1 Load calculations 3
2 Slab Design 4
3 Beam Design 9
4 Column Design 12
5 Footing Design 13
LOAD CALCULATION
DEAD LOAD:
LIVE LOAD:
EARTHQUAKE:
3
TWO WAY SLAB DESIGN-STAFF QUARTER-H TYPICAL TWOWAY SLAB
.
Concrete grade fck = M25
Steel grade fy = Fe500 N/mm2
Thickness of slab = 150 mm
Longer span ly = 4.022 m Nominal cover = 20 mm
Shorter span lx = 3.23 m Eff. depth in x direction, dx = 126 mm
Ratio, ( ly / lx ) = 1.25 Eff. depth in y direction, dy = 118
4
TWO WAY SLAB DESIGN-STAFF QUARTER-H TYPICAL TWOWAY SLAB
.
Concrete grade fck = M25
Steel grade fy = Fe500 N/mm2
Thickness of slab = 150 mm
Longer span ly = 2.722 m Nominal cover = 20 mm
Shorter span lx = 2 m Eff. depth in x direction, dx = 126 mm
Ratio, ( ly / lx ) = 1.36 Eff. depth in y direction, dy = 118
5
TWO WAY SLAB DESIGN-STAFF QUARTER-H With Water tank
.
Concrete grade fck = M25
Steel grade fy = Fe500 N/mm2
Thickness of slab = 150 mm
Longer span ly = 1.73 m Nominal cover = 20 mm
Shorter span lx = 1.3 m Eff. depth in x direction, dx = 126 mm
Ratio, ( ly / lx ) = 1.33 Eff. depth in y direction, dy = 118
+ve -ve Case - 7 : Three Edges Discontinuous (One Long Edge Continuous)
ax 0.058 0.077 IS 456 , Table 26
ay 0.043 0.000
Mux 2.496 3.328 1730
Muy 1.853 0.000
Mux / bdx2 0.16 0.21
Muy / bdy2 0.13 0.00 T8 - 300c/c ETB.
pt,req x 0.120 0.120
1300
6
PROJECT :- STAFF QUARTER H
TITLE :- ONE WAY SLAB DESIGN
Ratio = Ly
Lx
2.4 >2
Mu 0.10
bd2
7
Ast require for short span
ptreq. = 0.02 %
ptmin = 0.12 %
pt = 0.12 %
Astreq = pt x b x d
100
2
Astreq = 151.2 mm
Astmin = 0.12 * B * D
2
180.00 mm
For, 8 mm φ bar
50.24 x 1000
Spacing req. =
180.00
Spacing = 279 mm
8
BEAM DESIGN-STAFF QUARTER H
BEAM
STAAD REINFORCEMENT STIRRUPS
LENGTH*
BEAM
WIDTH *
No. TOP / BOTTOM DIA. / SPACING / LEGGED
DEPTH
1001 4022 8d 8d 8d 8d 8d
230 315.35 228.53 78.84 228.53 300.1 70 140 140 140 70
450 157.67 228.53 228.53 228.53 150.05 2 2 2 2 2
1002 3222 8d 8d 8d 8d 8d
230 228.53 66.09 66.09 228.53 264.37 70 70 140 70 70
450 228.53 228.53 228.53 228.53 132.19 2 2 2 2 2
1003 1300 8d 8d 8d 8d 8d
230 364.27 228.53 228.53 91.07 91.07 70 70 70 70 70
450 182.13 91.07 228.53 228.53 228.53 2 2 2 2 2
1004 2722 8d 8d 8d 8d 8d
230 89.11 89.11 89.11 228.53 356.44 70 70 140 70 70
450 250.97 228.53 228.53 228.53 178.22 2 2 2 2 2
1005 1300 8d 8d 8d 8d 8d
230 444.44 286.35 228.53 228.53 228.53 70 70 70 70 70
450 222.22 111.11 228.53 228.53 228.53 2 2 2 2 2
1006 2722 8d 8d 8d 8d 8d
230 228.53 57.13 57.13 57.13 228.53 70 70 140 70 70
450 228.53 247.66 270.23 228.53 228.53 2 2 2 2 2
1007 1692 8d 8d 8d 8d 8d
230 549.05 316.54 228.53 137.26 137.26 70 70 140 70 70
450 274.53 137.26 137.26 228.53 241.95 2 2 2 2 2
1008 1030 8d 8d 8d 8d 8d
230 228.53 291.04 406.03 549.12 732.96 120 70 110 110 100
450 228.53 228.53 183.24 183.24 366.48 2 2 2 2 2
1009 1684 8d 8d 8d 8d 8d
230 118.17 118.17 228.53 239.38 472.68 70 70 140 70 70
450 300.14 228.53 228.53 118.17 236.34 2 2 2 2 2
1010 1538 8d 8d 8d 8d 8d
230 0 0 0 0 0 70 70 70 70 70
450 228.53 228.53 247.7 268.2 276.03 2 2 2 2 2
1011 1300 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 70 70 70 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
1012 1030 8d 8d 8d 8d 8d
230 252.91 228.53 228.53 228.53 228.53 100 110 110 120 120
450 228.53 228.53 267.52 284.15 228.53 2 2 2 2 2
1013 3230 8d 8d 8d 8d 8d
230 230.27 228.53 62.44 228.53 249.75 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
1014 3230 8d 8d 8d 8d 8d
230 228.53 228.53 67.04 228.53 268.15 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
1015 1730 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
1016 2000 8d 8d 8d 8d 8d
230 57.13 57.13 57.13 57.13 228.53 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
1017 900 8d 8d 8d 8d 8d
230 290.02 228.53 228.53 228.53 228.53 130 140 140 140 140
450 145.01 72.5 228.53 228.53 228.53 2 2 2 2 2
1018 585 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 140 140 140 140 140
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
1019 1145 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 57.13 57.13 70 70 70 70 70
450 114.26 228.53 228.53 228.53 251.45 2 2 2 2 2
1020 2130 8d 8d 8d 8d 8d
230 228.53 228.53 57.13 57.13 228.53 70 70 70 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
1021 1485 8d 8d 8d 8d 8d
230 59.93 59.93 228.53 228.53 239.71 70 70 70 70 70
450 228.53 228.53 228.53 228.53 119.86 2 2 2 2 2
9
BEAM
STAAD REINFORCEMENT STIRRUPS
LENGTH*
BEAM
WIDTH *
No. TOP / BOTTOM DIA. / SPACING / LEGGED
DEPTH
1022 1200 8d 8d 8d 8d 8d
230 359.08 228.53 228.53 89.77 89.77 70 70 70 70 70
450 179.54 89.77 228.53 228.53 228.53 2 2 2 2 2
1023 2030 8d 8d 8d 8d 8d
230 69.72 69.72 228.53 228.53 278.9 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
1024 2000 8d 8d 8d 8d 8d
230 132.05 228.53 228.53 323.3 528.2 70 70 100 70 70
450 331.3 229.31 228.53 132.05 264.1 2 2 2 2 2
1025 1145 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 70 70 70 70 70
450 228.53 228.53 228.53 255.76 279.73 2 2 2 2 2
1026 3615 8d 8d 8d 8d 8d
230 412.42 228.53 103.11 103.11 228.53 70 140 140 140 70
450 206.21 228.53 228.53 228.53 228.53 2 2 2 2 2
1027 4345 8d 8d 8d 8d 8d
230 295.79 85.69 85.69 228.53 342.75 70 140 140 140 70
450 147.89 228.53 228.53 228.53 171.38 2 2 2 2 2
2001 4022 8d 8d 8d 8d 8d
230 244.68 228.53 61.17 228.53 232.36 70 140 140 140 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2002 3222 8d 8d 8d 8d 8d
230 228.53 57.13 57.13 228.53 228.53 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2003 1300 8d 8d 8d 8d 8d
230 238.38 228.53 228.53 59.59 59.59 70 70 70 70 70
450 119.19 228.53 228.53 228.53 228.53 2 2 2 2 2
2004 2722 8d 8d 8d 8d 8d
230 63.79 63.79 63.79 228.53 255.15 70 70 140 70 70
450 228.53 228.53 228.53 228.53 127.57 2 2 2 2 2
2005 1300 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 70 70 70 70 70
450 114.26 57.13 228.53 228.53 228.53 2 2 2 2 2
2006 2722 8d 8d 8d 8d 8d
230 228.53 228.53 57.13 228.53 228.53 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2007 1692 8d 8d 8d 8d 8d
230 483.55 265.27 228.53 120.89 120.89 70 70 140 70 70
450 241.77 120.89 120.89 228.53 279.13 2 2 2 2 2
2008 1030 8d 8d 8d 8d 8d
230 228.53 228.53 297.27 396.31 506.97 100 100 100 90 90
450 228.53 228.53 126.74 126.74 253.49 2 2 2 2 2
2009 1684 8d 8d 8d 8d 8d
230 77.67 77.67 228.53 228.53 310.67 70 70 140 70 70
450 301.44 228.53 228.53 77.67 155.34 2 2 2 2 2
2010 1538 8d 8d 8d 8d 8d
230 0 0 0 0 0 70 70 70 70 70
450 228.53 245.31 272.57 279.5 265.89 2 2 2 2 2
2011 1300 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 70 70 70 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2012 1030 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 140 140 140 140 140
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2013 3230 8d 8d 8d 8d 8d
230 269.93 269.93 67.48 269.93 269.93 70 70 160 70 70
525 269.93 269.93 269.93 269.93 269.93 2 2 2 2 2
2014 3230 8d 8d 8d 8d 8d
230 269.93 269.93 67.48 269.93 269.93 70 70 160 70 70
525 269.93 269.93 269.93 269.93 269.93 2 2 2 2 2
2015 1730 8d 8d 8d 8d 8d
230 269.93 269.93 269.93 269.93 269.93 70 70 70 70 70
525 269.93 269.93 269.93 269.93 269.93 2 2 2 2 2
2016 2000 8d 8d 8d 8d 8d
10
BEAM
STAAD REINFORCEMENT STIRRUPS
LENGTH*
BEAM
WIDTH *
No. TOP / BOTTOM DIA. / SPACING / LEGGED
DEPTH
230 228.53 57.13 57.13 57.13 228.53 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2017 900 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 140 140 140 140 140
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2018 585 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 140 140 140 140 140
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2019 1145 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 57.13 57.13 70 70 70 70 70
450 114.26 57.13 228.53 228.53 228.53 2 2 2 2 2
2020 2130 8d 8d 8d 8d 8d
230 228.53 228.53 57.13 57.13 57.13 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2021 1485 8d 8d 8d 8d 8d
230 57.13 57.13 228.53 228.53 228.53 70 70 70 70 70
450 228.53 228.53 228.53 228.53 114.26 2 2 2 2 2
2022 1200 8d 8d 8d 8d 8d
230 277.18 228.53 228.53 228.53 69.29 70 70 70 70 70
450 138.59 69.29 228.53 228.53 228.53 2 2 2 2 2
2023 2030 8d 8d 8d 8d 8d
230 57.13 57.13 228.53 228.53 228.53 70 70 140 70 70
450 228.53 228.53 228.53 228.53 228.53 2 2 2 2 2
2024 2000 8d 8d 8d 8d 8d
230 122.35 228.53 228.53 275.01 489.38 70 70 110 70 70
450 302.6 240.13 228.53 122.35 244.69 2 2 2 2 2
2025 1145 8d 8d 8d 8d 8d
230 228.53 228.53 228.53 228.53 228.53 70 70 70 70 70
450 228.53 228.53 228.53 229.27 247.32 2 2 2 2 2
2026 3615 8d 8d 8d 8d 8d
230 278.96 228.53 69.74 69.74 228.53 70 140 140 140 70
450 139.48 228.53 228.53 228.53 228.53 2 2 2 2 2
2027 4345 8d 8d 8d 8d 8d
230 269.93 67.48 67.48 67.48 269.93 70 160 160 160 70
525 269.93 269.93 269.93 269.93 134.96 2 2 2 2 2
11
COLUMN RESULT FROM STAAD PRO. STAFF QUARTER H
12
FOOTING DESIGN CALCULATIONS
Project Name : STAFF H
Client Name : A
Engineer Name : JMP
Design File : \\server\Vanumain\PROJECTS\2023-24\2023-24-13-
ENGINEERS GUILD\2023-13-ED2-ANALYSIS FILE\STAAF
QUARTER\STAFF QUARTER H\STAFF QUARTER H-
Footing-1.R1.rcdx
Analysis File : \server\Vanumain\PROJECTS\2023-24\2023-24-13-
ENGINEERS GUILD\2023-13-ED2-ANALYSIS FILE\STAAF
QUARTER\STAFF QUARTER H\STAFF QUARTER H.STD
Analysis Last : 25-12-2023 13:08:10
Modified
Definitions:
1. α = Coefficient of Thermal Expansion
2. ε1 = Strain at level considered, Calculated ignoring the
stiffening of the concrete in tension zone
3. εm = Average steel strain at level considered
4. ρact = Percentage steel provided
5. ρcrit = Percentage steel critical as per code
6. A = Plan area of footing base
7. Acr = Distance from the point considered to the surface of
the nearest longitudinal bar
8. AstPrv = Area of tensile reinforcement provided
9. Astrqd = Area of tensile reinforcement required
10. Asv = Area of shear reinforcement required
11. AsvPrv = Area of shear reinforcement provided
12. A1 = Bearing area of footing at slope of 1:2
13. A2 = C/s Area of column
14. B = Width of footing base
15. Beff = Effective width of footing
16. BoffB = Footing offset along B below column in plan
17. BoffT = Footing offset along B above column in plan
18. B1 = Width of sloped footing at top
19. ColOff = Column offset in sloped footing
20. D = Depth of footing
21. Deff = Effective Depth of footing
22. Df = Depth of founding layer
23. Dw = Ground water level
24. Ec = Modulus of elasticity of concrete
25. Es = Modulus of elasticity of steel
26. Foss = Safety factor against sliding
27. Fosu = Safety factor against uplift
28. Fst = Stress in steel
29. L = Length of footing base
13
30. Leff = Effective length of footing
31. LoffL = Footing offset along L on left side of column
32. LoffR = Footing offset along L on right side of column
33. L1 = Length of sloped footing at top
34. Mx = Bending Moment along column D
35. Mx' = Bending Moment along column D due to odd
shaped column
36. Mex = Eccentricity moment along column D
37. Mxx = Total Bending Moment along column D (Mx + Mx'
+ Mex)
38. My = Bending Moment along column B
39. My' = Bending Moment along column B due to odd
shaped column
40. Mey = Eccentricity moment along column B
41. Myy = Total Bending Moment along column B (My + My' +
Mey)
42. Muy = Factored moment along column B
43. Muy' = Factored Moment along column B due to odd
shaped column
44. Mux = Factored moment along column D
45. Mux' = Factored Moment along column D due to odd
shaped column
46. Netdown = Net downward load
47. OB = Maximum permissible offset on bottom side of
column in plan
48. OL = Maximum permissible offset on left side of column
in plan
49. OR = Maximum permissible offset on right side of
column in plan
50. OT = Maximum permissible offset on top side of column
in plan
51. P = Axial load for footing sizing
52. P1 = Soil pressure at corner 1
53. P2 = Soil pressure at corner 2
54. P3 = Soil pressure at corner 3
55. P4 = Soil pressure at corner 4
56. Pdelta = Column Load to be transferred by reinforcement
57. Pt = Calculated percentage tensile reinforcement
58. Pu = Factored axial load
59. q = Surcharge Load
60. sp = Spacing Between bars at outer most layer
61. SPu = Upward Soil Pressure
62. SPuL = Upward Soil Pressure from left
63. SPuR = Upward Soil Pressure from right
64. SPuB = Upward Soil Pressure from bottom
65. SPuT = Upward Soil Pressure from top
14
66. Tc = Design shear strength of concrete
67. Temp1 = Peak Hydration temperature
68. Temp2 = Seasonal Temperature Variations
69. Tv = Nominal shear stress
70. Vu = Design shear force
71. Vus = Strength of shear reinforcement
72. Vx = Shear along major axis
73. Vy = Shear along minor axis
74. Waterpr = Upward water pressure
75. Waterup = Upward force due to water
76. Wcr = Surface Crack Width
77. WFoot = Add. Wt. due to difference in concrete and soil
density
78. WFootc = Weight of footing and column with concrete density
79. WSoil = Weight of soil covering footing area
80. Zx = Section modulus of footing base along L
81. Zy = Section modulus of footing base along B
Code References:
IS 456
Parameter Reference
1. Ptmax : Cl. 26.5.2.1
2. Ptmin : Cl. 26.5.2.1
3. Pt : Cl. 38
4. Tc : Cl. 40.2.1
5. Tcmax : Cl. 40.2.3
6. Asv : Cl. 40.4
7. Min Shear Reinf : Cl. 26.5.1.6
8. Max Stirrup Spacing : Cl. 26.5.1.5
9. Punching Shear design : Cl. 31.6.3
10. Load transfer : Cl. 34.4
11. Ptnominal : Cl. 34.5.2
12. Crack width calculation : Annex-F
13. Cracking : Cl. 35.3.2
15
: IS 456 : 2000 + IS 13920 : 2016
Design Code
Footing No : FC1
Column No : C1,C2,C11,C12 ( 300 mm X 450 mm)
Analysis No : 1,2,29,30
16
P = 201.81 kN
Mx = -22.23 kNm
My = 5.67 kNm
P/A = 146.77 kN/sqm
Mx/Zx = -77.6 kN/sqm
My/Zy = 22.51 kN/sqm
Maximum Soil Pressure = 246.88 kN/sqm
Allowable Soil Pressure = (1.5 X 280) + 36 kN/sqm
= 456 kN/sqm
Deff = 292 mm
Beff = 1100 mm
SPu = 309.55 kN/sqm
Mu = SPu X B X Loff X Loff / 2
17
= 27.24 kNm
Pt = 0.144 %
Ast Rqd (BM) = 462 sqmm
Ast Prv (Distributed Across Total = 9 - T10 @ 150
Width)
= 707 sqmm
Deff = 276 mm
Leff = 1250 mm
SPu = 309.55 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 30.96 kNm
Pt = 0.152 %
Ast Rqd (BM) = 525 sqmm
Ast Prv (Distributed Across Total
= 10 - T10 @ 150
Length)
= 785 sqmm
18
Deff = 292 mm
Beff = 1100 mm
SPu = 309.55 kN/sqm
Vu = SPu X (Loff - d) X B
= 36.77 kN
Tv = Vu / (Beff X Deff)
= 0.11 N/sqmm
Tc = 0.29 N/sqmm
Tv < Tc
= 276 mm
Critical Column No = C12
Critical Analysis Load Combination = 105
Critical Load Combination = [57] : 1.5 (LOAD 3: DL)
+1.5 (LOAD 1: EQX)
Pu = 221.57 kN
Mux = -33.23 kNm
Muy = 8.17 kNm
P/A = 161.14 kN/sqm
Mx/Zx = -115.99 kN/sqm
My/Zy = 32.42 kN/sqm
Deff = 276 mm
Leff = 1250 mm
SPu = 309.55 kN/sqm
Vu = SPu X (Boff - d) X L
= 47.98 kN
Tv = Vu / (Leff X Deff)
= 0.14 N/sqmm
Tc = 0.29 N/sqmm
Tv < Tc
19
Pu = 221.57 kN
Mux = -33.23 kNm
Muy = 8.17 kNm
P/A = 161.14 kN/sqm
Mx/Zx = -115.99 kN/sqm
My/Zy = 32.42 kN/sqm
Deff = 284 mm
Leff = 734 mm
Beff = 584 mm
Punching Perimeter = 2636 mm
Punching Area = 748624 sqmm
SPu = Max Pressure
= 309.55 kN/sqm
Vu = SPu X ((L X B)-(Leff X Beff))
= 292.94 kN
Tv = Vu / Punching Area
= 0.391 N/sqmm
Tc = 1.25 N/sqmm
Tv < Tc
20
Analysis No : 4,11,12,18,32,31,23,24
21
Maximum Soil Pressure = 362.06 kN/sqm
Allowable Soil Pressure = (1.5 X 280) + 36 kN/sqm
= 456 kN/sqm
Deff = 292 mm
Beff = 1050 mm
SPu = 466.13 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 34.41 kNm
Pt = 0.144 %
Ast Rqd (BM) = 441 sqmm
Ast Prv (Distributed Across Total = 8 - T10 @ 150
Width)
= 628 sqmm
22
Bottom Reinforcement Along B:
Critical Column No = C5
Critical Analysis Load Combination = 120
Critical Load Combination = [72] : 1.5 (LOAD 3: DL) -1.5 (LOAD 6:
RESPONCE SPECTRUM -Z)
Pu = 354.2 kN
Mux = -10.73 kNm
Muy = -17.22 kNm
P/A = 321.27 kN/sqm
Mx/Zx = -55.59 kN/sqm
My/Zy = -89.27 kN/sqm
Deff = 276 mm
Leff = 1050 mm
SPu = 466.13 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 34.41 kNm
Pt = 0.152 %
Ast Rqd (BM) = 441 sqmm
Ast Prv (Distributed Across Total
= 8 - T10 @ 150
Length)
= 628 sqmm
Deff = 292 mm
Beff = 1050 mm
SPu = 466.13 kN/sqm
Vu = SPu X (Loff - d) X B
= 40.62 kN
23
Tv = Vu / (Beff X Deff)
= 0.13 N/sqmm
Tc = 0.29 N/sqmm
Tv < Tc
= 276 mm
Critical Column No = C5
Critical Analysis Load Combination = 120
Critical Load Combination = [72] : 1.5 (LOAD 3: DL)
-1.5 (LOAD 6:
RESPONCE
SPECTRUM -Z)
Pu = 354.2 kN
Mux = -10.73 kNm
Muy = -17.22 kNm
P/A = 321.27 kN/sqm
Mx/Zx = -55.59 kN/sqm
My/Zy = -89.27 kN/sqm
Deff = 276 mm
Leff = 1050 mm
SPu = 466.13 kN/sqm
Vu = SPu X (Boff - d) X L
= 48.45 kN
Tv = Vu / (Leff X Deff)
= 0.17 N/sqmm
Tc = 0.29 N/sqmm
Tv < Tc
Critical Column No = C5
Critical Analysis Load Combination = 100
Critical Load Combination = [52] : 1.5 (LOAD 3: DL) +1.5 (LOAD 4:
LL)
Pu = 393.31 kN
Mux = -7.98 kNm
Muy = -4.11 kNm
P/A = 356.74 kN/sqm
24
Mx/Zx = -41.34 kN/sqm
My/Zy = -21.3 kN/sqm
Deff = 284 mm
Leff = 584 mm
Beff = 584 mm
Punching Perimeter = 2336 mm
Punching Area = 663424 sqmm
SPu = Max Pressure
= 419.38 kN/sqm
Vu = SPu X ((L X B)-(Leff X Beff))
= 319.33 kN
Tv = Vu / Punching Area
= 0.481 N/sqmm
Tc = 1.25 N/sqmm
Tv < Tc