}.
MPPT T Stop 0 600 sec Time delay while inverter decides if PV output
power is lower than the setting value of {MPPT P
Stop}.

Table 12: PV Array Parameters

Page 60 Operating Instructions Powador XP500/550-OD-TL


Param eter s

Parameters Min Max Unit Descriptions


MPPT V Minimum 200 800 Vdc Minimum voltage to run MPPT
Exception)
DC Over Voltage 300 1020 Vdc Upper limit for PV over voltage fault
Level
DC Over Current 0 150 % Upper limit for PV over current fault
Level
MPP Factor 0 1 - Maximum power point factor
MPP Range Upper 10 300 Vdc Upper limit of maximum power point
MPP Range Lower 10 300 Vdc Lower limit of maximum power point
PV Operation Level 900 1020 Vdc Maximum PV operation level

Table 12: PV Array Parameters

8.1.1 Operating DC voltage range

Figure 39: Operating DC voltage range

The range of possible operational input voltage is from [MPPT V Minimum] to [PV Operation Level]. The picture
above shows that the output power decreases linearly where the input power is from [MPPT V Maximum] to
[PV Operation Level].

Operating Instructions Powador XP500/550-OD-TL Page 61


Parameters

8.2 Inverter Parameters


Parameters Min Max Unit Descriptions
Transformer & Type 0 8 N/A This parameter determines device specific informa-
tion such as a switch type on DC side and whether
the inverter has an internal transformer.
Inverter Capacity 100 550 kW Power Capacity of the inverter
Inverter Over 0 200 % Upper limit for inverter over current fault
Current Level
Current Limit 0 150 % Limit of current which produces from the inverter
Cabinet Tempera- 30 70 °C Upper limit for cabinet over temperature warning
ture Maximum
Cabinet Tempera- -25 10 °C Lower limit for cabinet under temperature warning
ture Minimum
PEBB Temperature 5 30 °C Limit of Temperature gap between PEBBs
Unbalance Level

Table 13: Inverter Parameters

8.3 Grid Parameters


Parameters Min Max Unit Descriptions
Rated Grid Voltage 208 400 V Rated value of the grid voltage
Rated Grid 50 60 Hz Rated value of the grid frequency
Frequency
Grid Over Voltage 105 130 % Upper limit expressed as a percentage of the rated
Level 1 grid voltage for grid overvoltage level 1
Grid Under Voltage 75 100 % Lower limit expressed as a percentage of the rated
Level 1 grid voltage for grid under voltage Level 1
Grid Over Frequency 0 3 Hz Upper limit for grid over frequency level 1
Level 1
Grid Under Fre- 0 3 Hz Lower limit for grid under frequency level 1
quency Level 1
Frequency Depend- 0 2 - Power reduction function dependant on frequency
ant Power Reduc- rise
tion Mode 0: Disable
1: Enable

Table 14: Grid Parameters

Page 62 Operating Instructions Powador XP500/550-OD-TL


Param eter s

Parameters Min Max Unit Descriptions


Power Gradient 0 5 - Power gradient function when inverter start
Mode 0: Disable
1: Activated when connected to grid after fault
(Germany Medium Voltage Requirements)
2: Activated according to VDE-AR-N 4105
(Germany Low Voltage Requirements)
3: Activated whenever connected to grid
(Italy TERNA Grid Code)
Power Gradient 0 600 sec Ramp time for power gradient
Ramp
Time Shift 0 6000 sec Delay time for inverter start
Gate-way Enable 0 1 - Reserved
Grid Level 2 0 1 - Grid level 2 protection function
Protection Enable 0: Disable
1: Enable
Grid Over Voltage 105 130 % Upper limit expressed as a percentage of the rated
Level 2 grid voltage for grid overvoltage level 2
Grid Under Voltage 15 100 % Lower limit expressed as a percentage of the rated
Level 2 grid voltage for grid under voltage Level 2
Grid Under 0 3.5 Hz Lower limit for grid under frequency level 2
Frequency Level 2
Grid Over Voltage 100 10000 ms Time for grid over voltage level 1 trip
Level 1 Trip Time
Grid Over Voltage 40 2000 ms Time for grid over voltage level 2 trip
Level 2 Trip Time
Grid Under Voltage 100 10000 ms Time for grid under voltage level 1 trip
Level 1 Trip Time
Grid Under Voltage 40 3000 ms Time for grid under voltage level 2 trip
Level 2 Trip Time
Grid Under Fre- 100 20000 ms Time for grid under frequency level 1 trip
quency Level 1 Trip
Time
Grid Under Fre- 40 3000 ms Time for grid under frequency level 2 trip
quency Level 2 Trip
Time
Grid Over Frequency 40 3000 ms Time for grid over frequency level 1 trip
Level 1 Trip Time
FRT Enable 0 1 - FRT(Fault Ride Through) Function
0: Disable
1: Enable

Table 14: Grid Parameters

Operating Instructions Powador XP500/550-OD-TL Page 63


Parameters

Parameters Min Max Unit Descriptions


Grid Over Voltage 0 1 Over Voltage FRT Function
FRT Enable 0: Disable
1: Enable
Power Reduction 0 100 %/Hz Gradient level for frequency dependant power
Gradient Level reduction
Power Reduction 0 0.3 Hz Frequency limit for frequency dependant power
Deactivation reduction deactivation
Frequency
Grid Over Frequency 0 3 Hz Upper limit for grid over frequency level 2
Level 2
Grid Over Frequency 40 2000 ms Time for grid over frequency Level 2 trip
Level 2 Trip Time
Reconnection 0 2 - Reconnection Condition Function
Condition Mode 0: Disable
1: Checked before connected to grid
(Germany Medium Voltage Requirements)
2: Checked according to VDE-AR-N 4105
(Germany Low Voltage Requirements)
Reconnection -1 130 % This parameter represents the upper voltage in the
Condition Upper range of “Reconnection condition” as a percent-
Voltage age of the rated value.
The negative value represents that the relevant
condition is not checked when an inverter decides
“Reconnection condition”.
Reconnection -1 100 % This parameter determines the lower voltage of
Condition Lower “Reconnection condition” range as a percentage
Voltage of the rated value.
The negative value represents that the relevant
condition is not checked when an inverter decides
“Reconnection condition”.
Reconnection -1 3 Hz This parameter determines the upper frequency of
Condition Upper “Reconnection condition” range as an increment
Frequency from the rated value.
The negative value represents that the relevant
condition is not checked when an inverter decides
“Reconnection condition”.
Reconnection -1 3 Hz This parameter determines the lower frequency of
Condition Lower “Reconnection condition” range as a decrement
Frequency from the rated value.
The negative value represents that the relevant
condition is not checked when an inverter decides
“Reconnection condition”.

Table 14: Grid Parameters

Page 64 Operating Instructions Powador XP500/550-OD-TL


Param eter s

Parameters Min Max Unit Descriptions


Reconnection 0 1800 sec This parameter is used for time check during
Condition Check “Reconnection condition” for all the time except
Time Normal after fault.
Reconnection 0 1800 sec This parameter is used for time check during
Condition Check “Reconnection condition” for after fault only.
Time After Fault
Grid Over Frequency 0 3 Hz Upper limit for grid over frequency level 3
Level 3
Grid Over Frequency 40 2000 ms Time for grid over frequency Level 3 trip
Level 3 Trip Time
Grid Over Voltage 105 115 % This parameter represents Upper limit for the
Level Slow average RMS value of grid voltage as a percentage
of the rated grid voltage.
If the average RMS value of grid voltage exceeds
this parameter setting, fault will be occurred.
VDE-AR-N 4105(Germany Low Voltage Require-
ments)
Grid Over Voltage -1 3000 sec This parameter determines how long the average
Level Slow Shift RMS value of grid voltage will be calculated.
Average Time (Low Voltage Requirements: 600 seconds duration)
Negative value means that the relevant function
(Grid Over Voltage level slow) is disabled.
Reconnection 0 600 sec Time delay for Reconnection Condition Warning
Condition Warning
Delay
Grid Under Fre- 0 3 Hz Lower limit for grid over frequency level 3
quency Level 3
Grid Under Fre- 0 60000 ms Time for grid over frequency Level 3 trip
quency Level 3 Trip
Time
Upper Deadband 100 110 % Voltage Level for activation of P/Pn function when
PPN selected CEI 0-21 grid code
Lower Deadband 90 100 % Voltage Level for deactivation of P/Pn function
PPN when selected CEI 0-21 grid code
Upper Deadband 10 100 % Active Power Level for activation of Q(V) function
QV when selected CEI 0-21 grid code
Lower Deadband 1 20 % Active Power Level for deactivation of Q(V)
QV function when selected CEI 0-21 grid code
QV Voltage 1 100 110 % Voltage upper dead band of Q(V) function when
selected CEI 0-21 grid code
QV Voltage 2 90 100 % Voltage lower dead band of Q(V) function when
selected CEI 0-21 grid code

Table 14: Grid Parameters

Operating Instructions Powador XP500/550-OD-TL Page 65


Parameters

Parameters Min Max Unit Descriptions


QV Voltage 3 100 110 % Voltage upper level to calculate ramp of Q(V)
function when selected CEI 0-21 grid code
QV Voltage 4 90 100 % Voltage lower level to calculate ramp of Q(V)
function when selected CEI 0-21 grid code
QV Inductive Max 0 48 % Reactive Power inductive maximum value of Q(V)
function
QV Capacitive Max 0 48 % Reactive Power capacitive maximum value of Q(V)
function

Table 14: Grid Parameters

8.3.1 FRT Enable Off


If the function of FRT(Fault-ride through) is not active, XP series parameters for abnormal grid is as follows.

Grid Under Frequency

Figure 40: Grid under frequency

1. f < frated–2Hz, t > 10s  Grid Under Frequency Level 1 Fault


2. f < frated–2.5Hz, t > 100ms  Grid Under Frequency Level 2 Fault

Page 66 Operating Instructions Powador XP500/550-OD-TL


Param eter s

Grid Over Frequency

Figure 41: Grid over frequency

1. f > frated+0.2Hz, t > 100ms  Grid Over Frequency Fault


2. It disables Grid Over Frequency Level 2 and Grid Over Frequency Level 2.

Grid Under Voltage

Figure 42: Grid under voltage

1. U < 0.9*Urated, t > 5s  Grid Under Voltage Level 1 Fault


2. U < 0.8*Urated, t > 100ms  Grid Under Voltage Level 2 Fault

Operating Instructions Powador XP500/550-OD-TL Page 67


Parameters

Grid Over Voltage

Figure 43: Grid over voltage

1. U > 1.1*Urated, t > 5s  Grid Over Voltage Level 1 Fault


2. U > 1.2*Urated, t > 100ms  Grid Over Voltage Level 2 Fault

8.3.2 FRT Enable On


The parameter when FRT Enable is on is as follows.

Parameters Min Max Unit Descriptions


FRT Enable 0 1 - FRT(Fault Ride Through) Function
0: Disable
1: Enable
Grid Under Voltage 15 100 % Lower limit expressed as a percentage of the
Level 2 rated grid voltage for grid under voltage Level 2
Grid Under Voltage 100 10000 ms Time for grid under voltage level 1 trip
Level 1 Trip Time
Grid Under Voltage 40 3000 ms Time for grid under voltage level 2 trip
Level 2 Trip Time
MPP Range Upper 10 300 Vdc Upper limit of maximum power point
MPP Range Lower 10 300 Vdc Lower limit of maximum power point

Table 15: FRT Enable On

Page 68 Operating Instructions Powador XP500/550-OD-TL


Param eter s

Grid Under Voltage

Figure 44: Grid under voltage

1. U > 1.1*Urated, t > 2s  Grid Under Voltage Level 1 Fault


2. U > 1.2*Urated, t > 150ms  Grid Under Voltage Level 2 Fault

8.3.3 Frequency Dependant Power Reduction Enable On

Grid Over Frequency

Figure 45: Grid over frequency

Operating Instructions Powador XP500/550-OD-TL Page 69


Parameters

Figure 46: Power reduction gradient level

PM: Instantaneously Available Power


ΔP: Power Reduction (Power Reduction Gradient Level)

This function controls active power which is proportional to Grid frequency increase. As you can see in the pic-
ture, active power need to be restricted if grid frequency is over 50.2Hz. PM (Instantaneously available power)
decreases with 40%/Hz slope and it can be restorable if grid frequency is less than 50.05Hz.

8.3.4 Power Gradient Enable On

Figure 47: PV gradient graph

This function is for PV inverter re-generation. Inverter need to generate active power slowly with specific slope
when its operation stops due to various reasons. In this case, active power supply cannot be over 10% of rated
active power per minute.

Page 70 Operating Instructions Powador XP500/550-OD-TL


Param eter s

8.4 Time Parameters


Parameters Min Max Descriptions
Year 2000 3000 The present year
Month 1 12 The present month
Day 1 31 The present date
Time 0 23 The present hour
Minute 0 59 The present minute
Second 0 59 The present second

Table 16: Time Parameters

8.5 Digital Parameters


Parameters Min Max Unit Descriptions
DI1 Select 0 20 N/A DI1(Digital Input) selection
0: Disable DI1
1: Reserved
2: Reserved
3: Start/Stop operation of the inverter by DI1
(Recognition pattern: 1sec – Stop, 2sec – Start)
4: Start/Stop operation of the inverter by DI1
(Recognition pattern: 200msec – Stop, 400msec
– Start)
5: Stop operation of the inverter by DI1(Inverter
turn off when DI1 signal over {DI1 Check Period}
msec
DO1 Select 0 20 N/A DO1(Digital output) selection
0: Fault state is output to DO1
RPC Mode Select 0 2 N/A The COSPHI control function of the XP-Series
Inverter operates when this parameter is 2.
0: Disable
2: Enable
Power Meter 0 99999999 kWh PV generation amount check
RS485 Protocol 0 999 - RS485 communications’ protocol
0: ACI protocol
1: Communication with prolog
2: Communication with PVI-go
RS485 ID 0 999 - ID for RS485 communication
CAN ID 0 999 - ID for CAN communication

Table 17: Digital Parameters

Operating Instructions Powador XP500/550-OD-TL Page 71


Parameters

Parameters Min Max Unit Descriptions


Argus Box 1 0 99999 - Argus Box 1 address and type setup
Address
Argus Box 2 0 99999 - Argus Box 2 address and type setup
Address
Argus Box 3 0 99999 - Argus Box 3 address and type setup
Address
Argus Box 4 0 99999 - Argus Box 4 address and type setup
Address
Argus Box 5 0 99999 - Argus Box 5 address and type setup
Address
Argus Box 6 0 99999 - Argus Box 6 address and type setup
Address
Argus Box 7 0 99999 - Argus Box 7 address and type setup
Address
Argus Box 8 0 99999 - Argus Box 8 address and type setup
Address
Prolog Positive 0 1 - Provide positive sequence for grid voltage as
Sequence Enable prolog
Prolog Expanded 0 1 - Provide expanded total yield to Prolog
Total Yield
DI1 Check Period 200 5000 msec Required time for inverter turn off when selecting
{DI1 Select} parameter to ‘5’

Table 17: Digital Parameters

8.6 Analog Parameters


Parameters Min Max Descriptions
AI1 OffSet -300 300 AI (Analog Input) 1 offset
AI1 Gain -300 300 AI (Analog Input) 1 gain
AI2 OffSet -300 300 AI (Analog Input) 2 offset
AI2 Gain -300 300 AI (Analog Input) 2 gain
AI3 OffSet -300 300 AI (Analog Input) 3 offset
AI3 Gain -300 300 AI (Analog Input) 3 gain
AI4 OffSet -300 300 AI (Analog Input) 4 offset
AI4 Gain -300 300 AI (Analog Input) 4 gain

Table 18: Analog Parameters

Page 72 Operating Instructions Powador XP500/550-OD-TL


Param eter s

8.7 Controller Parameters


Parameters Min Max Unit Parameters
VC P Gain 0 999.99 N/A PV voltage controller’s P Gain
VC I Gain 0 999.99 N/A PV voltage controller’s I Gain
Voltage Detection 0 9999 Hz Grid Voltage and Inverter voltage filter of dq axis
LPF
CC P Gain 0 999.99 N/A Inverter output current controller’s P Gain
CC I Gain 0 999.99 N/A Inverter output current controller’s I Gain
CC di/dt 1 9999 p.u. Slope of inverter rated current generation
Ramp 0 99999 msec Slope of PV voltage generation(time for 100V
change)
Li 0 99999 uH Inductance value of inverter output LC filter
Vdc Reference 0 999.9 Vdc DC voltage reference when it is not in MPPT range
CC Period 100 400 usec Inverter switching frequency
PLL P Gain 0 999.99 N/A Grid voltage PLL’s P Gain
PLL I Gain 0 999.99 N/A Grid voltage PLL’s I Gain
Auto Fault Reset 0 20 times The maximum count of auto reset function
Count
Heatsink OT Level 50 150 °C The maximum value of PEBB temperature
Power Compensa- 0 1 - Power compensation for MPPT control
tion
Test mode 0 99999 N/A The value for function test mode
Options 0 99999 N/A Outside option board setup
Deviation Tolerance 1 25 20msec Level 1 trip time use when level 2 protection
Time disable
Reactive Power -30 30 % The control value for reactive power degree of
accuracy
Variable MPP Vmin 0 1 - The setup value for inverter operation rage
Enb maximization
T_CLOUD 0 3600 sec Time for declines of PV generation due to cloud
T_CLOUD_CNT 0 20 times Count for declines of PV generation due to cloud
Remote Power 0 100 % Inverter active power which can be controlled
Control from outside device
PEBB2 Temperature 0 150 °C PEBB2 temperature(Read only)
PEBB3 Temperature 0 150 °C PEBB3 temperature(Read only)
Current Unbalance 0 100 % Unbalanced current level
Limit

Table 19: Controller Parameters

Operating Instructions Powador XP500/550-OD-TL Page 73


Parameters

Parameters Min Max Unit Parameters


Cabinet FAN PWM 0 100 - Reserved
Remote Power 0 600 sec The slope of inverter output active poser when
Control Ramp remote power is controlled
Total Yield 0 99999999 kWh Check total yield of generation(Read only)
Today Yield 0 99999999 kWh Check day yield of generation(Read only)
CTRL_RSV1 0 999.99 - Reserved
CTRL_RSV2 0 999.99 - Reserved
CTRL_RSV3 0 999.99 - Reserved
CTRL_RSV4 0 999.99 - Reserved
Anti-Islanding 0 1 - The use of anti-islanding controller, Yes(1) NO(0)
Enable
APS Line Deadband 0 999.99 - The setup value for anti-islanding control
Reactive Power 0 999.99 - The setup value for anti-islanding control
Limit
Wind Speed 0 9999.9 - Reserved
Power Derating 0 1 - The use of power decline controller according to
Enable PEBB temperature, Yes(1) NO(0)
Power Derating 50 100 - Temperature level which starts decreasing power
Enable Temperature according to PEBB temperature
Power Derating 40 90 - Temperature level which stops decreasing power
Disable Temperature according to PEBB temperature
Power Derating 45 95 - PEBB temperature reference value
Reference Tempera-
ture
Power Derating P 0 10 - Power declining controller’s P gain according to
Gain PEBB temperature
Grid IIR Filter Cutoff 0 10 Hz Filter cutoff frequency used for RMS value detec-
Frequency tion of grid voltage
Asynchronous Fault 0 100 - Reserved
Count
Asynchronous Fault 0 1 - Reserved
Enable
Grid Positive 0 999.9 V Positive sequence value of grid
Sequence

Table 19: Controller Parameters

Page 74 Operating Instructions Powador XP500/550-OD-TL


Param eter s

Parameters Min Max Unit Parameters


COSPHI Control 0 5 - Reactive power supply method in Internal mode
Mode and RPC mode
0: disabled
1: fixed P
2: fixed cos
3: fixed Q
4: Cos(P/Pn)
5: Q(U)
COSPHI Power -1 1 - Power factor reference in internal mode
Factor Internal
COSPHI Reactive -99.9 99.9 % Reactive power reference in internal mode
Power Internal (Percent for rated one)
COSPHI Power -1 1 - The actual power factor value that is applied
Factor Actual (Read only)
COSPHI Power -1 1 - Power factor reference in RPC mode
Factor RPC
COSPHI Reactive -99.9 99.9 % Reactive power reference in RPC mode
Power RPC (percent for rated one)
COSPHI Stray Ratio 0 2 The setup value for COSPHI control
Positive Sequence 0 1 - The use of grid voltage of positive sequence at PLL
PLL Enable
FRT K Factor 0 10 - The setup constant during FRT control
FRT IQ Ramp 0 99999 msec The slope of active power supply during FRT
control
FRT IQ Ramp Time 0 99999 msec The time that use a slope changed by FRT IQ ramp
parameter
Positive Sequence 0 100 Hz The cutoff frequency for RMS value of positive
LPF sequence
PLL Freq LPF 0 100 Hz The cutoff frequency for frequency value detec-
tion of PLL
Q(V) Control Target 208 440 V Value of Q(V) Control Target Voltage
Voltage
Q(V) Control K 0 50 - A setup constant for voltage control of BDEW
Factor
Q(V) Control 0 100 % Non-applicable voltage range during voltage
Deadband control of BDEW
Q(V) Control Ramp 0 99999 sec The slope of reactive current increase during
Time voltage control of BDEW

Table 19: Controller Parameters

Operating Instructions Powador XP500/550-OD-TL Page 75


Parameters

Parameters Min Max Unit Parameters


FRT Asynchronous 0 100 V The voltage level in order to separate Asynchro-
Level nous and synchronous. Inverter will recognize as
Asynchronous if the difference between inverter
sensing output voltage and RMS value of positive
value is less then this parameter level
COSPHI (P/Pn) Ramp 0 99999 sec The slope setup value for PF’s answering time in
Time Cos(P/Pn)
COSPHI_1 -1 1 - The variable power factor reference according to
active power P_1
P1 0 100 % The active power setup conference for COSPHI_1
COSPHI_2 -1 1 - The variable power factor reference according to
active power P_2
P2 0 100 % The active power setup conference for COSPHI_2
COSPHI_3 -1 1 - The variable power factor reference according to
active power P_3
P3 0 100 % The active power setup conference for COSPHI_3
COSPHI_4 -1 1 - The variable power factor reference according to
active power P_4
P4 0 100 % The active power setup conference for COSPHI_4
COSPHI_5 -1 1 - The variable power factor reference according to
active power P_5
P5 0 100 % The active power setup conference for COSPHI_5
COSPHI_6 -1 1 - The variable power factor reference according to
active power P_6
P6 0 100 % The active power setup conference for COSPHI_6
COSPHI_7 -1 1 - The variable power factor Reference according to
active power P_7
P7 0 100 % The active power setup conference for COSPHI_7
COSPHI_8 -1 1 - The variable power factor reference according to
active power P_8
P8 0 100 % The active power setup conference for COSPHI_8
COSPHI_9 -1 1 - The variable power factor reference according to
active power P_9
P9 0 100 % The active power setup conference for COSPHI_9
COSPHI_10 -1 1 - The variable power factor Reference according to
active power P_10
P10 0 100 % The active power setup conference for COSPHI_10
CTRL_RSV5 0 9999 msec Reserved
CTRL_RSV6 0 9999 msec Reserved

Table 19: Controller Parameters

Page 76 Operating Instructions Powador XP500/550-OD-TL


Param eter s

Parameters Min Max Unit Parameters


CTRL_RSV7 0 999.99 - Reserved
CTRL_RSV8 0 999.99 - Reserved
CTRL_RSV9 1 20 degree Reserved
FRT Overcurrent 0 5000 msec The power generation is stopped for this param-
Protection Time eter value after fault clear in FRT situation

Table 19: Controller Parameters

8.7.1 Anti-Islanding Enable


With activation of Anti-Islanding function, XP-HV and XP-TL series will detect and disconnect itself from the
grid within a few second. If the Anti-Islanding function is not activated, XP-HV and XP-TL cannot disconnect
itself from the grid during grid failure, and generate power to load independently. For example, when inverter
infuse 500kW power to gird with 500kW load connected to PCC (Point of Common Coupling), inverter can
generate output voltage independently during grid failure, and operate itself with bearing 500kW load.

8.7.2 Power Derating

Figure 48: Block Diagram of Power Derating

Figure 49: Decreasing rate

Operating Instructions Powador XP500/550-OD-TL Page 77


Parameters

Figure 50: State Machine

Power derating is enabled or disabled by an output of state machine which is decided by 4 inputs. And while
the output of state machine is 1, a decreasing rate affects an output power.
A decreasing rate is calculated by multiplying factor K({Power Derating P Gain}) and a difference between refer-
ence temperature({Power Derating Reference Temperature}) and PEBB heatsink temperature}.
An output of state machine depends on the state in which state machine is running. A transfer between states
happens when defined conditions are satisfied. Basically, if {Power Derating Enable} is 0, the state is “Disable”.
And If {Power Derating Enable} is 1, transfer is done according to PEBB heatsink temperature.
Following examples show power derating by default parameter.
Descriptions for sections of Example of Power Derating are:

T1: Inverter produces energy and PEBB temperature rises.


T2: When PEBB temperature is higher than 90°C, power derating is activated. And inverter controls output
power according to expression, P(%) = 100 -(TPEBB -80)x2 until power derating is deactivated.
T3: Output power decrease and PEBB temperature drops. When PEBB temperature is lower than 70°C, power
derating is deactivated. And inverter doesn’t decrease output power.

Page 78 Operating Instructions Powador XP500/550-OD-TL


Param eter s

8.7.3 Example of Power Derating

Figure 51: Concept of XP series Power Derating

Operating Instructions Powador XP500/550-OD-TL Page 79


Parameters

8.7.4 Conceptual Relation between Output Power and Temperature


Below graph represents conceptual relation between inverter output power and heat sink temperature. The
output power is reduced in proportion to heat sink temperature but keep in mind that the power derating is
activated at 90°C and deactivated at 70°C (The activation/deactivation temperature can be tunable by param-
eter).

Figure 52: Relation between output power and temperature

8.7.5 COSPHI Control


COSPHI Control function is for controlling active and reactive power which is infused from XP inverter to the
grid with Prolog, HMI, and XCU at long distance.

Figure 53: COSPHI Control composition

Page 80 Operating Instructions Powador XP500/550-OD-TL


Param eter s

8.7.6 COSPHI Control Mode


COSPHI control operates with five reactive and active power control ways according to {COSPHI Control Mode}
setting.

No. Power control Description Relative Parameters


1 Fixed P Control the maximum active power with {Remote {Remote Power Control}
Power Control} parameter value(% of max rated
power).
2 Fixed COSPHI Control the maximum active power with {Remote {Remote Power Control}
Power Control} parameter value(% of max rated {COSPHI Internal Power
power). Control power factor with parameter value of Factor}
{COSPHI Internal Power Factor} or {COSPHI RPC Power
{COSPHI RPC Power Factor}
Factor} according to present RPC status.
3 Fixed Q Control the maximum active power with {Remote {Remote Power Control}
Power Control} parameter value(% of max rated {COSPHI Internal Reactive
power). Control reactive power with parameter value Power}
of {COSPHI Internal Reactive Power} or {COSPHI RPC
{COSPHI RPC Reactive
Reactive Power} according to the present RPC status.
Power}
4 COSPHI(P/Pn) Control power factor to match the graph of maximum {COSPHI_n}, {P_n}
10 continuous {COSPHI_n} and {P_n} pairs. (n = 1~10)
{COSPHI (P/Pn) {Ramp Time}
5 Q(V) Control reactive power infusion from inverter to grid {Q(V) Control Deadband}
when grid voltage is between rated range. The grid {Q(V) Control K Factor}
voltage range where Q(V) function is possible is
{Q(V) Control Ramp Time}
determined by {Q(V) Control Deadband} and {Q(V)
Control K Factor}.

Table 20: COSPHI Control Mode

8.7.7 Communication between Components


COSPHI Control enables remote control of reactive and active power by setting reference of reactive and active
power by communication between Prolog, HMI, and XCU. Here are the communication methods between
each component.
1. User activates COSPHI Control by Prolog.
2. Prolog sends a COSPHI Control massage at two-minute intervals.
3. HMI interprets the COSPHI Control message from Prolog to modify parameters of XCU.
4. XCU operates according to the modified parameter by HMI.
5. COSPHI (limited to Fixed COSPHI and Fixed Q) has two overlapping parameters for RPC and Internal modes,
and HMI modifies the parameter for RPC mode only. If the relative RPC mode parameter is not modified
longer than five minutes, XCU will operate according to the parameter for internal mode.

Operating Instructions Powador XP500/550-OD-TL Page 81


Parameters

Figure 54: The communication Sequence between COSPHI Components

Page 82 Operating Instructions Powador XP500/550-OD-TL


Param eter s

8.7.8 Operation Mode


COSPHI Control operates in RPC (Remote Power Control) and internal modes according to communication
status to control power with Fixed COSPHI and Fixed Q.

Figure 55: Transition of RPC mode and Internal Mode

1. RPC mode
While HMI is modifying XCU’s {Remote Power Control}, {COSPHI RPC Reactive Power} and {COSPHI RPC
Power Factor} parameters with two-minute interval, COSPHI Control operates in RPC mode. In RPC mode,
it operates according to {Remote Power Control}, {COSPHI RPC Reactive Power}, and {COSPHI RPC Power
Factor} modes.
2. Internal mode
If RPC mode parameter such as {Remote Power Control}, {COSPHI RPC Reactive Power}, and {COSPHI RPC
Power Factor} is not be modified within five minutes, XCU will operate in Internal mode. In Internal mode,
COSPHI control operates according to internal mode parameters such as {COSPHI Internal Reactive Power}
and {COSPHI Internal Power Factor}, {Remote Power Control} parameter does not influence on the active
power.

Operating Instructions Powador XP500/550-OD-TL Page 83


Parameters

Figure 56: PQ Diagram of XP500-OD-TL

Output power limit is based on apparent power which is 111% of the rated power. In other words, where the
apparent power is over the rated power, active/reactive power is reduced at same rate respectively so that the
final output power does not exceed 111% of the rted power.
PQ diagram above shows that the reactive power is from 0 to 242kVAR according to the power factor which is
from 1 to 0.9, the active power is up to 500kW and active/reactive power is not limited because the final output
apparent power is not over 555kVA (111% of the rated power). And because the apparent power is over
555kVA where power factor is less than 0.9 the active/reactive power is reduced.

Figure 57: PQ Diagram of XP550-OD-TL

Output power limit is based on apparent power which is 101% of the rated power. In other words, where the
apparent power is over the rated power caused by reducing power factor, active/reactive power is reduced at
same rate respectively so that the final output power does not exceed 101% of the rated power.
When changing the power factor from 1 to 0.9, the active power is down to 500kW and the reactive power
will be up from 0 to 242kVAR since the final output apparent power should be remained at 555kVA (101% of
rated power). In case of power factor is 1.0, the output power is 550kW (550kVA).

Page 84 Operating Instructions Powador XP500/550-OD-TL


Param eter s

8.7.9 The Relationship of Reactive Power and Active Power


While active and reactive power is set to exceed maximum complex power (1.11PRated) by parameter setting,
COSPHI Control reduces active power, and control reactive power by parameter setting.

8.7.10 Cos (P/Pn)


The Cos (P/Pn) function allows inverter to send changeable PF (power factor) according to the active power to
grid. The maximum setup point of both PF and active power is 10 points and the maximum required value of
PF for Cos (P/Pn) is 0.9 in German market. XP-HV and XP-TL series can also operate with maximum PF, which
is 0.9, and its transient time is 10sec.

Figure 58: Active Power - Power Factor Graph

Operating Instructions Powador XP500/550-OD-TL Page 85


Parameters

8.7.11 FRT Control

Figure 59: Control Grid Voltage during Inverter Failure (FRT K Factor=2)

Figure 60: 0% Drop of Grid Voltage 0%

Page 86 Operating Instructions Powador XP500/550-OD-TL


Param eter s

Figure 61: Grid Voltage 60% Drop

The above graphs show the change of electrical values during FRT (Fault Ride Through) control, and the detailed
description for each section is as follows.

Section 1
• If Grid Voltage drops below standard FRT value (0.9P.U) set by parameter, inverter will convert its mode to
FRT.
• The occurrence of Over Current is decided by the slope and depth, and if when over current occurs, inverter
will stop PWM Modulation for one cycle.
• Inverter will infuse the reactive power to grid according to parameter setting.
• Since the reactive power value is proportional to the parameter setting value, you can infuse reactive power
to grid as much as possible.

Section 2
• Infuse active power and reactive power to grid according to parameter setting.

Section 3
• The occurrence of Over Current is decided by the slope and depth, and if when over current occurs, inverter
will stop PWM Modulation for one cycle.
• Infuse active power and reactive power to grid according to parameter setting.

Section 4
• If Grid voltage rises above standard FRT value (0.9P.U) set by parameter, inverter will convert its mode to
normal and stop reactive current infusion.

Operating Instructions Powador XP500/550-OD-TL Page 87


Parameters

The operation for FRT (Fault Ride Through) control is possible to set by parameter as follows.

• Grid Under Voltage Levels


- Grid Under Voltage Level 1 – Transfer to FRT mode.
- Grid Under Voltage Level2 – Inverter stops its operation with ‘Grid Under Voltage Level 2 Fault’ when the
grid voltage below ‘Grid Under Voltage Level 2’ sustains over “Grid Under Voltage Trip Time 2”.
- Grid Under Voltage Trip Time 1 – Permissible grid voltage under ‘Grid under Voltage Level 1’ time.
- Grid Under Voltage Trip Time 2 – Permissible grid voltage under ‘Grid Under Voltage Level 2’ time.

Figure 62: FRT Parameters

Page 88 Operating Instructions Powador XP500/550-OD-TL


Param eter s

8.7.12 Q(V) Control

Figure 63: Grid Voltage Control during Q(V) Control Enable

As you can see in the above picture, this Q(V) Control function is for the reactive power infusion even if grid is
in normal range(90~110%). Dead band rage is UTarget±1%.
Here, you can calculate slope K Factor for Q(U) Control using an equation ΔQ/ΔU=K Factor, and the variables
which are ΔQ=cos(Phi)=0.95, Phi=18.2° and sin(Phi)=0.31. ΔU is the voltage difference between the measured
voltage and the specified parameter target voltage as a p.u. Therefore, you can decide slope k factor. For
example, if you want to infuse ΔQ at UTarget±5% range and UTarget=UN, the K value would be calculated as
0.31/0.05=6.2. The rage of ΔU is calculated from the end of the dead band.

Operating Instructions Powador XP500/550-OD-TL Page 89


User interf ace

9 User interface

2 3 4

5 6

Figure 64: Connecting the user interface

Key
1 User interface 4 UAI (User analog input)
2 UDIO (User digital input/output) 5 Ethernet
3 RS485 6 CAN

NOTE
The digital, analogue, RS485 and Ethernet connections are designed for SELV.
Only external SELV circuits are permitted to be connected to the SELV circuits
(user interface) of the inverter.

Page 90 Operating Instructions Powador XP500/550-OD-TL


User interface

9.1 Digital input/output


9.1.1 Digital input

1c 2c 3c 4c 5c

UDIO
1d 2d 3d 4d 5d

1c 2c 3c 4c 5c

1d 2d 3d 4d 5d

Figure 65: UDIO connection Figure 66: UDI1 connection

Terminal number Terminal designation Specification Wire cross-section


1c UDI1 P AWG 20
Max 27Vdc, 27mA
1d UDI1 N (0.518mm2)

Table 21: Connections for digital input

The system sends digital input signal in accordance with the setting of “DI1 Select” parameter in menu of HMI
or parameter setup tool (CMT, AutoSetup).

DI1 Select Description Note


0 Disable DI1
1 Reserved
2 Reserved
3 Start/Stop operation of the inverter by DI1
Recognition pattern:
Stop: Δt = 1sec
Start: Δt = 2sec
Recognition pattern is checked whene-
4 Start/Stop operation of the inverter by DI1 ver DI1 input signal is at rising edge(T0)
Recognition pattern: then it is determined according to how
Stop: Δt = 200msec long the DI1 input signal has been
stayed in high state.
Start: Δt = 400msec
5 Stop operation of the inverter by DI1
Recognition pattern:
{DI1 Check Period} msec – Stop operation

Operating Instructions Powador XP500/550-OD-TL Page 91


User interf ace

Figure 67: DI1 input signal

NOTE
The {DI1 Check Period} is parameter in ‘8.5 Digital Parameters’ that mean recognition
pattern period for inverter stop operation when selecting ‘DI1 Select’ to ‘5’.

9.1.2 S0 input

1c 2c 3c 4c 5c
UDIO

1d 2d 3d 4d 5d

24Vdc
4.7 kΩ
0Vdc

Input signal

Figure 68: Connection for S0 input

Terminal number Terminal designation Specification Wire cross-section


2c S0in P AWG 20
Max 27Vdc, 27mA
2d S0in N (0.518mm2)

Table 22: Connections for S0 input

Page 92 Operating Instructions Powador XP500/550-OD-TL


User interface

9.1.3 S0 output

1c 2c 3c 4c 5c
UDIO

1d 2d 3d 4d 5d

24Vdc
4.7 kΩ
0Vdc

Output signal

Figure 69: Connection for S0 output

Terminal number Terminal designation Specification Wire cross-section


3c S0out P AWG 20
Max 27Vdc, 27mA
3d S0out N (0.518mm2)

Table 23: Connections for S0 output

9.1.4 Digital output

1c 2c 3c 4c 5c 1c 2c 3c 4c 5c
UDIO

UDIO

1d 2d 3d 4d 5d 1d 2d 3d 4d 5d

Figure 70: Connection for digital output Figure 71: Connection for digital output
(N/O contact) (N/C contact)

Terminal number Terminal designation Specification Wire cross-section


4c UDO1A Potential-free output
contact A
4d UDO1B Potential-free output
contact B AWG 20
(0.518mm2)
5c UDIO1C Potential-free, common
output contact
5d UDIO1D -

Table 24: Connections for digital user output

Operating Instructions Powador XP500/550-OD-TL Page 93


User interf ace

9.2 RS485 interface

The inverter has two RS485 connections.


RS485-1 Interface for the Powador Argus
Interface for optional Powador-go
RS485-2 Interface for the HMI’s internal data logger, or for the external Powador proLOG data logger

9.2.1 RS485-1 Interface

1c 2c 3c 4c PE 5c 6c 7c 8c
RS485

1d 2d 3d 4d PE 5d 6d 7d 8d

1c 2c 3c 4c 5c 6c 7c 8c
A B GND

Signal transceiver
1d 2d 3d 4d 5d 6d 7d 8d

Figure 72: RS485-1 connection Figure 73: Circuit diagram for RS485-1
connection

Terminal number Terminal designation Specification Wire cross-section


1c RS485 A1 RS485 signal A1
1d RS485 B1 RS485 signal B1
3c RS485 C1 Termination resistor AWG22
terminal (0.326mm2)

3d RS485 G1 RS485 data transmission


GND 1
 For termination disposal, you can use RS485 B1(1d) and RS485 C1(3c) with jumper because termination
resistor is already installed inside of XCU of XP500/550-OD-TL.

Table 25: Connections for RS485-1

Page 94 Operating Instructions Powador XP500/550-OD-TL


User interface

9.2.2 RS485-2 Interface

1c 2c 3c 4c PE 5c 6c 7c 8c

RS485
1d 2d 3d 4d PE 5d 6d 7d 8d

1c 2c 3c 4c 5c 6c 7c 8c
A B GND

Signal transceiver
1d 2d 3d 4d 5d 6d 7d 8d

Figure 74: RS485-2 connection Figure 75: Circuit diagram for RS485-2
connection

Terminal number Terminal designation Specification Wire cross-section


5c RS485 A2 RS485 signal A2
5d RS485 B2 RS485 signal B2
7c RS485 C2 Termination resistor AWG22
terminal (0.326mm2)

7d RS485 G2 RS485 data transmission


GND 2
 For termination disposal, you can use RS485 B2(5d) and RS485 C2(7c) with jumper because termina-
tion resistor is already installed inside of XCU of XP500/550-OD-TL .

Table 26: Connections for RS485-2

Operating Instructions Powador XP500/550-OD-TL Page 95


User interf ace

9.2.3 Settings for RS485 interfaces

ID Name Unit Default value Min. Max.


0 Activate Powador-proLOG - OFF OFF ON
1 HMI address - 0 0 31
2 Change Powador-go address - - - -
3 Activate Powador-go - OFF OFF ON
4 Diff. tolerance % 10 10 100
5 Fault trigger time minutes 120 10 240
6 Address 0 string number - 0 0 4
7 Address 1 string number - 0 0 4
8 Address 2 string number - 0 0 4
.. .. - 0 0 4
.. .. - 0 0 4
36 Address 30 string number - 0 0 4
37 Address 31 string number - 0 0 4

Table 27: RS485 interface settings

9.3 Analog input


The inverter has four analogue connections.
1c, 1d, 2c, 2d Solar sensor
3c, 3d Ambient temperature sensor
4c, 4d Wind speed sensor
Input range 0 ~ 10V

1c
1d Solar
Analogue

2c sensor
input

2d
3c Temperature
1c 2c 3c 4c
3d sensor
4c
Wind
4d speed
1d 2d 3d 4d
sensor

Figure 76: Analogue user input Figure 77: Connection diagram of the analogue
Interface

Page 96 Operating Instructions Powador XP500/550-OD-TL


User interface

9.3.1 Solar sensor

1c 2c 3c 4c

UAI
1d 2d 3d 4d

12 ... 24 Vdc
-
+

Red (rd) VCC (12~24Vdc)


Black (bk) GND
rd bk og bn
Orange (og) Irradiation (0~10V)
Brown (bn) Cell Temperature (0~10V)
Si-12TC - T

Figure 78: Si-12TC - T Solar sensor Figure 79: Connection diagram for solar sensor

Terminal number Terminal designation Specification Wire cross-section


1c IVP
0 to 10V
1d IVN AWG 24
2c CTP (0.205mm2)
0 to 10V
2d CTN

Table 28: Connections for analogue user input - Solar sensor

9.3.2 Ambient temperature sensor

1c 2c 3c 4c
UAI

1d 2d 3d 4d

12 ... 24 Vdc
-
+

Red (rd) VCC (12~24 Vdc)


rd bk bn Black (bk) GND
Brown (bn) Temperature (0~10V)
PT 1000

Figure 80: PT 1000 Ambient temperature Figure 81: Wiring of the PT 1000 ambient
sensor temperature sensor

Operating Instructions Powador XP500/550-OD-TL Page 97


User interf ace

9.3.3 Wind speed sensor

1c 2c 3c 4c

UAI
1d 2d 3d 4d

bk bn

Black (bk) GND


Brown (bn) Wind speed (0~10V)

Figure 82: Wind speed sensor Figure 83: Configuration of the wind speed sensor

Terminal number Terminal designation Specification Wire cross-section


3c PTP
0 to 10V
3d PTN AWG 24
4c RSVP (0.205mm2)
0 to 10V
4d RSVN

Table 29: Connections for analogue user input - PT 1000 ambient temperature sensor, wind speed sensor

9.3.4 Parameter settings for analogue sensors


IIn order to determine measured values using the analogue sensors, you have to set the “Options” parameter.
The options are calculated and set by a service technician from KACO new energy Inc.,.

ATTENTION
Be careful not to destroy the sensor's measuring input!
Avoid using voltages > 10V and make sure that the polarity is correct.

Page 98 Operating Instructions Powador XP500/550-OD-TL


Ov erv iew Cir cuit Diagr am

10 Overview Circuit Diagram

Figure 84: Configuration of the Powador XP500/P550-OD-TL

Operating Instructions Powador XP500/550-OD-TL Page 99


D eco m missioning/Dismant ling

11 Decommissioning/Dismantling
DANGER
Lethal voltages are still present in the terminals and lines of the inverter even after
the inverter has been switched off and disconnected!
Coming into contact with the lines and terminals in the inverter will cause serious
injury or death.
Only authorised electricians who are approved by the supply grid operator may open,
install and maintain the inverter.
› Always shut down the inverter (in the sequence described below) before dismantling
the unit.
› Do not touch exposed contact connections.

Switch off the inverter

 Switch the main ON/OFF switch to OFF (stop the inverter).


 Switch the power grid switch to OFF (disconnect the inverter from the grid).
 Switch the DC disconnector to OFF (disconnect the inverter from the PV generator).
 Make sure that the inverter is disconnected from all voltage sources.
 Attach locking devices to the circuit breaker of the power grid connection and to the AC and DC
disconnectors.
 Wait at least six minutes before working on the inverter.

Decommission and dismantle the inverter

 Disconnect all terminals and cable fittings.


 Remove all DC and AC leads.
 Disconnect the connections and bus bars between the cabinets.

Page 100 Operating Instructions Powador XP500/550-OD-TL


D isp o sal

12 Disposal
Dispose of the packaging materials

The packaging for the inverter consists of a wooden pallet, plastic foil made of polypropylene, and the
shipping container.

 Dispose of the packaging materials in accordance with the applicable waste disposal regulations.

Dispose of the inverter

 After the inverter has reached the end of its service life, dispose of it in accordance with the applicable
disposal regulations for electronic waste at your own expense or ask it to Kaco new energy Inc.,

Operating Instructions Powador XP500/550-OD-TL Page 101


The text and figures reflect the current technical state at the time of printing. Subject to technical changes. Errors and omissions excepted.

Carl-Zeiss-Straße 1 · 74172 Neckarsulm · Germany · Tel. +49 7132 3818-0 · Fax +49 7132 3818-703 · info@kaco-newenergy.de · www.kaco-newenergy.com

You might also like