PROJECT MANAGEMENT IDP

BY
IR BASIR NOORDIN
PROJECT MANAGEMENT

PROJECT MANAGEMENT IN IDP CAN BE DIVIDED INTO :

 Taking off quantities


 Bill of quantities (BQ)
 Estimation
 Project planning (S-Curve)
TAKING OFF QUANTITIES

SCOPE OF TAKING OFF QUANTITIES :


 Structure
 Infrastructure
NOTES : Architecture’s works, M & E works are not included in IDP
1. Structure
 Concrete
 Reinforcement/BRC
 Formwork
 Painting
 Piling
 Excavation
 Backfilling for foundation
TAKING OFF QUANTITIES

2. Infrastructure
 Earthwork
 Water supply system
 Sewerage system
 Drainage system
TAKING OFF QUANTITIES

Earthwork:
 Site clearance
 Cutting
 Filling
 Silt trap
 Detention pond
 Wash trough
 Temporary earth drain
 Turfing
 Etc
TAKING OFF QUANTITIES
WATER SUPPLY SYSTEM :
 Excavation for pipe trench/foundation
 Backfilling
 Supply of material
 Bends & fittings
 Tees
 Sluice valves
 Air valves
 Connection to JBA pipe
 Hydrants
 Concrete
 Reinforcement/BRC
 Formwork
 FRP tanks/other equivalent tanks as approved by local authority
 Brickworks
TAKING OFF QUANTITIES

SEWERAGE SYSTEM;
 Excavation for trench/manhole
 Backfilling for trench/manhole
 Supply of materials
 Manhole
 Manhole cover
 Brickworks/ precast concrete
 Reinforcement/BRC
 Concrete
 Formwork
 Piling (if any)
TAKING OFF QUANTITIES

DRAINAGE SYSTEM:
 Excavation
 Backfilling
 Supply of materials
 Concrete
 Reinforcement/BRC
 Formwork
 Brickworks
 Mild steel grating
 Culvert
BILL OF QUANTITIES (B.Q)/ESTIMATION

BILL OF QUANTITIES (B.Q)/ESTIMATION;

 Using standard form as attached


 Describe all the works accordingly
 Insert the quantities, unit and rate
 Estimate all the items based on current
rates.
BILL OF QUANTITIES/ESTIMATION
-EXAMPLES (PRELIMINARIES)-
BILL OF QUANTITIES/ESTIMATION
(INFRASTRUCTURAL WORKS)
-EXAMPLES (EARTHWORKS)-
BILL OF QUANTITIES/ESTIMATION
(INFRASTRUCTURAL WORKS)
-EXAMPLES (WATER SYSTEM)-
BILL OF QUANTITIES/ESTIMATION
(INFRASTRUCTURAL WORKS)
-EXAMPLES (SEWERAGE SYSTEM)-
BILL OF QUANTITIES/ESTIMATION
(INFRASTRUCTURAL WORKS)
-EXAMPLES (DRAINAGE SYSTEM)-
BILL OF QUANTITIES/ESTIMATION
-EXAMPLE PILING-
BILL OF QUANTITIES/ESTIMATION
-EXAMPLE STEELWORK-
BILL OF QUANTITIES/ESTIMATION
-EXAMPLE STRUCTURAL WORK-
PROJECT PLANNING (S – CURVE)

PROJECT PLANNING (S- CURVE) :


Information required are:
 Bill of quantities (B.Q)
 Estimation
 Project duration
 Preparation of S-Curve (Microsoft project/
equivalent software)