HULAS INFRA LIMITED

WEEKLY CHECKLIST

Hydraullic Power Pack(Oil Level)


HIIL/FT/MM/00/02
OIL LEVEL (MM) OIL LEVEL (MM)
S.NO. EQUIPMENT S.NO. EQUIPMENT
Max. Min. level Max. Min. level
1 PUNCH PRESS M/C 15 A/P-1
a) RIGHT SIDE 400 280 a) Uncoiler 380 170
b) LEFT SIDE 400 280 b) Recoiler 400 230
c) Dancing roll(entry side) 250 100
2 ARGE M/C 210 130 d) Dancing roll(exit side) 250 100

3 ANGLE FORMING M/C 230 190 16 BA-1


a) Uncoiler 410 280
4 ANGLE PUNCH PRESS 230 190 b) Edge Guide 220 120
c) Entry Coil Car 220 150
5
17 BA-2
a) Uncoiler 440 250
b) Recoiler 440 255

14 BA-3
a) Uncoiler 410 300
4 Skin pass Mill 730 350 b) Recoiler 440 300
5 Slitter 25" 300 200 c) Entry EMG 210 200
6 Slitter 24" 350 200 d) Exit EMG 300 210
7 Slitter 12" 200 100 e) Entry Coil Car 370 270
8 Slitter 8" 200 100 f) Exit Coil Car 380 280
9 Inspection Line 400 200
10 Deburring Line 1 300 130 20 Grinding Machine
11 Deburring Line 2 300 130 a) Micromatic GCE 350 200 180
12 Ramp 250 110 b) Micromatic GCE 260 200 180
c) H.M.T G17P 250 220
13 Degreasing Line 1 d) H.M.T K130 500U 250 220
a) Uncoiler 440 230 e) H.M.T K130 800U 250 220