Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEYPLAN

T1-01T1-02 T1-03 T1-04 T1-05 T1-06 T1-07 T1-08 T1-09 T1-10 T1-11 T1-12T1-13T1-14T1-15 T1-16T1-17T1-18 T1-19 T1-20T1-21 T1-22 T1-23T1-24 T1-25 T1-26 T1-27 T1-28 T1-29 T1-30T1-31T1-32 T1-33T1-34 T1-35T1-37 T2-01T2-02

565 4680 50 1615 2925 1145 1130 3290 1840 3300 315 1415 445 2830 640 1825 640 2830 445 1415 450 3300 1840 3340 1080 2060 1695 295 1590 710 1410 1335 1330 1600
135 75
T1 T2
NT-1A NT-2A NT-3A NT-4A NT-5A NT-6A NT-7A
7900 7900 7900 7900 7900 7900 T3

750

700
T16-250 T2
(2500) NOTES:
750 1. THIS DRAWING IS THE COPYRIGHT OF WME CONSULTANTS, AND

T16-250 T1

T20-250 T1
NT-A1 MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE ABOVE

(6750)

(2500)
CONSULTANT'S AUTHORITY.
2. DO NOT SCALE FROM THE DRAWINGS.
750

T16-250 T1
3. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES

(6750)
UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON
SITE AND APPROVED BY THE ENGINEER.
LAP 4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER
T20-250 T2 RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND
(7500) ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE
SPECIFICATIONS. ANY DISCREPANCIES ARE TO BE BROUGHT TO
THE ATTENTION OF THE ENGINEER AND RESOLVED BEFORE

T25-250 T1
T16-250 T1

T16-250 T1

T25-250 T1
COMMENCEMENT OF ANY WORK.
7990

(7000)
(5500)

(5500)

(7000)
95

T25-250 T1

T32-250 T1+
T25-250 T3
(5500)
200

(5750)
T16-250 T1
STRUCTURAL REFERENCE DRAWING

(5500)
BASEMENT-02 (FOUNDATION)
RP-WME-ST-TWR1-B2-100-00
GENERAL ARRANGEMENT PLAN
150

T25-250 T1
T20-250 T3
1250
1300 800

(5000)
T20-250 T1
RP-WME-ST-TWR1-00-300-01 FOUNDATION GA SECTION

(8250)

T25-250 T1
RP-WME-ST-COMM-00-000-03 STANDARD DETAILS GENERAL NOTES - 01

(5000)
T1-A T32-250 T2+ RP-WME-ST-COMM-00-000-04 STANDARD DETAILS GENERAL NOTES - 02
350

T25-250 T1
T20-250 T3

T16-250 T4
(5000)

1250
T32-250 T1
T16-250 T3

(7000)
T32-250 T4
(6500)

T1-B
1880

(6000)

T16-250 T1
T25-250 T2

(7500)

1250
T1-C

T32-250 T1+
T20-125 T4 ARCH. REFERENCE DRAWING

T25-250 T3
(4500)
(5000)
T16-250 T1
1465

T16-250 T1
RECEIVE MAIL ON -23RD MARCH 2023
(7500)

(11250)
T1-D

T20-250 T1
LAP

(4500)
915

T1-E T32-250 T2
250

T1-F T20-250 T4
T25-250 T2
T32-250 T4

1500
1250
1125 485 1060 50 1180

(10750) T16-125 T4
T1-G (4500) (3300)
T25-250 T1

T32-250 T2 Ld
(5500)

T1-H

300
T25-250 T1 (5100)
1000

(6700)

T32-250 T1
T1-J 1250

T32-250 T1
T1-K 650

(9000)
125

T25-125 T3
2000
T1-L
950
T32-250 T1

1250
475 500

T25-250 T1

2535
(6500)

(10000)
T1-M T20-250 T2 650 Ld
1265190 900

T1-N (5000)
200

T20-250 T2
T16-250 T2
T1-P (5000)
2000

1250

?
1550 (T25-250) (4500)
T1-Q (6000)

T32-250 T1
T25-250 T3
T32-250 T1
T20-250 T3
100

(12000)
(10000)

T1-R
T1-S
250 1180

T32-250 T1 T32-250 T2+


T25-125 T3 T20-250 T4

1250
(8300)

1250
T1-T T25-250 T2 T25-250 T2 (5250)
T20-250 T1

T20-250 T1
LAP

(11250)
T20-250 T2 T20-250 T4 T20-250 T4
(9000)
2055

T1-U (8100)
T25-250 T2
(5500) T32-250 T1 (5500)
T25-250 T2

T32-250 T1+
T25-125 T3 T25-250 T2

T16-250 T3
T20-250 T4
T32-250 T1
T20-250 T3

T20-250 T4 (8300) T20-250 T4

(4500)
(5500)
T1-V
(6500)

(4000) T25-250 T2 (5500)


850

1250 T20-250 T4
T1-W (5200) T25-250 T2
1250

1250
(9000) 1320
1250
T25-250 T1
T16-250 T3
1695

1250

1250
T1-X
1250
(5000)

(TYP.)

2050
105
510

T1-Y 1250 T32-250 T2+


500

T16-250 T2 1200 T25-250 T4


T1-Z T32-250 T2 T32-250 T2 (5500) (5500)
T25-250 T1

T20-250 T1

T25-250 T1
2760

T16-500 T1

T20-250 T4

T25-250 T1
T20-250 T4
(5700)

(8250)

(6500)
(6500)

T32-250 T1+
(5700)
(6000)

T32-125 T3
(8500)

T25-250 T1

(7500)
(5700)
NT-A
R0 06.04.2023 ISSUED FOR CONSTRUCTION RK
REV NO. DATE DESCRIPTION BY.
STATUS:
ISSUED FOR CONSTRUCTION

CONSTRUCTION
PROJECT:

JOINT
5275 5735 6260 5610 3405 1950 3405 5610 6260 5635 3380

RIVALI PARK, PHASE III


NT-01 NT-02 NT-03 NT-04 NT-05 NT-06 NT-07 NT-08 NT-09 NT-10 NT-11 NT-12 Mumbai, India

CLIENT:
TOWER 01 - FOUNDATION TOP REINFORCEMENT PLAN
1 : 100

ARCHITECT:
RAFT BASIC REINFORCEMENT SCHEDULE REMARKS

RAFT BOTTOM REINFORCEMENT TOP REINFORCEMENT


THICKNESS B1 B2 T1 T2

B2,B4,B6,B8
T2,T4,T6,T8
450 T16-250 T16-250 T16-250 T16-250
FOOTING REINFORCEMENT SCHEDULE - TOWER 01 29 Bank Street, Fort, Mumbai 400 023 Tel : 2266 1920
850 T25-250 T25-250 T20-250 T20-250
SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STRUCTURAL / MEP CONSULTANT:
FOOTING MARK SIDE FACE REIN'F REMARKS 1350 T25-250 T25-250 T25-250 T25-250
WIDTH LENGTH DEPTH B1 B2 T1 T2 T1,T3,T5,T7
1400 T25-250 T25-250 T25-250 T25-250 B1,B3,B5,B7
F1 2700 2900 850 T25-250 + T16-250 T25-250 + T16-250 T16-250 T16-250 T12-200
F2 3825 2900 850 T25-125 T25-125 T25-250 + T16-250 T25-250 + T16-250 T12-200 1650 T32-250 T32-250 T25-250 T25-250
F3 2350 4100 1350 T32-125 T32-125 T16-250 T16-250 T12-200 2000 T32-250 T32-250 T32-250 T32-250
F4 2300 6850 1400 T32-125 T32-125 T16-250 T16-250 T12-200 NOTE:- DRAWING TITLE:
1. REINFORCEMENT SHOWN ON PLAN, ADDITIONAL TO BASIC CONTINUOUS REINFORCEMENT.
TOWER-01
NOTE: NOTE :
1. THE DOWELS SHOULD BE LEFT AFTER THE CONSTRUCTION JOINT
FOUNDATION TOP REINFORCEMENT PLAN
1) TOP & BOTTOM REINFORCEMENT
FOR THE NEXT POUR. IS SHOWN SEPARETELY IN PLAN FOR CLARITY.
2. SITE CAN PROCEED FOR FABRICATION OF BASIC MESH 2) INDICATE BOTTOM BARS
REINFORCEMENT FOR ADDITIONAL REINFORCEMENT FABRICATION 3) INDICATE TOP BARS DATE: SCALE @ A1: DRN BY: CHKD BY: APP BY: REVISION
CAN BE DONE AFTER CCI APPROVAL. 4) STAGGRED LAPPING SHOULD BE PLANNED FOR MESH & EXTRA REINFORCEMNT. 06-04-2023 As indicated RA SP NR R0
5) DISTRIBUTION REINF: T10-250 C/C (PROVIDE WHEREVER REQ.) PROJECT No: DRAWING No:
P550012 RP-WME-ST-TWR1-B2-201-00

You might also like