Professional Documents
Culture Documents
S-0000-13A0-001 - 2B - 0001 - FC - Specification For Painting and Color Coding
S-0000-13A0-001 - 2B - 0001 - FC - Specification For Painting and Color Coding
G-6121-00 S-0000-13A0-001
COMPANY JOB # COMPANY DOC # 2B
- CA-8230-SP-0003
DATE SHEET
23 FEB 22 1 OF 57
CHRISTOPHER SANTIAGO /
CHK’D C.S. / E.M.R.
ENRICO REYES
FOR CONSTRUCTION
D M S2
-
J28-Jun- 2 0 2
D 1 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 2 of 57
TABLE OF CONTENTS
1 SCOPE ...................................................................................................................................................... 4
2 REFERENCES .......................................................................................................................................... 4
2.1 Global Practices ................................................................................................................................ 4
2.2 Project Specification .......................................................................................................................... 4
2.3 Industry Standards ............................................................................................................................ 4
2.3.1 ANSI (American National Standards Institute) ......................................................................... 4
2.3.2 ASME (American Society of Mechanical Engineers) ............................................................... 4
2.3.3 ASTM (American Society for Testing and Materials) ............................................................... 4
2.3.4 ISO (International Organization for Standardization) ............................................................... 5
2.3.5 SSPC (The Society for Protective Coatings) ............................................................................ 5
2.3.6 NACE (National Association of Corrosion Engineers) ............................................................. 6
2.3.7 RAL ........................................................................................................................................... 6
2.4 ExxonMobil Publications ................................................................................................................... 6
3 ACRONYMS AND DEFINITIONS ............................................................................................................. 7
3.1 Acronyms .......................................................................................................................................... 7
3.2 Definitions.......................................................................................................................................... 7
4 GENERAL REQUIREMENTS ................................................................................................................... 8
4.1 Paint Procedure ................................................................................................................................ 8
4.2 Extent of Painting Works ................................................................................................................... 8
4.3 Environment Condition ...................................................................................................................... 9
4.4 Safety, Health and Environment ....................................................................................................... 9
4.5 Technical Data Sheet / Material Safety Data Sheet ....................................................................... 10
5 SURFACE PREPARATION .................................................................................................................... 10
5.1 Blasting and Spraying Equipment ................................................................................................... 11
5.2 Abrasive Material ............................................................................................................................ 11
5.3 Abrasive Blasting ............................................................................................................................ 12
5.4 Power Tool Cleaning ....................................................................................................................... 12
6 PAINT APPLICATION ............................................................................................................................. 12
6.1 Paint Material Selection .................................................................................................................. 12
6.2 Paint System Selection ................................................................................................................... 13
6.3 Primer Coat Application .................................................................................................................. 13
6.4 Intermediate and Finish Coat Application ....................................................................................... 14
6.5 Film Thickness ................................................................................................................................ 14
6.6 Compatibility with Existing Paint System ........................................................................................ 14
6.7 Brush or Roller Application.............................................................................................................. 14
6.8 Bolt, Nut and Bolt Holes Subject to be painted ............................................................................... 15
D M S2
-
J28-Jun- 2 0 2
D 2 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 3 of 57
D M S2
-
J28-Jun- 2 0 2
D 3 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 4 of 57
1 SCOPE
This project specification covers the minimum requirements for the paint material selection, surface
preparation, paint application and quality control of coatings for new construction of external surfaces of steel
structures, piping, equipment, tank, electrical and instrumentation for Metallocene Catalyst Expansion (Met-
X) Project in Jurong Island, Singapore.
2 REFERENCES
The latest edition and/or revision of the following practices, codes, standards, and specifications shall be
used to supplement this specification.
ANSI Z400-1 Hazardous Industrial Chemicals – Material Safety Data Sheets - Preparation
D M S2
-
J28-Jun- 2 0 2
D 4 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 5 of 57
D M S2
-
J28-Jun- 2 0 2
D 5 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 6 of 57
2.3.7 RAL
RAL Classic RAL (Reichsausschuß für Lieferbedingungen und Gütesicherung)
colors are used for information defining standard colors for varnish, powder
coating and plastics.
D M S2
-
J28-Jun- 2 0 2
D 6 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 7 of 57
3.1 Acronyms
ACQPA Association for Certification and Qualification for Anticorrosive Paintwork
CUI Corrosion Under Insulation
DFT Dry Film Thickness (of a fully cured coating material or system)
FBE Fusion-Bonded Epoxy
IOZ Inorganic Zinc
ITP Inspection and Test Plan
MEK Methyl Ethyl Ketone
MIO Micaceous Iron Oxide
MSDS Material Safety Data Sheet
PPE Personal Protective Equipment
QA Quality Assurance
QC Quality Control
RIE Remote Instrument Enclosure
SHE Safety, Health and Environment
TSA Thermal Spray Aluminum
VOC Volatile Organic Compound
WFT Wet Film Thickness
3.2 Definitions
COMPANY ExxonMobil Asia Pacific Pte. Ltd.
CONTRACTOR JGC Asia Pacific Pte. Ltd.
SUBCONTRACTOR The company that performs surface preparation and coating application at
the project site.
VENDOR Awarded Bidder who is selected and employed by CONTRACTOR to supply
the designated Equipment / Materials
Project Metallocene Catalyst Expansion Project (Met-X)
Project Site Jurong Island, Singapore
COMPANY’s Engineer A designated ExxonMobil subject matter expert on coatings.
Inspector COMPANY or CONTRACTOR representative assigned to provide quality
assurance inspection
PAINT Manufacturer of coating materials / products
MANUFACTURER
Coating System Design The maximum of normal operating, steam-out, or upper-end cyclic
Temperature temperature.
Original Equipment Equipment, such as machinery and other specialty items, which typically
Manufacturer (OEM) receive VENDOR’s Standard Coating System at the location of VENDOR.
D M S2
-
J28-Jun- 2 0 2
D 7 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 8 of 57
4 GENERAL REQUIREMENTS
SUBCONTRACTOR/VENDOR shall submit the detailed Paint Procedure prior to execution of painting
work. The Paint Procedure shall at least include the following;
a. Acknowledgement of, and exceptions to, the technical specification provided by CONTRACTOR.
b. Coating materials to be used and their technical data sheets.
c. Copy of a functioning Quality Control (QC) Plan. The plan shall include the following:
i. QC inspection – details regarding the extent of and by whom it will be provided
ii. Qualifications of SUBCONTRACTOR’s QC personnel, detail of responsibilities, and chain of
command.
iii. The following minimum QC hold points: immediately prior to surface preparation, immediately
prior to coating application, following application of each coat, and following the cure of the
coating. (Inspection and Test Plan)
d. Inspection items following APPENDIX E. (Inspection Methods and Acceptance Criteria) for the
items painted at VENDOR shop with VENDOR’s standard paint system, VENDOR standard
inspection requirement can be utilized provided all relevant inspection items were reported.
e. Paint Inspection Form
f. Measuring Point Map of Film Thickness, if applicable
All uninsulated and insulated carbon steel and low alloy surfaces of the following shall be painted;
a. Steel structure, equipment and piping
b. Skid mounted package equipment
c. Purchased equipment
d. Rotary machineries
e. Electrical and Instrumentation items
The following metallic and non-metallic surfaces does not require painting unless otherwise specified;
a. Non-ferrous metal surfaces
b. All uninsulated stainless steel surfaces
c. Galvanized steel surfaces except for safety color identification purposes
d. Finished metals such as aluminized steel, bronze and similar metals
e. Internal surface of equipment, piping and bolt thread, except required by the data sheet
f. Screwed items of valves, gasket surfaces, etc.
g. Finished machined parts such as flange surface
h. Surface used for identification, nameplates, serial number plates, valve identification signs, gauge
glasses, guards, gauge faces, light fixtures, valve stems and flange bolts
D M S2
-
J28-Jun- 2 0 2
D 8 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 9 of 57
Surface preparation and paint application shall NOT be performed under any of the following conditions;
a. Relative humidity is greater than 85%. For inorganic zinc primer, relative humidity is less than 50%
or Paint Manufacturer’s recommendation.
b. The surface is wet/sweat/condensed.
c. Surface temperature is less than 3 °C above dew point.
d. Air and metal surface temperature is exceeded or below Paint Manufacturer’s recommendation.
e. Without appropriate artificial light during night or in the dark (inside Tank, Vessels, etc.).
f. Condition of strong or gusty winds or of poor visibility
All personnel shall be provided with appropriate PPE (Personnel Protective Equipment), e.g., protective
clothing, safety glasses, safety shoes, hard hats, goggles, respirators, earplugs, fresh-airfed hood and
any other necessary safety equipment.
All safety equipment shall be maintained properly. Adequate warning signs shall be prominently
displayed at all access points to areas and barricaded appropriately where abrasive blasting and
painting is in progress. Always mix paints; and clean brushes/rollers and other equipment used in
painting, in well-ventilated, non-enclosed areas and at least 6 meters from confined space entry and all
air intakes locations.
For outdoor spray painting, barricade or rope off an area whereby air-borne levels of the paint
components, outside this barricade, are below their exposure limits; or at a minimum distance of 7.5m
(25 feet) from spray application area. Handling and disposal of hazardous waste resulting from the
painting activities shall be in accordance with regulations.
All layers of a paint system and all abrasive blasting materials shall comply with any local and/or
regional standards or regulations. Paints and coatings containing lead, cadmium & chromium are not
D M S2
-
J28-Jun- 2 0 2
D 9 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 10 of 57
allowed for use at Singapore Manufacturing Site. Any paint system shall fully comply with any local
and/or regional air quality or Volatile Organic Compounds (VOC) levels or emission standards or
regulations.
SUBCONTRACTOR/VENDOR shall protect all equipment, structures and any other areas from
mechanical damage, environmental damage, damage caused by over blasting, dripping paint, paint
splashes and overspray.
SUBCOTRACTOR/VENDOR to provide latest edition of all technical data sheet and material safety data
sheets. The material safety data sheet must be readily available at site where painting works is
executed.
5 SURFACE PREPARATION
Before abrasive blasting, all equipment parts which may be damaged by blast, dust, or particulate matter
shall be suitably protected by wrapping, taping or other means to prevent damage. This equipment shall
include but not necessarily be limited to the following;
Prior to the start of work, SUBCONTRACTOR/VENDOR shall verify all surfaces to be coated as being free of
oil, grease, dirt, burrs, slivers, undercut welds, excessive weld porosity, and visible salt contamination.
All weld joints requiring hydrotesting and/or sensitive leak test must be completed prior to any surface
preparation and coating application.
Adjacent area of welding shall be cleaned to prevent sharp rough areas and free from slag, spatter, flux
residue.
All openings including those that area flanged or threaded shall be sealed to prevent entry of blast abrasives.
D M S2
-
J28-Jun- 2 0 2
D 10 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 11 of 57
SUBCONTRACTOR/VENDOR shall provide the following to the point of use: compressed air, coolers,
moisture traps, etc. as necessary to provide clean, dry air of sufficient quantity and pressure at the
nozzle to achieve the specified surface preparation or paint application.
Oil and water traps, automatic drains, and after-coolers on compressed air supply systems shall be
checked and drained at the beginning of each shift as a minimum, and more frequently if required, to
maintain quality of the air source.
Steel grit or shot shall not be used for stainless, galvanized and non-ferrous metal surface.
Abrasive materials shall be free from oil, grease, dust, salts, chloride and other impurities. The particle
size shall be suitable to give the required surface profile / roughness recommended by Paint
Manufacturer as stated on the technical data sheet. Sand shall not be used as abrasive for surface
cleaning.
Abrasive must be capable of providing a sharp, dense angular profile of the specified depth.
Recycled abrasive may be used only in blast rooms where automated dust removal equipment exists.
SUBCONTRACTOR must obtain an analysis certificate of the blast media for each batch of blast media
to be used, which, as a minimum, indicates the batch number, the media's gradation, and chloride
levels. The media shall comply with the requirements of SSPC AB 1.
D M S2
-
J28-Jun- 2 0 2
D 11 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 12 of 57
Surface preparation shall achieve the required standards immediately prior to priming.
All blast cleaned surfaces shall be primed before visible re-rusting occurs or within four (4) hours of the
commencement of blasting. If visible re-rusting occurs or more than four (4) hours elapse, then the
metal surfaces shall be lightly re-blasted and where necessary washed to remove rust blooming and
accumulation of soluble salts.
When steel grit and shot abrasive is used, routine and frequent addition of grit to the grit/shot mixture is
necessary to achieve a sharp, dense angular profile of the specified depth. The minimum grit/shot ratio
shall be 65%. Blast media consisting solely of steel shot is prohibited.
The surface roughness / surface profile after abrasive blasting shall be in accordance with Paint
Manufacturer recommendation as stated on its technical data sheet.
If the power tool used is air-powered, then the area must be solvent wiped to ensure that the tool did not
contaminate the surface with oil through worn seals.
Any surrounding coating shall be feather etched for a minimum overlap of 2 in. (50 mm).
6 PAINT APPLICATION
Coating materials specified in APPENDIX B (Coating System Descriptions and Accepted Coatings)
shall be used. Alternative paint systems for those in APPENDIX B may be proposed if they can be
demonstrated that there is a significant cost or performance benefit for using the proposed system. In
that case, it shall be submitted to COMPANY through CONTRACTOR for approval after requirements in
APPENDIX C (Test Requirements and Acceptance Criteria for Coating Qualification) has been
completed.
D M S2
-
J28-Jun- 2 0 2
D 12 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 13 of 57
APPENDIX A (Coating System Selection Table) of this specification shall be used to select coating
systems. Tables in APPENDIX A are provided for each of the following service categories.
Category A: Uninsulated aboveground carbon and low-alloy steel equipment, vessels, piping,
piping specialty, stacks, and ductwork
Category B: Externally insulated aboveground carbon and low-alloy steel equipment, vessels,
piping, piping specialty and ductwork
Category C: Aboveground structural steel and repair of galvanizing
Category D: Underground piping and fittings and field welds and repair
Category E: Underwater / splash zone and marine and land piles and sheet piling
Category F: Stainless steel Equipment, Vessels, Piping, Piping Specialty
Category G: Purchased equipment (OEM) – Machinery, Motors, Instruments, Transformers,
Tagged Valves, Bulk Valves, Fire Fighting Equipment, etc.
Category I: Remote instrument enclosures (RIEs), substation enclosures, and small metallic
buildings
Appropriate paint system shall be selected considering the maximum operating temperature and/or
steam-out temperature condition of the equipment and piping.
1) Primer shall be uniform thickness, especially at welds, edges, and corners free of mud cracking.
2) Primer coat shall not be brick red or rust colored.
3) Primer shall not be applied within 4 in. (100 mm) of unblasted surfaces or edges to be welded.
4) Primers except for IOZ when required by Paint Manufacturer, shall be applied using an agitated
pot.
5) Application of Inorganic Zinc Primer (IOZ)
During the application of inorganic zinc primer, a continuous mixing device shall maintain the
pigment in suspension. Unless there is no alternative, inorganic zinc shall not be applied with
roller or brush. IOZ shall have dry spray removed with wire screen and shall be confirmed as
sufficiently cured according to the methyl ethyl ketone (MEK) rub test per Paint Manufacturer's
instructions before top coating.
When intermediate or finish coat is applied over fresh inorganic zinc primer, a “mist” coat shall
be applied first to displace all air entrapped on the surface of inorganic zinc. Epoxy or silicone
paint which would be applied over inorganic zinc shall be thinned by appropriate thinner and
D M S2
-
J28-Jun- 2 0 2
D 13 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 14 of 57
applied as “mist” coat. The percentage of thinning shall be in accordance with Paint
Manufacturer’s recommendation.
White rust that has formed during the intervening period shall be removed in accordance with
Paint Manufacturer's instructions prior to over-coating.
A uniform spray application on large surfaces for priming, intermediate and finish coating shall be
obtained by 50 percent overlapping vertical passes followed by 50 percent overlapping horizontal
passes.
Contaminations shall be minimized by applying succeeding coats within the time period recommended
by Paint Manufacturer. If contaminants are present, they shall be removed before applying the
subsequent coat. The blasted surface, primer coat, intermediate coat and finish coat shall be examined
for dirt and dust prior to application of additional coats.
All edges, corners, fillet welds and other areas where grinding is not possible and all other sharp edges
and protrusions shall be stripe coated with one additional coat of brush applied primer.
Coating applications on inaccessible area to perform spray application, shall be brush applied to reach
the specified dry film thickness.
D M S2
-
J28-Jun- 2 0 2
D 14 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 15 of 57
Carbon steel or low alloy steel anchor bolts specified in GP 04-06-01, ASTM A 354 Grade BC high-
strength bolts may be hot-dip galvanized. High-strength bolting that should not be galvanized may be
coated by mechanical galvanizing or with an IOZ rich primer. No other bolting requires coating.
When a full coating system is specified for under the insulation, the coating on the protrusion may be
the same as that under the insulation.
The following items shall be painted by VENDOR at their shop with their standard paint system:
Purchased Equipment (OEM): Machinery, Motors, Instruments, Transformers, Tagged Valves, Bulk
Valves, Fire Fighting Equipment, etc.
The VENDOR's standard paint system shall be approved by CONTRACTOR/COMPANY and shall
comply with the following:
1. The paint system for up to 200°F (93°C) shall be at least equivalent to paint systems in ISO 12944-
5 with an environment C-5M and the expected durability of 15 years.
2. The paint system above 200°F (93°C) shall be equivalent to the paint systems specified in
APPENDIX B.
3. The finish color shall be in compliance with APPENDIX D (Color Schedule).
VENDOR 's standard inspection requirements can be applied. The minimum requirements for
VENDOR's standard inspection are shown in para. 13.2.
D M S2
-
J28-Jun- 2 0 2
D 15 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 16 of 57
Markers for process lines shall have the pipe contents printed on the top line and the line number and
appropriate FROM / TO information on the second line of each marker. All process line markers shall
have a flow direction arrow.
The text format shall be as follows:
Markers for utility lines shall have pipe contents printed on them with flow direction only, no FROM / TO
information unless specifically requested.
Markers placement parameters and sign specifications are summarized on the following COMPANY
drawings;
a. ZX-141-0100 (SCP Process Labelling Standard) as shown on APPENDIX E
b. ZX-141-0101 (SCP Process Labelling Standard) as shown on APPENDIX F
c. ZX-141-0102 (SCP Process Labelling Standard - Sign Details) as shown on APPENDIX G
Pipe / Line contents, or the LEGEND, should state the hydrocarbons/chemicals/utilities involved.
In addition, other useful information for the operator should be included, such as:
- NNF (for normally no flow) B31
- INERT C4 FOR STARTUP
- C2=ERC LEVEL PULLDOWN
- HEAVIES PURGE (BUNDLE SIDE)
- PGC 5th STG KICKBACK
etc.
Notes:
1) Where this type of information requires more than 4 to 5 words it may be difficult to get on a
label and in that case a sign should be used instead.
D M S2
-
J28-Jun- 2 0 2
D 16 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 17 of 57
2) Legend names should be checked to ensure they are consistent with names used in
operating manuals and procedures.
The FROM / TO information, on the 2nd line, will usually be the equipment number(s). However,
where specific “jargon” or common names are desired they can be used. For example, “TO
FURNACE AREA” or “FROM BOILERS”, “FROM SEPARATOR #1”, may be more informative
than the associated equipment numbers. In particular, this type of designation should be used to
help ensure that the line labeling is consistent with any designations and/or common names
used in the operating procedures.
Markers should include “unit identifiers” if there are parallel or multiple units/trains/blocks/skids,
etc., with the same processing purpose, as in steam cracking furnaces, parallel/space driers or
reactors or any parallel unit operations. These type of markers help the operator to quickly
recognize what unit he is on, particularly where the parallel or multiple pieces of equipment are
almost identical in design/layout.
These labels can skip the TO or FROM information if it is the same as the unit identifier.
8.1.3 Installation
All pipe markers/labels and signs shall be installed using proven materials and techniques, as
per Marking Services, Inc. standard or equivalent. Installation must be completed such that no
sharp edges or projections are exposed.
Attachment of labels or signs with twisted wire is not acceptable for permanent installations.
Markers which will be on hot lines (over 120 oC) must be noted on the spreadsheet. These labels
will be provided with a stainless steel carrier with insulation/air gap to keep heat off the label
itself.
Equipment will be identified by tag number and description. These will be stencilled letters and
number using industrial quality black paint.
Stencil size and placement parameters for various pieces of equipment are shown in APPENDIX
H: ZX-141-0102 (SCP Process Labelling Standard – Equipment Identification)
D M S2
-
J28-Jun- 2 0 2
D 17 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 18 of 57
Finish color schedule for structure, equipment and piping are shown on APPENDIX D (Color Schedule).
9 GALVANIZING
Galvanizing on forged steel shapes, such as plate, castings, bars and strips shall be according to
ASTM A 123/A 123M or equivalent. Galvanizing on threaded fasteners shall be according to ASTM A
153/A153M or equivalent. Unless waived by COMPANY, zinc for galvanizing shall be in accordance with
ASTM B 6, "High grade zinc," which contains a maximum of 0.03% lead and 0.01% cadmium.
The COMPANY's Engineer shall supply a job specification that establishes the criteria for
SUBCONTRACTOR/VENDOR qualification, surface preparation, application, and inspection of Thermal
Spray Aluminum (TSA).
The thermal spray wire shall be 99% Al, conforming to AWS C2.25/C2.25M, C2.25 Classification W-AL-1100
(UNS No. A91100). The Manufacturer or Supplier shall provide a certificate of conformance for each batch
supplied.
11 REPAIR PROCEDURE
Paint surface irregularities not to reach the substrate, such as runs, sags, blemishes, blisters or dry spray in
the coating shall be removed and affected area repaired by subsequent paint material.
D M S2
-
J28-Jun- 2 0 2
D 18 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 19 of 57
If coating damage has occurred exposing steel, then the area shall be spot-blast cleaned (vacuum blast is
acceptable) or power tool cleaned to restore the exposed steel to the originally specified degree of
cleanliness.
Adjacent coating shall be feathered back approximately 2 in. (50 mm) to form a uniform etched surface. The
prepared surface shall be free of loose, lifting, burned, or blistered coating.
If the coating thickness is deemed to be outside of Paint Manufacturer's permissible DFT (range, i.e., too
high or too low) the final overall coating thickness shall be adjusted to be within the prescribed range. Follow
Paint Manufacturer's recommended steps in rectifying the overall coating thickness.
Paint materials suitable for touch-up are covered on the coating system sheets included in APPENDIX B. For
galvanized steel, it shall be repaired by using Solvent-Borne Zinc-Rich Epoxy and Epoxy Mastic (System 5).
SUBCONTRACTOR shall comply with all requirements of Paint Manufacturer's most recent application
instructions and technical data sheets. This includes storage, straining, mixing, thinning, pot agitation,
application, and recoat intervals of coatings.
Coating materials shall be maintained in the original unopened containers prior to use, free from damage
and with complete labeling. All containers shall be legibly labeled throughout the duration of the job. Any
container on which labeling has been damaged or removed shall not be used and must be removed at site.
First-in first-out basis on coating material usage must be applied at all times.
Partial kit mixing is not permitted: For touch-up purposes, mixing of small amounts is permissible only
when precise measuring of components is witnessed by Inspector.
D M S2
-
J28-Jun- 2 0 2
D 19 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 20 of 57
Inspection methods, frequency, and acceptance criteria are required part of this specification and are
listed in APPENDIX I (Inspection Methods and Acceptance Criteria).
Work shall not proceed with the next step in the system sequence (i.e., surface preparation, priming,
intermediate, finish coat application) until the previous work has been inspected and approved by
Inspector.
The detail of inspection items is described in APPENDIX E and inspection report format sample is
shown in APPENDIX J (Inspection Report Form Sample).
1) Environmental conditions
2) Verification of abrasive materials
3) Compressed air quality
4) Visual examination of substrate
5) Initial surface condition
6) Surface cleanliness
7) Dust level
8) Anchor profile / Surface profile
9) Salt contamination / Conductivity test
10) Wet film thickness
11) Solvent Rub (MEK) test over Inorganic Zinc
12) Solvent Rub (MEK) test over Epoxy Coating
13) Compatibility with top coats
14) Dry film thickness
15) Visual Examination
VENDOR's standard inspection requirements are acceptable when VENDOR's standard paint system is
applied. VENDOR’s standard inspection items shall include at least visual inspection and total dry film
thickness measurement.
D M S2
-
J28-Jun- 2 0 2
D 20 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 21 of 57
The detail of inspection method and standards are described in APPENDIX I. The following list shows
the type of instrument/equipment to be used for each inspection items.
Note:
1) Other inspection instruments equal in performance to those specified may be proposed prior to use.
2) To be calibrated on certified shims and adjusted to compensate for the substrate effect. Thickness
measurements for all coatings shall be taken after removal of dry spray and overspray.
For items which have high critical rating (level 1 and 2) (Pressure vessels, piping etc.), a pre-job
meeting shall be arranged by CONTRACTOR to review CONTRACTOR's specification and
SUBCONTRACTOR's/VENDOR’s exceptions and procedures. Off the shelf items (pumps, compressor,
motors etc.) are no need to hold a pre-job meeting.
Changes to the specification made necessary by the proceedings of the pre-job meeting will be made
by CONTRACTOR, who will re-issue the revised specification to the project team and all meeting
attendees prior to the commencement of work.
14 LIST OF APPENDIX
D M S2
-
J28-Jun- 2 0 2
D 21 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 22 of 57
D M S2
-
J28-Jun- 2 0 2
D 22 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 23 of 57
APPENDIX A shall be used to determine the correct coating system for various service categories, operating
environments, and equipment types. When the correct coating system has been identified, reference the
APPENDIX B to obtain the required surface preparation, coating materials, and relevant details.
Deviation from the following coating selection tables requires approval by COMPANY’s Engineer.
Applicable service category for each coating system shall be referred to para. 6.2 of this specification.
D M S2
-
J28-Jun- 2 0 2
D 23 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 24 of 57
Category A: Uninsulated Aboveground Carbon and Low-alloy Steel Equipment, Vessels, Piping,
Piping Specialty, Stacks, and Ductwork
System
Substrate Operating Temp Coating Type
Name
Carbon Steel Ambient < T ≤ 200°F (93°C) System 1 Organic Zinc / Epoxy / Urethane
and Low-Alloy (Note 1)
Steel
200°F (93°C) < T ≤ 800°F System 4 Inorganic Zinc / High Temperature
(427°C) Silicone Aluminum (multi coats)
Note:
1) Including Vessel support such as skirt, legs, saddles without fireproofing.
Category B: Externally Insulated Aboveground Carbon and Low-Alloy Steel Equipment, Vessels,
Piping, Piping Specialty and Ductwork
System
Substrate Operating Temp Coating Type
Name
Carbon Steel Atmospheric Dew point < T ≤ System 6 Solvent-Borne Epoxy
and Low-alloy 302°F (150°C) (Note 2)
Steel
Or System 3 Thermal Spray Aluminum
(Note 1)
302°F (150°C) < T ≤ 450°F System 6 Solvent-Borne Epoxy
(232°C) (Note 3)
Or System 3 Thermal Spray Aluminum
(Note 1)
450°F (232°C) < T ≤ 800°F System 4 Inorganic Zinc / High Temperature
(427°C) Silicone Aluminum (multi coats)
Or System 3 Thermal Spray Aluminum
(Note 1)
800°F (427°C) < T System 15 Modified Silicone Primer / Silicone
(Note 4)
Note:
1) TSA shall be applicable on equipment listed on Sec. 10. Alternative option system 6 or system 4 can be
used subject for COMPANY’s Engineer approval.
2) Including Vessel support such as skirt, legs, saddles with fireproofing.
3) Including protrusions through and 6 in. (150 mm) radially on equipment beyond attachment weld.
4) To confirm with Paint Manufacturer suitability of paint material with that of the actual operating
temperature of the item / line.
D M S2
-
J28-Jun- 2 0 2
D 24 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 25 of 57
Note:
1) For color coding purposes
2) In wetted areas only
3) If approved by COMPANY’s Engineer
4) Vessel skirts and supports are not considered structural steel for the purposes of coating requirements.
5) Hot-dip galvanizing shall be according to ASTM A 123/A 123M. Unless otherwise specified by
COMPANY's Engineer, zinc used in galvanizing shall be "High Grade Zinc," Z15001 (less than 0.03% lead)
in accordance with ASTM B 6.
6) Galvanized structural steel shall not be welded or in direct contact with stainless steel equipment. These
systems shall be bolted and isolated with a solid nonmetallic strip or sheet.
D M S2
-
J28-Jun- 2 0 2
D 25 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 26 of 57
Category D: Underground Piping and Fittings and Field Welds and Repair
Category E: Underwater / Splash Zone and Marine and Land Piles and Sheet Piling
Note:
1) Obtain site and statutory restrictions regarding contaminants in water and consult Paint Manufacturer
specialist.
2) Coat from 2 ft (0.5 m) below permanent ground water level to top of piles (sheet piling), or from 5 ft (1.5 m)
below final grade to top of piles (sheet piling), whichever is less.
3) Coat from 20 ft (6 m) below the harbor bottom to top of pile or sheet pile.
4) The groove at sheet piling interlocks shall not be coated.
D M S2
-
J28-Jun- 2 0 2
D 26 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 27 of 57
Note:
1) This coating approach defines the minimum requirements for insulated stainless steel. According to NACE
SP0198, most ESCC failures occur when the metal skin temperature is in the hot range between 120 to 350
oF (50 to 175 oC). Outside of this temperature range failures are less frequent.
2) Steam tracing made of copper shall not be used on stainless equipment and not in conjunction with
aluminum foil.
3) When heat tracing is used, organic coatings must have long-term resistance to the tracer temperature, or
a spacer must be utilized.
4) TSA shall be applicable on equipment listed on Sec. 10. Alternative option system 6 can be used subject
for COMPANY’s Engineer approval
D M S2
-
J28-Jun- 2 0 2
D 27 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 28 of 57
Paint system for up to 200°F (93°C) shall be at least equivalent to paint systems in ISO 12944-5 with an
environment C-5M and the expected durability of 15 years.
Paint system for above 200°F (93°C) shall be equivalent to the paint systems specified in APPENDIX B.
For bulk carbon steel valves unified primer (Inorganic Zinc) shall be applied at VENDOR shop. Succeeding
intermediate and finish coat shall be applied at site based on its actual operating temperature condition.
Refer to Category A and B.
VENDOR will provide standard coating system, and CONTRACTOR will document rationale. This
information will be included in equipment record system (See Notes).
Note:
1) Assuming proper surface preparation and coating application, coating performance life is dependent on
the atmospheric exposure of the equipment.
2) Exposure to chemical spills, splash, fumes, or routine testing of salt water deluge systems will severely
limit performance life of "standard coating systems." Consult COMPANY’s Engineer to determine suitability
of the proposed coating system.
Category I: Remote Instrument Enclosures (RIEs), Substation Enclosures, and Small Metallic
Buildings
Note:
1) Other COMPANY and/or local building standards and design practices regarding personnel safety
associated with buildings or enclosures may apply.
D M S2
-
J28-Jun- 2 0 2
D 28 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 29 of 57
For the detail of application conditions (DFT, Surface preparation grade…etc.), Paint Manufacturer’s
technical datasheet or instruction shall be followed.
Coating System 1:
To be used in Service Categories A and C
Intended Use Items Uninsulated Carbon Steel Piping, Vessels, and Equipment for
Corrosivity Category C5-I
Application Suitable Shop, Operating Unit, or Blast yard
and Operating Installation Where VOC requirements or ambient conditions such as steel
Limits Environment temp and humidity prevent use of this system, use System 13.
Operating Ambient to 250F (120C)
Temperature Not suitable for sweating service.
Substrate Condition New steel
Type Carbon Steel or Low Alloy Steel
Notes:
1) The Wasser Corp. material is the product of choice in high humidity environments or when low steel
temperatures prevent the use of epoxy/polyurethane systems.
D M S2
-
J28-Jun- 2 0 2
D 29 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 30 of 57
D M S2
-
J28-Jun- 2 0 2
D 30 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 31 of 57
Coating System 2:
To be used in Service Category C.
Applications where abrasive blasting and/or spray application are not suitable.
Intended Use Items Touchup of System 1
Applicability Suitable Installation Shop or Operating Unit
Environment
Operating Temperature Above dewpoint to 250F (120C)
Steel Condition Repair/Refurbishment of existing coating
New or corroded steel
Method of Application Spray or brush
Substrate Type Carbon steel or Low Alloy steel
COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Surface Tolerant Epoxy Surface Tolerant Epoxy Aliphatic Polyurethane
Mastic
Carboline Carbomastic 15 Carboguard 893 SG Carbothane 133 HB
International Paint Interseal 670HS Interseal 670HS Interthane 990HS
Jotun Primastic Primastic Hardtop XP
PPG Amerlock 400 Amerlock 400 Amercoat 450
Sigma SigmaCover 650 SigmaCover 650 SigmaDur 550
Sherwin Williams Macropoxy 646 Macropoxy 646 Acrolon 218HS
Wasser Corp MC-Zinc 100 MC-Miomastic100 MC–Luster 100
D M S2
-
J28-Jun- 2 0 2
D 31 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 32 of 57
Coating System 3:
To be used in Service Categories A, B, C, and F.
Intended Use Items Insulated Piping, Vessels, Structural Steel, and
Equipment 25F to 302F (−4C to 150C).
Uninsulated Piping, Vessels, Structural Steel, and
Equipment in Wetted Areas.
Thermal Spray Aluminum (TSA)
Applicability Suitable Installation Blast yard, Shop, or Unit
Environment
Suitable Operating 25F–1000F (-4C to 538C)
Temperature
Steel Condition New or corroded
Method of Application Spray or brush
Substrate Type Carbon steel, Low Alloy steel, or Stainless Steel
General Criteria Specific guidance on issues related to surface preparation,
application, and inspection shall be included in the
specification as provided by the COMPANY’s Engineer.
COMPLYING PRODUCTS
Manufacturer Optional Seal Coat
Dampney Up to 500°F (260°C) – Thurmalox Series 200 (Aluminum and Colors Available)
Up to 1000°F (538°C) – Thurmalox Series 230 (Aluminum and Colors Available)
PPG Up to 250°F (120°C) -- Amercoat 385
Up to 1000°F (538°C) -- PSX-892HS
International Up to 225F(107C) – Interseal 670HS
Up to 500F (260C) – Intertherm 875
Up to 750F – Intertherm 751 (CSA)
Up to 1000F (538C) – Intertherm 50
Jotun Solvalitt Midtherm – Up to 500F (260C)
Solvalitt – Up to 1112F
Sherwin-Williams Up to 250F (120C) – Macropoxy 646
Up to 500F (260C) – Hi-Temp Coatings 500V
Up to 1000F (538C) – Hi-Temp Coatings 1000V
Sigma Up to 250F (120C)– SigmaCover 456
Up to 500F (260C) – SigmaTherm 350
Up to 1000F (538C) – SigmaTherm 540
Carboline Up to 250F (120C) – Carboguard 893SG (thinned as needed)
D M S2
-
J28-Jun- 2 0 2
D 32 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 33 of 57
Coating System 4:
To be used in Service Categories A and B.
Intended Use Items Bare Steel Operating between 250F (120C) and 800F
(426C)
Protrusions through insulation when a coating is not
required under insulation (continuous operation above
450F (232C)
Applicability Suitable Application Blast yard, Shop, or Operating Unit
Environment
Steel Condition Repair/Refurbishment, and New
Substrate Type Carbon steel or Low Alloy steel
COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Inorganic Zinc High Temperature Silicone High Temperature Silicone
Aluminum Aluminum
PPG Dimetcote 9 Amercoat 878 HS Amercoat 878 HS
International Paint Interzinc 22 Intertherm 50 Intertherm 50
Carboline Carbozinc 11 Series Thermaline 4700 Aluminum Thermaline 4700 Aluminum
Dampney Thurmalox 245 N/A Thurmalox 230 Series
(Available in Aluminum or
Colors)
Jotun Resist 78 Solvalitt Solvalitt
Sherwin Williams Zinc Clad II Series Hi-Temp Coatings 1000V Hi-Temp Coatings 1000V
Sigma SigmaGuard 750 SigmaTherm 540 SigmaTherm 540
D M S2
-
J28-Jun- 2 0 2
D 33 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 34 of 57
Coating System 5:
To be used in Service Category C.
Intended Use Items Structural Steel - Repair or Color Coding of Hot-dip Galvanized Steel
Applicability Suitable Blast yard, Shop, or Operating Unit
Installation
Environment
Suitable Operating Ambient to 250F (120C)
Temperature NOTE: Coatings below may be unsuitable for structural steel
attached to vessels operating above 250F.
Steel Condition New or aged galvanized (for color identification)
Damaged galvanizing
Substrate Type Carbon steel, Low Alloy steel or Galvanized steel
SOLVENT-BORNE PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Organic Zinc Epoxy - Epoxy Mastic (Gray)
International Paint Interseal 670HS - Interseal 670HS (Note 1)
PPG Amerlock 2 (Note 2) or - Amerlock 2 or Amerlock 400
Amerlock 400
Carboline Carbozinc 859 VOC - Carboguard 890
Jotun Barrier 77 - Primastic
Sherwin Williams Macropoxy 646 - Macropoxy 646
PPG SigmaZinc 109HS - SigmaShield 880
Note:
1) Interthane 990HS may be used as alternate topcoat for availability of colors.
2) Formerly Amerlock 400FD. Fast and low-temperature cure formulation.
D M S2
-
J28-Jun- 2 0 2
D 34 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 35 of 57
Coating System 6:
To be used in Service Categories B and F.
Intended Use Items Immersion Grade Organic Coating for Corrosion Under
Insulation (CUI) Protection
Insulated CS and Low Chrome Operating Continuously or
Intermittently up to 400F (204C) Steel Temperature
Applicability Suitable Installation Blast yard, Shop, or Operating Unit
Environment Application to hot steel by spray application up to max.
temp. recommended on product datasheet
Steel Condition New or corroded steel
Substrate Type Carbon steel, Low Alloy steel or stainless steel
COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Epoxy Phenolic - Epoxy Phenolic
International Paint Intertherm 228 - Intertherm 228
Carboline Thermaline 450 - Thermaline 450
Dampney Thurmalox 218 - Thurmalox 219
Hi-Temp Coatings 1027 CUI - Hi-Temp 1027
Jotun Epoxy HR - Epoxy HR
PPG Amercoat 91 - Amercoat 91
Sherwin Williams Epo-Phen - Epo-Phen
Sigma SigmaPhenguard 630 - SigmaPhenguard 635
D M S2
-
J28-Jun- 2 0 2
D 35 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 36 of 57
Coating System 7:
To be used in Service Category E.
Intended Use Items Underground steel surfaces where abrasive blast is allowed
Underwater/ Splash Zone & Piles and Sheet Piling
Thick-film Epoxy, 100% Solids
Suitable Installation Blast yard, Shop, or Operating Unit
Environment
Steel Condition New or corroded steel
Suitable Operating < 200F (93C)
Environment
Substrate Type Carbon steel or Low Alloy steel
COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Solvent free Epoxy - Solvent free Epoxy
International Paint Interzone 485 - -
Carboline Phenoline 309 (airless applic) or - Phenoline 309 or 310
Phenoline 310 (plural applic)
Sigma SigmaLine 2000 - SigmaLine 2000
D M S2
-
J28-Jun- 2 0 2
D 36 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 37 of 57
D M S2
-
J28-Jun- 2 0 2
D 37 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 38 of 57
COMPLYING PRODUCTS
PUTTY
PRIMER COAT (for profiling around TAPE WRAP OVERWRAP
bolts/uneven surfaces)
BELOW GROUND
Trenton Corp --Temcoat Fill Putty #1 Wax Tape For irregular shapes -- Trenton
Primer Poly Ply
For straight sections -- Guard
Wrap
Denso -- Denso Paste (if pipe Profiling mastic LT Tape Glass Outerwrap
is damp/wet, use Denso Paste
S105)
Polyken – Polyken #1027 Polyken #939 Mastic Polyken #980 Polyken #955 Outer Wrap
Primer Inner Wrap
ABOVE GROUND
Trenton Corp --Temcoat Fill Putty #2A Wax Tape None required
Primer
SOIL TO AIR INTERFACE
Trenton Corp --Temcoat Not needed #2A Wax Tape None required
Primer
D M S2
-
J28-Jun- 2 0 2
D 38 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 39 of 57
D M S2
-
J28-Jun- 2 0 2
D 39 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 40 of 57
Note:
1) Products are long-term UV resistant without the black PVC outerwrap. If the clear outer covering
deteriorates, the base product is unaffected. The outerwrap is for protection from underground soil stress
and mechanical damage.
2) Stopaq Wrappingband (green) and Viscotaq ViscoWrap (blue) have a clear external film which is not UV
resistant. When it degrades in sunlight, only the appearance is affected. The performance of the tape is not
affected.
3) Viscotaq EZ Wrap tape is gray and has a thin fabric outerlayer, which is long term UV resistant (for
aesthetics) or it can be painted.
D M S2
-
J28-Jun- 2 0 2
D 40 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 41 of 57
COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Hi-temp coating 1027 DTR 1027 DTR 1000VS
Dampney Thurmalox 225HD Thurmalox 225HD Thurmalox 230
D M S2
-
J28-Jun- 2 0 2
D 41 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 42 of 57
Alternative paint systems for those in APPENDIX B may be proposed if they can be demonstrated that there
is a significant cost or performance benefit for using the proposed system. In that case, it shall be submitted
to COMPANY through CONTRACTOR for approval after requirements in this section has been completed.
Cold Wall Effect NACE TM 0174 Procedure A 4200 No flaking, cracking or disbonding.
Adhesion > 70% of original
Under insulation ASTM G189 According to ASTM G189
suitability
Cathodic ASTM G8 720 Diameter of disbond shall be < 10
disbonding mm.
ASTM G42
UV Resistance BS EN 12068, Annex F Cohesive failure @ 17.5 GJ/m2
Lap shear strength BS EN 12068, Annex d
Note:
1) Table 5 from ISO 20340 shall be used as the acceptance criteria with the exception of the following:
D M S2
-
J28-Jun- 2 0 2
D 42 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 43 of 57
The proposed coating system shall be tested in accordance with the following table:
In Service Temp
Under insulation
Coating System
Edge Retention
resistance test
120C (250F)
UV resistance
230C(446F)
disbondment
Fingerprint
resistance
Thick Film
Lap shear
MSDS (1)
suitability
Cracking
Cathodic
strength
Ageing
Impact
TDS
Syst. 1
Syst. 1B
Syst. 2
Syst. 3
Syst. 4
Syst. 5
Syst. 6
Syst. 7
Syst. 10
Syst. 12
Syst. 14 (2)
Syst. 15
Note:
1) Paint Manufacturer's documentation as defined in this procedure
2) As applied to both a steel substrate and to itself (2 tests)
= required test
D M S2
-
J28-Jun- 2 0 2
D 43 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 44 of 57
D M S2
-
J28-Jun- 2 0 2
D 44 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 45 of 57
Note:
1) Finish color shall be applicable on uninsulated carbon steel surfaces only.
2) Color band shall be applied on the last 1m ~ 2m at the connection.
3) Finish color is not necessary if insulated line.
4) Finish color is applicable on aboveground firewater line only.
5) Bonnets of Bellows PRV are painted RED.
Note:
1) Egress ladders are defined as those servicing normal operating platforms.
2) All ladders on fired heaters / steam cracking furnaces and those maintenance ladders located on the sides
of towers and other vessels.
3) A 1m section of the handrail on either side of the entrance/exit to ladders and/or stairways shall be painted
yellow to aid in finding egress points during an emergency.
4) Painting not normally required on galvanized components unless for color safety identification purposes.
5) Color shown is a guide only. For actual color to be followed, refer to guidance provided in SSS-SI-310
“Identification Guidelines and Management Plan for SCDs and associated Isolation Valves”.
D M S2
-
J28-Jun- 2 0 2
D 45 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 46 of 57
D M S2
-
J28-Jun- 2 0 2
D 46 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 47 of 57
D M S2
-
J28-Jun- 2 0 2
D 47 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 48 of 57
D M S2
-
J28-Jun- 2 0 2
D 48 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 49 of 57
D M S2
-
J28-Jun- 2 0 2
D 49 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 50 of 57
Consequence/
Test Type Method Frequency Acceptance Criteria
Corrective Action
Environmental Ambient and steel Before start of each In accordance with No blasting or
Conditions temperature shift, plus a minimum specified coating
Relative humidity: twice per shift requirements
ASTM E 337 Dew
point spread
Verification of SSPC AB 1 Each 16 tons (16,000 Qualification and No blasting or
Abrasive kg), or manufacturing conformance testing coating
Materials batch, whichever is per conformance
less testing per Section 5
of SSPC AB 1
D M S2
-
J28-Jun- 2 0 2
D 50 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 51 of 57
Consequence/
Test Type Method Frequency Acceptance Criteria
Corrective Action
[*] Soluble Salts Extraction: 4 samples per 22,000 Average conductivity Steam or clean
Only if specified ISO 8502-6 (Bresle) ft2 (2000 m2) of corresponding to ≤ 30 water washing and
or requested by ISO 8502-9 surface to be coated mg/m2 retesting until
Inspector (Conductometric) entire 22,000 ft2
because of Specific location to be and maximum (2000 m2)
seating service. Or determined by conductivity test area is
(HOLD) Inspector. corresponding to ≤ 40 acceptable
Extraction: mg/m2 water soluble
SSPC GUIDE 15, salt(s).
Section 4.6
(Elcometer 130 SC
400)
Assessment:
SSPC GUIDE 15,
Section 5.3
Anchor profile Per ASTM D 4417 a) Power tool As specified Re-blasting, using
cleaning: appropriate grit
Perform at beginning size or enhanced
of shift, then at Every 4 hours if nozzle pressure.
prescribed frequency. SSPC SP11 is
required in paint OR
manufacturer’s data
sheet. Repeat power tool
surface
b) Recycled abrasive:
preparation.
Every 4 hours
c) For non-recycled
abrasive:
D M S2
-
J28-Jun- 2 0 2
D 51 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 52 of 57
Consequence/
Test Type Method Frequency Acceptance Criteria
Corrective Action
(b) Confirm epoxy for (b) Discoloration (b) Overcured
insulated surface has must be visible on the Epoxy:
not exceeded its rub cloth, or
recoat interval per Thumbnail Sweep blast using
ASTM D 5402. Unless indentation at the reduced nozzle
otherwise instructed, in center of the rub path pressure and fine
writing, by the Coating must be possible, or abrasive. Remove
Manufacturer, perform Reduction in gloss all dust.
50 double rubs using must be visually
MEK. discernable
Compatibility Apply test patch and One for each As established by the Remove
with color test per component coated Paint Manufacturer of incompatible
topcoats with Vendor standard, the overcoat(s) coating before
(With Vendor ASTM D 3359, Method except one in 25 for applying specified
Standard A or identical components system. Use liquid
Coating on stripper or SSPC
Purchased ASTM D 6677. Patch SP 11.
Equipment) may be as small as 30
(HOLD) in.2 (200 cm2).
D M S2
-
J28-Jun- 2 0 2
D 52 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 53 of 57
Consequence/
Test Type Method Frequency Acceptance Criteria
Corrective Action
Adhesion test ASTM D3359 Method 1 time per each ASTM D3359: 4B or Re-blasting and re-
B for Paint System 4, system is the Paint Manufacturer’s coating
15 minimum on the final recommendation
coat with the
ASTM D4541 for Paint following conditions ASTM D4541: min.
System 1, 1B, 2, 5, 6, for each item. pull-off force of 3MPa
7 or Paint
Structure: 1 time / Manufacturer’s
Vendor’s Standard 1,000m2, 1 time per recommendation
Paint System: week or Vendor's
Recommendation
DFT≦125μm: ASTM (CONTRACTOR's
D3359 Method B approval is needed)
Equipment: 1 time
per equipment or
100m2 in the case
the equipment is
greater than 20m2.
Valve: 1 time per 25
valves or per blasting
shift.
D M S2
-
J28-Jun- 2 0 2
D 53 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 54 of 57
Date Inspector
Project Name
Applicator Supervisor
Item No. ID No.
Ref. No. Substrate Material
D M S2
-
J28-Jun- 2 0 2
D 54 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 55 of 57
SURFACE PREPARATION
Member No. / Area Area (sq.m)
SURFACE Criteria Time
CLEANLINESS Result OK to Coat
SURFACE Criteria Time
PROFILE Result OK to Coat
SURFACE Criteria Time
DUST Result Rating Class OK to Coat
Salt level / Criteria Time
Conductivity Result OK to Coat
REMARKS
SIGNED
Inspected by Reviewed / Witnessed by Approved by
D M S2
-
J28-Jun- 2 0 2
D 55 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 56 of 57
Date Inspector
Project Name
Applicator Supervisor
Item No. ID No.
Ref. No. Substrate Material
Member No. / Area Paint System No. Area
PAINT Application
Identification 1st Coat 2nd Coat 3rd Coat 4th Coat
Applied Date / Time
Application Method
Manufacturer’s Name
Generic Type
Product Name
Batch No. / Base
/ Hardener
Color
Thinner Name
Batch No. / Thinner
Thinner Used % (Volume)
Stripe Coat
COATING Inspection
COATING THICKNESS
1st Coat 2nd Coat 3rd Coat 4th Coat
(microns)
Required DFT
1
2
Spot Measurement 3
4
5
Actual DFT
OK to Subsequent Coat
(Check)
D M S2
-
J28-Jun- 2 0 2
D 56 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 57 of 57
1st Coat
SOLVENT RUB TEST(a)
(Inorganic Zinc only)
Testing Date / Time
Solvent Name / Method Photo (Note 1)
Criteria
Result
Conform to requirement (Check)
1st Coat
SOLVENT RUB TEST(b) (Epoxy for splash
zone)
Testing Date / Time
Solvent Name / Method Photo (Note 1)
Criteria
Result
Conform to requirement (Check)
VISUAL INSPECTION 1st Coat 2nd Coat 3rd Coat 4th Coat
Testing Date / Time
Conform to requirement (Check)
ADHESION TEST
Testing Date / Time Device Name
Method (MPa for Pull-off)
Result
Mode of Failure Criteria
Conform to requirement (Check) (Cross-cut rating)
REMARKS
SIGNED
Inspected by Reviewed / Witnessed by Approved by
D M S2
-
J28-Jun- 2 0 2
D 57 / 57
RINTE
ED WHEN P
ROLL
NCONT