CONTRACTOR JOB # CONTRACTOR DOC # REV.

G-6121-00 S-0000-13A0-001
COMPANY JOB # COMPANY DOC # 2B
- CA-8230-SP-0003
DATE SHEET
23 FEB 22 1 OF 57

PREP’D NORIE BELTRAN N.B.

CHRISTOPHER SANTIAGO /
CHK’D C.S. / E.M.R.
ENRICO REYES

APP’D ONG MOIN LIAN O.M.L.

SPECIFICATION FOR PAINTING AND COLOR CODING

FOR CONSTRUCTION

EXXONMOBIL ASIA PACIFIC PTE. LTD.


METALLOCENE CATALYST EXPANSION PROJECT (MET-X)

REV. DATE ISSUE PURPOSE PREP’D CHK’D APP’D


1A 23 FEB 22 FOR APPROVAL N.B. C.S. / E.M.R. O.M.L.
2A 24 MAY 22 FOR CONSTRUCTION N.B. C.S. / E.M.R. O.M.L.
2B 23 JUNE 22 FOR CONSTRUCTION N.B. C.S. / E.M.R. O.M.L.

D M S2
-
J28-Jun- 2 0 2
D 1 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 2 of 57

TABLE OF CONTENTS
1 SCOPE ...................................................................................................................................................... 4
2 REFERENCES .......................................................................................................................................... 4
2.1 Global Practices ................................................................................................................................ 4
2.2 Project Specification .......................................................................................................................... 4
2.3 Industry Standards ............................................................................................................................ 4
2.3.1 ANSI (American National Standards Institute) ......................................................................... 4
2.3.2 ASME (American Society of Mechanical Engineers) ............................................................... 4
2.3.3 ASTM (American Society for Testing and Materials) ............................................................... 4
2.3.4 ISO (International Organization for Standardization) ............................................................... 5
2.3.5 SSPC (The Society for Protective Coatings) ............................................................................ 5
2.3.6 NACE (National Association of Corrosion Engineers) ............................................................. 6
2.3.7 RAL ........................................................................................................................................... 6
2.4 ExxonMobil Publications ................................................................................................................... 6
3 ACRONYMS AND DEFINITIONS ............................................................................................................. 7
3.1 Acronyms .......................................................................................................................................... 7
3.2 Definitions.......................................................................................................................................... 7
4 GENERAL REQUIREMENTS ................................................................................................................... 8
4.1 Paint Procedure ................................................................................................................................ 8
4.2 Extent of Painting Works ................................................................................................................... 8
4.3 Environment Condition ...................................................................................................................... 9
4.4 Safety, Health and Environment ....................................................................................................... 9
4.5 Technical Data Sheet / Material Safety Data Sheet ....................................................................... 10
5 SURFACE PREPARATION .................................................................................................................... 10
5.1 Blasting and Spraying Equipment ................................................................................................... 11
5.2 Abrasive Material ............................................................................................................................ 11
5.3 Abrasive Blasting ............................................................................................................................ 12
5.4 Power Tool Cleaning ....................................................................................................................... 12
6 PAINT APPLICATION ............................................................................................................................. 12
6.1 Paint Material Selection .................................................................................................................. 12
6.2 Paint System Selection ................................................................................................................... 13
6.3 Primer Coat Application .................................................................................................................. 13
6.4 Intermediate and Finish Coat Application ....................................................................................... 14
6.5 Film Thickness ................................................................................................................................ 14
6.6 Compatibility with Existing Paint System ........................................................................................ 14
6.7 Brush or Roller Application.............................................................................................................. 14
6.8 Bolt, Nut and Bolt Holes Subject to be painted ............................................................................... 15

D M S2
-
J28-Jun- 2 0 2
D 2 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 3 of 57

6.9 Protruding parts ............................................................................................................................... 15


7 VENDOR’S STANDARD PAINT SYSTEM ............................................................................................. 15
7.1 Items with Vendor’s standard paint system .................................................................................... 15
7.2 “Off-the-shelf” or “Stocked” item (Ready-made merchandise) ........................................................ 15
8 COLORS, SIGNAGE AND IDENTIFICATION STENCILING ................................................................. 16
8.1 Process Plant Labelling................................................................................................................... 16
8.1.1 Marker Text Guidelines .......................................................................................................... 16
8.1.2 Unit Identifiers ......................................................................................................................... 17
8.1.3 Installation .............................................................................................................................. 17
8.1.4 Equipment Identification ......................................................................................................... 17
9 GALVANIZING ........................................................................................................................................ 18
10 THERMAL SPRAY ALUMINUM (TSA)................................................................................................... 18
11 REPAIR PROCEDURE ........................................................................................................................... 18
12 STORAGE, HANDLING AND TRACEABILITY...................................................................................... 19
13 QUALITY ASSURANCE / QUALITY CONTROL ................................................................................... 20
13.1 Personnel Qualification ................................................................................................................... 20
13.2 Inspection Items .............................................................................................................................. 20
13.3 Inspection Tools .............................................................................................................................. 21
13.4 Pre-Job Meeting .............................................................................................................................. 21
14 LIST OF APPENDIX ................................................................................................................................ 21

D M S2
-
J28-Jun- 2 0 2
D 3 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 4 of 57

1 SCOPE

This project specification covers the minimum requirements for the paint material selection, surface
preparation, paint application and quality control of coatings for new construction of external surfaces of steel
structures, piping, equipment, tank, electrical and instrumentation for Metallocene Catalyst Expansion (Met-
X) Project in Jurong Island, Singapore.

This project specification does not cover the following:


Internal linings, Concrete, Indoor coatings and Maintenance coatings.

2 REFERENCES

The latest edition and/or revision of the following practices, codes, standards, and specifications shall be
used to supplement this specification.

2.1 Global Practices (relevant clauses as per Job Specification Section G)


GP 19-01-01D Paint and Protective Coatings
GP 04-06-01D Reinforced Concrete Foundations, Anchorage and Grout
MET-X SCP GII Rev. 9 General Instructions and Information (GII)

2.2 Project Specification


S-0000-13A0-002 Specification for Rust Prevention

2.3 Industry Standards

2.3.1 ANSI (American National Standards Institute)

ANSI Z400-1 Hazardous Industrial Chemicals – Material Safety Data Sheets - Preparation

2.3.2 ASME (American Society of Mechanical Engineers)


ASME B31.3 Process Piping

2.3.3 ASTM (American Society for Testing and Materials)


ASTM A123 / A123M Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron ans
Steel Products
ASTM A153 / A153M Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel
Hardware
ASTM A354 Standard Specification for Quenched and Tempered Alloy Steel Bolts,
Studs, and Other Externally Threaded Fasteners
ASTM A780 Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip
Galvanized Coatings

D M S2
-
J28-Jun- 2 0 2
D 4 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 5 of 57

ASTM B6 Standard Specification for Zinc


ASTM D3359 Standard Test Method for Measuring Adhesion by Tape Test
ASTM D4285 Standard Test Method for Indicating Oil or Water in Compressed Air
ASTM D4414 Standard Practice for Measurement of Wet Film Thickness by Notch Gages
ASTM D4417 Standard Test Method for Field Measurement of Surface Profile of Blast
Cleaned Steel
ASTM D4752 Standard Test Method for Measuring MEK Resistance of Ethyl Silicate
(Inorganic) Zinc-Rich Primers by Solvent Rub
ASTM D5402 Standard Practice for Assessing the Solvent Resistance of Organic Coatings
Using Solvent Rubs
ASTM D6677 Standard Test Method for Evaluating Adhesion by Knife
ASTM E337 Standard Test Method for Measuring Humidity with a Psychrometer (the
Measurement of Wet-and Dry-Bulb Temperatures)
ASTM G8 Standard Test Method for Cathodic Disbonding of Pipeline Coatings
ASTM G42 Standard Test Method for Cathodic Disbonding of Pipeline Coatings
Subjected to Elevated Temperatures

2.3.4 ISO (International Organization for Standardization)


ISO 4624 Paints and Varnishes – Pull-Off Test for Adhesion
ISO 12944-2 Paints and Varnishes – Corrosion Protection of Steel Structures by
Protective Paint Systems – Part 2: Classification of Environments
ISO 12944-5 Paints and Varnishes – Corrosion Protection of Steel Structures by
Protective Paint Systems – Part 5: Protective Paint Systems
ISO 8501-1 Preparation of steel substrates before application of paints and related
products – Visual assessment of surface cleanliness – Part 1: Rust grades
and preparation grades of uncoated steel substrates and of steel substrates
after overall removal of previous coatings
ISO 8502-3 Preparation of Steel Substrates before Application of Paint and Related
Products – Tests for the Assessment of Surface Cleanliness – Part 3:
Assessment of Dust on Steel Surfaces Prepared for Painting (Pressure –
Sensitive Tape Method)
ISO 8503 Preparation of Steel Substrates before Application of Paints and Related
Products – Surface Roughness Characteristics of Blast-Cleaned Steel
Substrates (all current parts)
ISO 20340 Paint and Varnishes _ Performance Requirements for Protective Paint
Systems for Offshore and Related Structures

2.3.5 SSPC (The Society for Protective Coatings)


SSPC AB1 Mineral and Slag Abrasives
SSPC AB2 Cleanliness of Recycled Ferrous Metallic Abrasives
SSPC AB3 Newly Manufactured or Re-Manufactured Steel Abrasives
SSPC PA GUIDE 3 Guide to Safety in Paint Application
SSPC PS GUIDE 8 Guide to Topcoating Zinc-Rich Primers
SSPC GUIDE 15 Field Methods for Retrieval and Analysis of Soluble Salts on Steel and Other
Nonporous Substrates
SSPC PA1 Shop, Field and Maintenance Painting

D M S2
-
J28-Jun- 2 0 2
D 5 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 6 of 57

SSPC PA2 Measurement of Dry Coating Thickness with Magnetic Gages


SSPC QP1 Standard Procedure for Evaluating Painting Contractors (Field Application to
Complex Industrial Structures)
SSPC QP3 Standard Procedure for Evaluating Qualifications of Shop Painting
Applicators
SSPC SP1 Solvent Cleaning
SSPC SP2 Hand Tool Cleaning
SSPC SP3 Power Tool Cleaning
SSPC SP5 White Metal Blast Cleaning (NACE No. 1)
SSPC SP6 Commercial Blast Cleaning (NACE No. 3)
SSPC SP10 Near White Blast Cleaning (NACE No. 2)
SSPC SP7 Joint Surface Preparation Standard Brush-Off Blast Cleaning (NACE No. 4)
SSPC SP8 Pickling
SSPC SP11 Power Tool Cleaning to Bare Metal
SSPC VIS 1 Guide and Reference Photographs for Steel Surfaces Prepared by Dry
Abrasive Blast Cleaning
SSPC VIS 3 Visual Standard for Power-and Hand-Tool Cleaned Steel (Standard
Reference Photographs)

2.3.6 NACE (National Association of Corrosion Engineers)


NACE RP0287 Field Measurement of Surface Profile of Abrasive Blast Cleaned Steel
Surfaces Using a Replica Tape
NACE RP0375 Field-Applied Underground Wax Coating Systems for Underground
Pipelines: Application, Performance and Quality Control
NACE SP0169 Control of External Corrosion on Underground or Submerged Metallic Piping
Systems
NACE SP0188 Discontinuity (Holiday) Testing of New Protective Coatings on Conductive
Substrates
NACE SP0198 Control of Corrosion Under Thermal Insulation and Fireproofing Materials –
A Systems Approach

2.3.7 RAL
RAL Classic RAL (Reichsausschuß für Lieferbedingungen und Gütesicherung)
colors are used for information defining standard colors for varnish, powder
coating and plastics.

2.4 ExxonMobil Publications

SSS-IH-410 Painting and Coating Guideline


SSS-SI-310 Identification Guidelines and Management Plan for SCDs and Associated
Isolation Valves

D M S2
-
J28-Jun- 2 0 2
D 6 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 7 of 57

3 ACRONYMS AND DEFINITIONS

3.1 Acronyms
ACQPA Association for Certification and Qualification for Anticorrosive Paintwork
CUI Corrosion Under Insulation
DFT Dry Film Thickness (of a fully cured coating material or system)
FBE Fusion-Bonded Epoxy
IOZ Inorganic Zinc
ITP Inspection and Test Plan
MEK Methyl Ethyl Ketone
MIO Micaceous Iron Oxide
MSDS Material Safety Data Sheet
PPE Personal Protective Equipment
QA Quality Assurance
QC Quality Control
RIE Remote Instrument Enclosure
SHE Safety, Health and Environment
TSA Thermal Spray Aluminum
VOC Volatile Organic Compound
WFT Wet Film Thickness

3.2 Definitions
COMPANY ExxonMobil Asia Pacific Pte. Ltd.
CONTRACTOR JGC Asia Pacific Pte. Ltd.
SUBCONTRACTOR The company that performs surface preparation and coating application at
the project site.
VENDOR Awarded Bidder who is selected and employed by CONTRACTOR to supply
the designated Equipment / Materials
Project Metallocene Catalyst Expansion Project (Met-X)
Project Site Jurong Island, Singapore
COMPANY’s Engineer A designated ExxonMobil subject matter expert on coatings.
Inspector COMPANY or CONTRACTOR representative assigned to provide quality
assurance inspection
PAINT Manufacturer of coating materials / products
MANUFACTURER
Coating System Design The maximum of normal operating, steam-out, or upper-end cyclic
Temperature temperature.
Original Equipment Equipment, such as machinery and other specialty items, which typically
Manufacturer (OEM) receive VENDOR’s Standard Coating System at the location of VENDOR.

D M S2
-
J28-Jun- 2 0 2
D 7 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 8 of 57

4 GENERAL REQUIREMENTS

4.1 Paint Procedure

SUBCONTRACTOR/VENDOR shall submit the detailed Paint Procedure prior to execution of painting
work. The Paint Procedure shall at least include the following;
a. Acknowledgement of, and exceptions to, the technical specification provided by CONTRACTOR.
b. Coating materials to be used and their technical data sheets.
c. Copy of a functioning Quality Control (QC) Plan. The plan shall include the following:
i. QC inspection – details regarding the extent of and by whom it will be provided
ii. Qualifications of SUBCONTRACTOR’s QC personnel, detail of responsibilities, and chain of
command.
iii. The following minimum QC hold points: immediately prior to surface preparation, immediately
prior to coating application, following application of each coat, and following the cure of the
coating. (Inspection and Test Plan)
d. Inspection items following APPENDIX E. (Inspection Methods and Acceptance Criteria) for the
items painted at VENDOR shop with VENDOR’s standard paint system, VENDOR standard
inspection requirement can be utilized provided all relevant inspection items were reported.
e. Paint Inspection Form
f. Measuring Point Map of Film Thickness, if applicable

4.2 Extent of Painting Works

All uninsulated and insulated carbon steel and low alloy surfaces of the following shall be painted;
a. Steel structure, equipment and piping
b. Skid mounted package equipment
c. Purchased equipment
d. Rotary machineries
e. Electrical and Instrumentation items

The following metallic and non-metallic surfaces does not require painting unless otherwise specified;
a. Non-ferrous metal surfaces
b. All uninsulated stainless steel surfaces
c. Galvanized steel surfaces except for safety color identification purposes
d. Finished metals such as aluminized steel, bronze and similar metals
e. Internal surface of equipment, piping and bolt thread, except required by the data sheet
f. Screwed items of valves, gasket surfaces, etc.
g. Finished machined parts such as flange surface
h. Surface used for identification, nameplates, serial number plates, valve identification signs, gauge
glasses, guards, gauge faces, light fixtures, valve stems and flange bolts

D M S2
-
J28-Jun- 2 0 2
D 8 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 9 of 57

i. Under side of bottom plate of tanks on concrete slab


j. Thin wall alloy bellows.
k. Metallic and nonmetallic insulation jacketing
l. Concrete structures, building brick, masonry units, asbestos cement surfaces and wall tile
m. Plastic and plastic-coated materials
n. Mirror-finished stainless steel sliding plate
o. Gratings
p. Surface of orifice plate, spectacle blank, paddle spacer and paddle blank

4.3 Environment Condition

Surface preparation and paint application shall NOT be performed under any of the following conditions;

a. Relative humidity is greater than 85%. For inorganic zinc primer, relative humidity is less than 50%
or Paint Manufacturer’s recommendation.
b. The surface is wet/sweat/condensed.
c. Surface temperature is less than 3 °C above dew point.
d. Air and metal surface temperature is exceeded or below Paint Manufacturer’s recommendation.
e. Without appropriate artificial light during night or in the dark (inside Tank, Vessels, etc.).
f. Condition of strong or gusty winds or of poor visibility

4.4 Safety, Health and Environment

Environmental rules and regulations shall be met.

All personnel shall be provided with appropriate PPE (Personnel Protective Equipment), e.g., protective
clothing, safety glasses, safety shoes, hard hats, goggles, respirators, earplugs, fresh-airfed hood and
any other necessary safety equipment.

All safety equipment shall be maintained properly. Adequate warning signs shall be prominently
displayed at all access points to areas and barricaded appropriately where abrasive blasting and
painting is in progress. Always mix paints; and clean brushes/rollers and other equipment used in
painting, in well-ventilated, non-enclosed areas and at least 6 meters from confined space entry and all
air intakes locations.

For outdoor spray painting, barricade or rope off an area whereby air-borne levels of the paint
components, outside this barricade, are below their exposure limits; or at a minimum distance of 7.5m
(25 feet) from spray application area. Handling and disposal of hazardous waste resulting from the
painting activities shall be in accordance with regulations.

Regular housekeeping on daily and weekly basis shall be mandatory.

All layers of a paint system and all abrasive blasting materials shall comply with any local and/or
regional standards or regulations. Paints and coatings containing lead, cadmium & chromium are not

D M S2
-
J28-Jun- 2 0 2
D 9 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 10 of 57

allowed for use at Singapore Manufacturing Site. Any paint system shall fully comply with any local
and/or regional air quality or Volatile Organic Compounds (VOC) levels or emission standards or
regulations.

SUBCONTRACTOR/VENDOR shall protect all equipment, structures and any other areas from
mechanical damage, environmental damage, damage caused by over blasting, dripping paint, paint
splashes and overspray.

4.5 Technical Data Sheet / Material Safety Data Sheet

SUBCOTRACTOR/VENDOR to provide latest edition of all technical data sheet and material safety data
sheets. The material safety data sheet must be readily available at site where painting works is
executed.

5 SURFACE PREPARATION

Before abrasive blasting, all equipment parts which may be damaged by blast, dust, or particulate matter
shall be suitably protected by wrapping, taping or other means to prevent damage. This equipment shall
include but not necessarily be limited to the following;

Bearings Lubrication Fittings


Conduit Machined Surfaces
Control Valves Nameplates
Equipment Shaft Couplings Packing Glands
Fire system Sprinkler Heads Screws
Flange Facings Seals
Glass Shafts
Instrument Dials Spring Hanger Graduations
Linkages Valve Stems

Prior to the start of work, SUBCONTRACTOR/VENDOR shall verify all surfaces to be coated as being free of
oil, grease, dirt, burrs, slivers, undercut welds, excessive weld porosity, and visible salt contamination.
All weld joints requiring hydrotesting and/or sensitive leak test must be completed prior to any surface
preparation and coating application.

Adjacent area of welding shall be cleaned to prevent sharp rough areas and free from slag, spatter, flux
residue.

All openings including those that area flanged or threaded shall be sealed to prevent entry of blast abrasives.

D M S2
-
J28-Jun- 2 0 2
D 10 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 11 of 57

5.1 Blasting and Spraying Equipment


COMPANY's approval is required prior to working abrasive blasting on live or pressurized equipment.

SUBCONTRACTOR/VENDOR is responsible for the provision and maintenance of properly sized


equipment, tools, and supplies necessary to perform surface preparation, paint application, QC, and
environmental control as covered in the technical specification or approved procedure.

SUBCONTRACTOR/VENDOR shall provide the following to the point of use: compressed air, coolers,
moisture traps, etc. as necessary to provide clean, dry air of sufficient quantity and pressure at the
nozzle to achieve the specified surface preparation or paint application.

Oil and water traps, automatic drains, and after-coolers on compressed air supply systems shall be
checked and drained at the beginning of each shift as a minimum, and more frequently if required, to
maintain quality of the air source.

5.2 Abrasive Material

The abrasive material shall be selected from the following.

Type Generic name Standard

Metallic Iron grit ISO 11124-2

Steel grit ISO 11124-3

Natural Mineral Staurolite ISO 11126-9

Garnet ISO 11126-10

Synthetic Mineral Coal slag ISO 11126-4

Aluminum oxide ISO 11126-7

Other abrasive material may be proposed subject for COMPANY’s approval.

Steel grit or shot shall not be used for stainless, galvanized and non-ferrous metal surface.

Abrasive materials shall be free from oil, grease, dust, salts, chloride and other impurities. The particle
size shall be suitable to give the required surface profile / roughness recommended by Paint
Manufacturer as stated on the technical data sheet. Sand shall not be used as abrasive for surface
cleaning.

Abrasive must be capable of providing a sharp, dense angular profile of the specified depth.

Recycled abrasive may be used only in blast rooms where automated dust removal equipment exists.

SUBCONTRACTOR must obtain an analysis certificate of the blast media for each batch of blast media
to be used, which, as a minimum, indicates the batch number, the media's gradation, and chloride
levels. The media shall comply with the requirements of SSPC AB 1.

D M S2
-
J28-Jun- 2 0 2
D 11 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 12 of 57

5.3 Abrasive Blasting


SUBCONTRACTOR/VENDOR shall refer to Paint Manufacturer's technical data sheet as the source of
information for the recommended methods and grades of surface preparation for any given coating
system type and service category.

Surface preparation shall achieve the required standards immediately prior to priming.

All blast cleaned surfaces shall be primed before visible re-rusting occurs or within four (4) hours of the
commencement of blasting. If visible re-rusting occurs or more than four (4) hours elapse, then the
metal surfaces shall be lightly re-blasted and where necessary washed to remove rust blooming and
accumulation of soluble salts.

When steel grit and shot abrasive is used, routine and frequent addition of grit to the grit/shot mixture is
necessary to achieve a sharp, dense angular profile of the specified depth. The minimum grit/shot ratio
shall be 65%. Blast media consisting solely of steel shot is prohibited.

The surface roughness / surface profile after abrasive blasting shall be in accordance with Paint
Manufacturer recommendation as stated on its technical data sheet.

5.4 Power Tool Cleaning


Power tool cleaning is acceptable in areas where abrasive blasting is not suitable and where the tools
and techniques used provide a sharp, angular profile of the specified depth and level of cleanliness.
SUBCONTRACTOR/VENDOR shall submit for CONTRACTOR / COMPANY approval any power tool to
be used. COMPANY’s Engineer shall be notified of any areas that are not accessible for blasting.

If the power tool used is air-powered, then the area must be solvent wiped to ensure that the tool did not
contaminate the surface with oil through worn seals.

Any surrounding coating shall be feather etched for a minimum overlap of 2 in. (50 mm).

6 PAINT APPLICATION

6.1 Paint Material Selection

Coating materials specified in APPENDIX B (Coating System Descriptions and Accepted Coatings)
shall be used. Alternative paint systems for those in APPENDIX B may be proposed if they can be
demonstrated that there is a significant cost or performance benefit for using the proposed system. In
that case, it shall be submitted to COMPANY through CONTRACTOR for approval after requirements in
APPENDIX C (Test Requirements and Acceptance Criteria for Coating Qualification) has been
completed.

D M S2
-
J28-Jun- 2 0 2
D 12 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 13 of 57

6.2 Paint System Selection

APPENDIX A (Coating System Selection Table) of this specification shall be used to select coating
systems. Tables in APPENDIX A are provided for each of the following service categories.

Category A: Uninsulated aboveground carbon and low-alloy steel equipment, vessels, piping,
piping specialty, stacks, and ductwork
Category B: Externally insulated aboveground carbon and low-alloy steel equipment, vessels,
piping, piping specialty and ductwork
Category C: Aboveground structural steel and repair of galvanizing
Category D: Underground piping and fittings and field welds and repair
Category E: Underwater / splash zone and marine and land piles and sheet piling
Category F: Stainless steel Equipment, Vessels, Piping, Piping Specialty
Category G: Purchased equipment (OEM) – Machinery, Motors, Instruments, Transformers,
Tagged Valves, Bulk Valves, Fire Fighting Equipment, etc.
Category I: Remote instrument enclosures (RIEs), substation enclosures, and small metallic
buildings

Appropriate paint system shall be selected considering the maximum operating temperature and/or
steam-out temperature condition of the equipment and piping.

6.3 Primer Coat Application


All blasted surfaces shall be primed prior to the onset of oxidation discoloration, and within four (4)
hours of the blasting operation. Primer application shall be completed before sunset. In case this is
difficult or impractical, application shall be proceeded under the appropriate artificial light.

1) Primer shall be uniform thickness, especially at welds, edges, and corners free of mud cracking.
2) Primer coat shall not be brick red or rust colored.
3) Primer shall not be applied within 4 in. (100 mm) of unblasted surfaces or edges to be welded.
4) Primers except for IOZ when required by Paint Manufacturer, shall be applied using an agitated
pot.
5) Application of Inorganic Zinc Primer (IOZ)

During the application of inorganic zinc primer, a continuous mixing device shall maintain the
pigment in suspension. Unless there is no alternative, inorganic zinc shall not be applied with
roller or brush. IOZ shall have dry spray removed with wire screen and shall be confirmed as
sufficiently cured according to the methyl ethyl ketone (MEK) rub test per Paint Manufacturer's
instructions before top coating.

When intermediate or finish coat is applied over fresh inorganic zinc primer, a “mist” coat shall
be applied first to displace all air entrapped on the surface of inorganic zinc. Epoxy or silicone
paint which would be applied over inorganic zinc shall be thinned by appropriate thinner and

D M S2
-
J28-Jun- 2 0 2
D 13 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 14 of 57

applied as “mist” coat. The percentage of thinning shall be in accordance with Paint
Manufacturer’s recommendation.

White rust that has formed during the intervening period shall be removed in accordance with
Paint Manufacturer's instructions prior to over-coating.

6.4 Intermediate and Finish Coat Application


Each coat of a multi-coat system shall be a contrasting color to indicate the extent of coverage.

A uniform spray application on large surfaces for priming, intermediate and finish coating shall be
obtained by 50 percent overlapping vertical passes followed by 50 percent overlapping horizontal
passes.

Contaminations shall be minimized by applying succeeding coats within the time period recommended
by Paint Manufacturer. If contaminants are present, they shall be removed before applying the
subsequent coat. The blasted surface, primer coat, intermediate coat and finish coat shall be examined
for dirt and dust prior to application of additional coats.

6.5 Film Thickness


Wet film thickness (WFT) shall be checked during the application of each coat to assure the specified
dry film thickness (DFT) is achieved. The dry film thickness (DFT) of each coat shall be within the
specified range indicated on Paint Manufacturer’s technical data sheet. Dry film thickness (DFT) shall
be measured in accordance with SSPC PA2.

6.6 Compatibility with Existing Paint System


Before any painting work is commenced, the compatibility with existing paint systems or layers shall be
checked. Paint Manufacturer shall be consulted if required. If there is any doubt about compatibility, the
compatibility test shall be conducted to evaluate the inter-coat adhesion. The procedure shall be
proposed prior to any test commencement for CONTRACTOR / COMPANY’s approval.

6.7 Brush or Roller Application


Where spray application is impractical due to the configuration of the item and/or overspray on adjacent
surfaces being concerned, coatings should be applied by roller or brush following Paint Manufacturer’s
recommendation.

All edges, corners, fillet welds and other areas where grinding is not possible and all other sharp edges
and protrusions shall be stripe coated with one additional coat of brush applied primer.

Coating applications on inaccessible area to perform spray application, shall be brush applied to reach
the specified dry film thickness.

D M S2
-
J28-Jun- 2 0 2
D 14 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 15 of 57

6.8 Bolt, Nut and Bolt Holes Subject to be painted

Carbon steel or low alloy steel anchor bolts specified in GP 04-06-01, ASTM A 354 Grade BC high-
strength bolts may be hot-dip galvanized. High-strength bolting that should not be galvanized may be
coated by mechanical galvanizing or with an IOZ rich primer. No other bolting requires coating.

6.9 Protruding parts


A coating system, appropriate for the operating temperature, must be applied to all metal surfaces, such
as nozzles, supports, and attachments, which extend outside the insulation. The coating system shall
be provided for the protrusion and 6 in. (150 mm) radially on the equipment from the protrusion
attachment weld.

When a full coating system is specified for under the insulation, the coating on the protrusion may be
the same as that under the insulation.

7 VENDOR’S STANDARD PAINT SYSTEM

7.1 Items with Vendor’s standard paint system

The following items shall be painted by VENDOR at their shop with their standard paint system:

Purchased Equipment (OEM): Machinery, Motors, Instruments, Transformers, Tagged Valves, Bulk
Valves, Fire Fighting Equipment, etc.

The VENDOR's standard paint system shall be approved by CONTRACTOR/COMPANY and shall
comply with the following:

1. The paint system for up to 200°F (93°C) shall be at least equivalent to paint systems in ISO 12944-
5 with an environment C-5M and the expected durability of 15 years.
2. The paint system above 200°F (93°C) shall be equivalent to the paint systems specified in
APPENDIX B.
3. The finish color shall be in compliance with APPENDIX D (Color Schedule).

VENDOR 's standard inspection requirements can be applied. The minimum requirements for
VENDOR's standard inspection are shown in para. 13.2.

7.2 “Off-the-shelf” or “Stocked” item (Ready-made merchandise)


Off-the-shelf items or stocked items are the catalogue items which are not practical to apply reference
international code/standards of painting, VENDOR standard can be applied for paint system, finish color
and the inspection. VENDOR's standard paint system shall be submitted for CONTRACTOR’s review.
The examples of these items are as follows;

D M S2
-
J28-Jun- 2 0 2
D 15 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 16 of 57

Instruments Solenoid valves


Sensors Limit Switches
Proximity Switches Hydraulic Oil Unit
Oil Mist Lubrication Unit Workshop Equipment and Tools
Material Handling Equipment Machinery
None-slam Check Valve Pressure Relief Valve

Strainer Ejector etc.

8 COLORS, SIGNAGE AND IDENTIFICATION STENCILING

8.1 Process Plant Labelling

Markers for process lines shall have the pipe contents printed on the top line and the line number and
appropriate FROM / TO information on the second line of each marker. All process line markers shall
have a flow direction arrow.
The text format shall be as follows:

Markers for utility lines shall have pipe contents printed on them with flow direction only, no FROM / TO
information unless specifically requested.
Markers placement parameters and sign specifications are summarized on the following COMPANY
drawings;
a. ZX-141-0100 (SCP Process Labelling Standard) as shown on APPENDIX E
b. ZX-141-0101 (SCP Process Labelling Standard) as shown on APPENDIX F
c. ZX-141-0102 (SCP Process Labelling Standard - Sign Details) as shown on APPENDIX G

8.1.1 Marker Text Guidelines

Pipe / Line contents, or the LEGEND, should state the hydrocarbons/chemicals/utilities involved.
In addition, other useful information for the operator should be included, such as:
- NNF (for normally no flow) B31
- INERT C4 FOR STARTUP
- C2=ERC LEVEL PULLDOWN
- HEAVIES PURGE (BUNDLE SIDE)
- PGC 5th STG KICKBACK
etc.
Notes:
1) Where this type of information requires more than 4 to 5 words it may be difficult to get on a
label and in that case a sign should be used instead.

D M S2
-
J28-Jun- 2 0 2
D 16 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 17 of 57

2) Legend names should be checked to ensure they are consistent with names used in
operating manuals and procedures.

The FROM / TO information, on the 2nd line, will usually be the equipment number(s). However,
where specific “jargon” or common names are desired they can be used. For example, “TO
FURNACE AREA” or “FROM BOILERS”, “FROM SEPARATOR #1”, may be more informative
than the associated equipment numbers. In particular, this type of designation should be used to
help ensure that the line labeling is consistent with any designations and/or common names
used in the operating procedures.

8.1.2 Unit Identifiers

Markers should include “unit identifiers” if there are parallel or multiple units/trains/blocks/skids,
etc., with the same processing purpose, as in steam cracking furnaces, parallel/space driers or
reactors or any parallel unit operations. These type of markers help the operator to quickly
recognize what unit he is on, particularly where the parallel or multiple pieces of equipment are
almost identical in design/layout.

These labels can skip the TO or FROM information if it is the same as the unit identifier.

8.1.3 Installation

All pipe markers/labels and signs shall be installed using proven materials and techniques, as
per Marking Services, Inc. standard or equivalent. Installation must be completed such that no
sharp edges or projections are exposed.
Attachment of labels or signs with twisted wire is not acceptable for permanent installations.
Markers which will be on hot lines (over 120 oC) must be noted on the spreadsheet. These labels
will be provided with a stainless steel carrier with insulation/air gap to keep heat off the label
itself.

8.1.4 Equipment Identification

Equipment will be identified by tag number and description. These will be stencilled letters and
number using industrial quality black paint.
Stencil size and placement parameters for various pieces of equipment are shown in APPENDIX
H: ZX-141-0102 (SCP Process Labelling Standard – Equipment Identification)

D M S2
-
J28-Jun- 2 0 2
D 17 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 18 of 57

Finish color schedule for structure, equipment and piping are shown on APPENDIX D (Color Schedule).

9 GALVANIZING

Galvanizing on forged steel shapes, such as plate, castings, bars and strips shall be according to
ASTM A 123/A 123M or equivalent. Galvanizing on threaded fasteners shall be according to ASTM A
153/A153M or equivalent. Unless waived by COMPANY, zinc for galvanizing shall be in accordance with
ASTM B 6, "High grade zinc," which contains a maximum of 0.03% lead and 0.01% cadmium.

10 THERMAL SPRAY ALUMINUM (TSA)

Thermal Spray Aluminum (TSA) shall be applicable on the following equipment.

Equipment Item No. Equipment Name


CAD - 001 Premix Vessel
CAD - 007 Entrainment Separator
CAD - 017 Liquid Knock Out Tank
CAFIL - 014 Isopentane Wash Filter
CAE - 001 Tempered Water Heater

The COMPANY's Engineer shall supply a job specification that establishes the criteria for
SUBCONTRACTOR/VENDOR qualification, surface preparation, application, and inspection of Thermal
Spray Aluminum (TSA).

Arc spray or flame spray equipment may be used.

The thermal spray wire shall be 99% Al, conforming to AWS C2.25/C2.25M, C2.25 Classification W-AL-1100
(UNS No. A91100). The Manufacturer or Supplier shall provide a certificate of conformance for each batch
supplied.

Except for Category D Fluid Service as defined by ASME B31.3,

11 REPAIR PROCEDURE

Paint surface irregularities not to reach the substrate, such as runs, sags, blemishes, blisters or dry spray in
the coating shall be removed and affected area repaired by subsequent paint material.

D M S2
-
J28-Jun- 2 0 2
D 18 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 19 of 57

If coating damage has occurred exposing steel, then the area shall be spot-blast cleaned (vacuum blast is
acceptable) or power tool cleaned to restore the exposed steel to the originally specified degree of
cleanliness.

Adjacent coating shall be feathered back approximately 2 in. (50 mm) to form a uniform etched surface. The
prepared surface shall be free of loose, lifting, burned, or blistered coating.

If the coating thickness is deemed to be outside of Paint Manufacturer's permissible DFT (range, i.e., too
high or too low) the final overall coating thickness shall be adjusted to be within the prescribed range. Follow
Paint Manufacturer's recommended steps in rectifying the overall coating thickness.

Paint materials suitable for touch-up are covered on the coating system sheets included in APPENDIX B. For
galvanized steel, it shall be repaired by using Solvent-Borne Zinc-Rich Epoxy and Epoxy Mastic (System 5).

12 STORAGE, HANDLING AND TRACEABILITY

Compliance with Paint Manufacturer instructions and technical data sheets:

SUBCONTRACTOR shall comply with all requirements of Paint Manufacturer's most recent application
instructions and technical data sheets. This includes storage, straining, mixing, thinning, pot agitation,
application, and recoat intervals of coatings.

Coating materials shall be maintained in the original unopened containers prior to use, free from damage
and with complete labeling. All containers shall be legibly labeled throughout the duration of the job. Any
container on which labeling has been damaged or removed shall not be used and must be removed at site.
First-in first-out basis on coating material usage must be applied at all times.

1) Paint material Storage, Handling, and Traceability


Paint and solvent materials must be transported and stored in accordance with Paint Manufacturer's
recommendations. Manufacture batch numbers shall be recorded and documented for all paints and
solvents.

2) Mixing and Thinning


New or original containers: All mixing shall be done in containers provided by Paint Manufacturer or in
clean, new containers that have not been previously used.

Partial kit mixing is not permitted: For touch-up purposes, mixing of small amounts is permissible only
when precise measuring of components is witnessed by Inspector.

D M S2
-
J28-Jun- 2 0 2
D 19 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 20 of 57

13 QUALITY ASSURANCE / QUALITY CONTROL

13.1 Personnel Qualification


When coatings will be underground, underwater, marine, or chemical exposure, Inspector shall be a
certified NACE International Coating Inspector or COMPANY-approved equivalent.

13.2 Inspection Items


For painting work including surface preparation, priming, intermediate and finish painting by
SUBCONTRACTOR/VENDOR except for VENDOR's standard paint system, the following inspection
requirements shall be followed as minimum which are subject to be approved by CONTRACTOR.

Inspection methods, frequency, and acceptance criteria are required part of this specification and are
listed in APPENDIX I (Inspection Methods and Acceptance Criteria).

Work shall not proceed with the next step in the system sequence (i.e., surface preparation, priming,
intermediate, finish coat application) until the previous work has been inspected and approved by
Inspector.

The detail of inspection items is described in APPENDIX E and inspection report format sample is
shown in APPENDIX J (Inspection Report Form Sample).

1) Environmental conditions
2) Verification of abrasive materials
3) Compressed air quality
4) Visual examination of substrate
5) Initial surface condition
6) Surface cleanliness
7) Dust level
8) Anchor profile / Surface profile
9) Salt contamination / Conductivity test
10) Wet film thickness
11) Solvent Rub (MEK) test over Inorganic Zinc
12) Solvent Rub (MEK) test over Epoxy Coating
13) Compatibility with top coats
14) Dry film thickness
15) Visual Examination
VENDOR's standard inspection requirements are acceptable when VENDOR's standard paint system is
applied. VENDOR’s standard inspection items shall include at least visual inspection and total dry film
thickness measurement.

D M S2
-
J28-Jun- 2 0 2
D 20 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 21 of 57

13.3 Inspection Tools

The detail of inspection method and standards are described in APPENDIX I. The following list shows
the type of instrument/equipment to be used for each inspection items.

Inspection Items Tools (Note 1)


Environmental Thermometer and Hygrometer
Condition e.g. Gardner Certified Hygrometer and Temperature Indicator
Surface Cleanliness Pictorial Standard
e.g. SSPC-VIS 1
Dust Level Transparent tape / White paper
Surface Profile Surface Profile Comparator
e.g. Keane-Tator Surface Profile Comparator
Replica Tape
e.g. Testex tape X coarse
Salt Contamination Bresle Salt Kit and Conductivity Meter
Wet Film Thickness Wet Film Combs Gauge
e.g. Nordson Wet Film Thickness Gauge
Dry Film Thickness Electromagnetic Gauge
e.g. Micro Test Dry Film Thickness Gauge
Type 2 gauges (equal to Positector 6000 FN-memory version) (Note 2)
Adhesion Test Mechanical/Hydraulic/Pneumatic Pull Off Adhesion Tester
Cross-Hatch Adhesion Tester
Holiday Test Holiday Tester

Note:

1) Other inspection instruments equal in performance to those specified may be proposed prior to use.

2) To be calibrated on certified shims and adjusted to compensate for the substrate effect. Thickness
measurements for all coatings shall be taken after removal of dry spray and overspray.

13.4 Pre-Job Meeting

For items which have high critical rating (level 1 and 2) (Pressure vessels, piping etc.), a pre-job
meeting shall be arranged by CONTRACTOR to review CONTRACTOR's specification and
SUBCONTRACTOR's/VENDOR’s exceptions and procedures. Off the shelf items (pumps, compressor,
motors etc.) are no need to hold a pre-job meeting.

Changes to the specification made necessary by the proceedings of the pre-job meeting will be made
by CONTRACTOR, who will re-issue the revised specification to the project team and all meeting
attendees prior to the commencement of work.

14 LIST OF APPENDIX

APPENDIX A: COATING SYSTEM SELECTION TABLE

D M S2
-
J28-Jun- 2 0 2
D 21 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 22 of 57

APPENDIX B: COATING SYSTEM DESCRIPTION AND ACCEPTED COATINGS


APPENDIX C: TEST REQUIREMENTS AND ACCEPTANCE CRITERIA FOR COATING QUALIFICATION
APPENDIX D: COLOR SCHEDULE
APPENDIX E: ZX-141-0100 (SCP PROCESS LABELLING STANDARD)
APPENDIX F: ZX-141-0101 (SCP PROCESS LABELLING STANDARD)
APPENDIX G: ZX-141-0102 (SCP PROCESS LABELLING STANDARD – SIGN DETAILS)
APPENDIX H: ZX-141-0103 (SCP PROCESS LABELLING STANDARD – EQUIPMENT IDENTIFICATION)
APPENDIX I: INSPECTION METHODS AND ACCEPTANCE CRITERIA
APPENDIX J: INSPECTION REPORT FORM SAMPLE

D M S2
-
J28-Jun- 2 0 2
D 22 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 23 of 57

APPENDIX A: Coating System Selection Table

APPENDIX A shall be used to determine the correct coating system for various service categories, operating
environments, and equipment types. When the correct coating system has been identified, reference the
APPENDIX B to obtain the required surface preparation, coating materials, and relevant details.

Deviation from the following coating selection tables requires approval by COMPANY’s Engineer.

Applicable service category for each coating system shall be referred to para. 6.2 of this specification.

Table 1: Coating System Legend

System Service Corrosivity


Coating Type
Name Category Category
System 1 Organic Zinc/Epoxy/Urethane A; C C5-I
System 1B Zinc-Rich Epoxy/Epoxy C C3
System 2 Epoxy Mastic/Epoxy/Urethane C All
System 3 Thermal Spray Aluminum (TSA) B; C, F All
System 4 Inorganic Zinc/High Temperature Silicon Aluminum (multi- A; B All
coats)
System 5 Solvent-Borne Zinc-Rich Epoxy/Epoxy Mastic C All
System 6 Solvent-Borne Epoxy B; F All
System 7 100%-Solids Epoxy D, E All
System 10 Aluminum Foil F All
System 12 Wax Tape / Tape Wrap D All
System 14 Viscoelastic Tape D, E All
System 15 Modified Silicone Primer/Silicone A; B All

D M S2
-
J28-Jun- 2 0 2
D 23 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 24 of 57

Category A: Uninsulated Aboveground Carbon and Low-alloy Steel Equipment, Vessels, Piping,
Piping Specialty, Stacks, and Ductwork

System
Substrate Operating Temp Coating Type
Name
Carbon Steel Ambient < T ≤ 200°F (93°C) System 1 Organic Zinc / Epoxy / Urethane
and Low-Alloy (Note 1)
Steel
200°F (93°C) < T ≤ 800°F System 4 Inorganic Zinc / High Temperature
(427°C) Silicone Aluminum (multi coats)

Note:
1) Including Vessel support such as skirt, legs, saddles without fireproofing.

Category B: Externally Insulated Aboveground Carbon and Low-Alloy Steel Equipment, Vessels,
Piping, Piping Specialty and Ductwork

System
Substrate Operating Temp Coating Type
Name
Carbon Steel Atmospheric Dew point < T ≤ System 6 Solvent-Borne Epoxy
and Low-alloy 302°F (150°C) (Note 2)
Steel
Or System 3 Thermal Spray Aluminum
(Note 1)
302°F (150°C) < T ≤ 450°F System 6 Solvent-Borne Epoxy
(232°C) (Note 3)
Or System 3 Thermal Spray Aluminum
(Note 1)
450°F (232°C) < T ≤ 800°F System 4 Inorganic Zinc / High Temperature
(427°C) Silicone Aluminum (multi coats)
Or System 3 Thermal Spray Aluminum
(Note 1)
800°F (427°C) < T System 15 Modified Silicone Primer / Silicone
(Note 4)

Note:
1) TSA shall be applicable on equipment listed on Sec. 10. Alternative option system 6 or system 4 can be
used subject for COMPANY’s Engineer approval.
2) Including Vessel support such as skirt, legs, saddles with fireproofing.
3) Including protrusions through and 6 in. (150 mm) radially on equipment beyond attachment weld.
4) To confirm with Paint Manufacturer suitability of paint material with that of the actual operating
temperature of the item / line.

D M S2
-
J28-Jun- 2 0 2
D 24 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 25 of 57

Category C: Aboveground Structural Steel and Repair of Galvanizing Structural Steel

Substrate Condition Surface Temp System Name Coating Type


Galvanized Unfireproofed T≤ 248°F (120°C) No coating ---
Steel
System 5 (Note 1) Solvent-Borne Zinc-Rich Epoxy
(Note 5 & 6)
/ Epoxy Mastic
or System 1 (Note 1) Organic Zinc / Epoxy / Urethane
Carbon and Unfireproofed System 1 Organic Zinc / Epoxy / Urethane
Low-alloy Steel
Galvanized Concrete fire T ≤ 248°F(120°C) No coating ---
Steel proofing
(Note 5 & 6)
Carbon and System 2 (Note 2) Epoxy Mastic / Epoxy /
Low-alloy Steel Urethane
Or System 1B Zinc-Rich Epoxy / Epoxy
(Note 3)
Galvanized Alternative No coating According to fireproofing
Steel fireproofing manufacturer’s instruction
(Note 5 & 6)
Carbon and Prime only
Low-alloy Steel

Repair of Galvanized surface:


Substrate Condition Surface Temp System Name Coating Type
Galvanized Unfireproofed / T ≤ 200°F (93°C) System 5 Solvent-Borne Zinc-Rich Epoxy
Steel Damaged / Epoxy Mastic
(Note 5 & 6) areas
200°F (93°C) < T System 4 Inorganic Zinc / High
Temperature Silicone Aluminum
(multi coats)
Or System 15 (Note Modified Silicone Primer /
3) Silicone

Note:
1) For color coding purposes
2) In wetted areas only
3) If approved by COMPANY’s Engineer
4) Vessel skirts and supports are not considered structural steel for the purposes of coating requirements.
5) Hot-dip galvanizing shall be according to ASTM A 123/A 123M. Unless otherwise specified by
COMPANY's Engineer, zinc used in galvanizing shall be "High Grade Zinc," Z15001 (less than 0.03% lead)
in accordance with ASTM B 6.
6) Galvanized structural steel shall not be welded or in direct contact with stainless steel equipment. These
systems shall be bolted and isolated with a solid nonmetallic strip or sheet.

D M S2
-
J28-Jun- 2 0 2
D 25 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 26 of 57

Category D: Underground Piping and Fittings and Field Welds and Repair

Max Temp. Limit for


Pipe Coating System Field Weld/Joint
Underground Comments
Options Coating Options
Service
System 12 Wax Tape 120°F (49°C) System 12 1) Protective overwrap is required.
/ Tape Wrap 2) Prone to damage during shipment.
Intended for field application.

Category E: Underwater / Splash Zone and Marine and Land Piles and Sheet Piling

Substrate Condition Surface Temp System Name Coating Type


Carbon Steel Underwater / Splash T ≤ 200°F (93°C) System 7 100% Solid Epoxy
and Low Alloy Zone (Note 1)
Or System 14 Viscoelastic Tape
Steel
Piles and Land System 7 (Note 2) 100% Solid Epoxy
Sheet
Piling Marine System 7 (Note 3) 100 % Solid Epoxy
(Note 4)

Note:
1) Obtain site and statutory restrictions regarding contaminants in water and consult Paint Manufacturer
specialist.
2) Coat from 2 ft (0.5 m) below permanent ground water level to top of piles (sheet piling), or from 5 ft (1.5 m)
below final grade to top of piles (sheet piling), whichever is less.
3) Coat from 20 ft (6 m) below the harbor bottom to top of pile or sheet pile.
4) The groove at sheet piling interlocks shall not be coated.

D M S2
-
J28-Jun- 2 0 2
D 26 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 27 of 57

Category F: Stainless Steel Equipment, Vessels, Piping, Piping Specialty

Substrate Condition Operating Temp System Name Coating Type


Stainless Uninsulated All Temp. range No coating ---
Steel
Insulated T ≤ 130°F (54°C) No coating ---
(Note 1, 2 & 3)
130°F (54°C) < T ≤ System 10 Aluminum Foil
347°F (175°C)
Or System 6 Solvent-Borne Epoxy
Or System 3 Thermal Spray Aluminum
(Note 4)
347°F (175°C) < T No coating ---

Note:
1) This coating approach defines the minimum requirements for insulated stainless steel. According to NACE
SP0198, most ESCC failures occur when the metal skin temperature is in the hot range between 120 to 350
oF (50 to 175 oC). Outside of this temperature range failures are less frequent.
2) Steam tracing made of copper shall not be used on stainless equipment and not in conjunction with
aluminum foil.
3) When heat tracing is used, organic coatings must have long-term resistance to the tracer temperature, or
a spacer must be utilized.
4) TSA shall be applicable on equipment listed on Sec. 10. Alternative option system 6 can be used subject
for COMPANY’s Engineer approval

D M S2
-
J28-Jun- 2 0 2
D 27 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 28 of 57

Category G: Purchased Equipment (OEM) – Machinery, Motors, Instruments, Transformers, Tagged


Valves, Bulk Valves, Fire Fighting Equipment, etc.

Paint system for up to 200°F (93°C) shall be at least equivalent to paint systems in ISO 12944-5 with an
environment C-5M and the expected durability of 15 years.

Paint system for above 200°F (93°C) shall be equivalent to the paint systems specified in APPENDIX B.

For bulk carbon steel valves unified primer (Inorganic Zinc) shall be applied at VENDOR shop. Succeeding
intermediate and finish coat shall be applied at site based on its actual operating temperature condition.
Refer to Category A and B.

For bulk stainless steel valves refer to Category F.

VENDOR will provide standard coating system, and CONTRACTOR will document rationale. This
information will be included in equipment record system (See Notes).

Note:

1) Assuming proper surface preparation and coating application, coating performance life is dependent on
the atmospheric exposure of the equipment.

2) Exposure to chemical spills, splash, fumes, or routine testing of salt water deluge systems will severely
limit performance life of "standard coating systems." Consult COMPANY’s Engineer to determine suitability
of the proposed coating system.

Category I: Remote Instrument Enclosures (RIEs), Substation Enclosures, and Small Metallic
Buildings

CONTRACTOR / COMPANY to review VENDOR’s proposed coating system and QC procedure.

Note:

1) Other COMPANY and/or local building standards and design practices regarding personnel safety
associated with buildings or enclosures may apply.

2) Painting for buildings shall be handled separately by Building department.

D M S2
-
J28-Jun- 2 0 2
D 28 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 29 of 57

APPENDIX B: COATING SYSTEM DESCRIPTION AND ACCEPTED COATINGS

For the detail of application conditions (DFT, Surface preparation grade…etc.), Paint Manufacturer’s
technical datasheet or instruction shall be followed.

Coating System 1:
To be used in Service Categories A and C
Intended Use Items  Uninsulated Carbon Steel Piping, Vessels, and Equipment for
Corrosivity Category C5-I
Application Suitable  Shop, Operating Unit, or Blast yard
and Operating Installation  Where VOC requirements or ambient conditions such as steel
Limits Environment temp and humidity prevent use of this system, use System 13.
Operating  Ambient to 250F (120C)
Temperature  Not suitable for sweating service.
Substrate Condition New steel
Type Carbon Steel or Low Alloy Steel

COMPLYING PRODUCTS (Note 1)


Manufacturer Primer Coat 2nd Coat Top Coat
Organic Zinc Surface Tolerant Epoxy Aliphatic Polyurethane
International Paint Interzinc 52 Intercure 200HS Interthane 990HS or 990
Carboline Carbozinc 859 Carboguard 888 Carbothane 133 HB
Jotun Barrier 77 Dry Penguard Express Dry Hardtop XP or AS
PPG - Amercoat 385 Amercoat 450
Sigma Sigmazinc 109HS SigmaCover 435 SigmaDur 550
Sherwin Williams Zinc Clad IV Macropoxy 646 Fast Cure Acrolon 218HS
Wasser Corp. MC-Zinc 100 (Note 1) MC-Miomastic100 MC-Luster 100

Notes:
1) The Wasser Corp. material is the product of choice in high humidity environments or when low steel
temperatures prevent the use of epoxy/polyurethane systems.

D M S2
-
J28-Jun- 2 0 2
D 29 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 30 of 57

Coating System 1B:


To be used in Service Category C.
Intended Use Items Uninsulated Carbon Steel Piping, Vessels, and Equipment for
Corrosivity Category 3

Application and Suitable Installation Shop, Operating Unit, or Blast yard


Operating Limits Environment
Operating  Ambient to 250F (120C)
Temperature  Not suitable for sweating service.
Substrate Condition New steel
Type Carbon Steel or Low Alloy Steel

SYSTEM 1B (1-2 mpy corrosion rate)


Manufacturer Primer Coat 2nd Coat Top Coat
Zinc-Rich Epoxy - Epoxy
Carboline Carbozinc 859 - Carboguard 890
Jotun Barrier 77 - Jotacote Universal
Sigma SigmaZinc 109HS - SigmaCover 456
Sherwin Williams Zinc Clad IV - Macropoxy 646

D M S2
-
J28-Jun- 2 0 2
D 30 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 31 of 57

Coating System 2:
To be used in Service Category C.
Applications where abrasive blasting and/or spray application are not suitable.
Intended Use Items Touchup of System 1
Applicability Suitable Installation Shop or Operating Unit
Environment
Operating Temperature Above dewpoint to 250F (120C)
Steel Condition  Repair/Refurbishment of existing coating
 New or corroded steel
Method of Application Spray or brush
Substrate Type Carbon steel or Low Alloy steel

COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Surface Tolerant Epoxy Surface Tolerant Epoxy Aliphatic Polyurethane
Mastic
Carboline Carbomastic 15 Carboguard 893 SG Carbothane 133 HB
International Paint Interseal 670HS Interseal 670HS Interthane 990HS
Jotun Primastic Primastic Hardtop XP
PPG Amerlock 400 Amerlock 400 Amercoat 450
Sigma SigmaCover 650 SigmaCover 650 SigmaDur 550
Sherwin Williams Macropoxy 646 Macropoxy 646 Acrolon 218HS
Wasser Corp MC-Zinc 100 MC-Miomastic100 MC–Luster 100

D M S2
-
J28-Jun- 2 0 2
D 31 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 32 of 57

Coating System 3:
To be used in Service Categories A, B, C, and F.
Intended Use Items  Insulated Piping, Vessels, Structural Steel, and
Equipment 25F to 302F (−4C to 150C).
 Uninsulated Piping, Vessels, Structural Steel, and
Equipment in Wetted Areas.
 Thermal Spray Aluminum (TSA)
Applicability Suitable Installation Blast yard, Shop, or Unit
Environment
Suitable Operating 25F–1000F (-4C to 538C)
Temperature
Steel Condition New or corroded
Method of Application Spray or brush
Substrate Type Carbon steel, Low Alloy steel, or Stainless Steel
General Criteria Specific guidance on issues related to surface preparation,
application, and inspection shall be included in the
specification as provided by the COMPANY’s Engineer.

COMPLYING PRODUCTS
Manufacturer Optional Seal Coat
Dampney Up to 500°F (260°C) – Thurmalox Series 200 (Aluminum and Colors Available)
Up to 1000°F (538°C) – Thurmalox Series 230 (Aluminum and Colors Available)
PPG Up to 250°F (120°C) -- Amercoat 385
Up to 1000°F (538°C) -- PSX-892HS
International Up to 225F(107C) – Interseal 670HS
Up to 500F (260C) – Intertherm 875
Up to 750F – Intertherm 751 (CSA)
Up to 1000F (538C) – Intertherm 50
Jotun Solvalitt Midtherm – Up to 500F (260C)
Solvalitt – Up to 1112F
Sherwin-Williams Up to 250F (120C) – Macropoxy 646
Up to 500F (260C) – Hi-Temp Coatings 500V
Up to 1000F (538C) – Hi-Temp Coatings 1000V
Sigma Up to 250F (120C)– SigmaCover 456
Up to 500F (260C) – SigmaTherm 350
Up to 1000F (538C) – SigmaTherm 540
Carboline Up to 250F (120C) – Carboguard 893SG (thinned as needed)

D M S2
-
J28-Jun- 2 0 2
D 32 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 33 of 57

Coating System 4:
To be used in Service Categories A and B.
Intended Use Items  Bare Steel Operating between 250F (120C) and 800F
(426C)
 Protrusions through insulation when a coating is not
required under insulation (continuous operation above
450F (232C)
Applicability Suitable Application Blast yard, Shop, or Operating Unit
Environment
Steel Condition Repair/Refurbishment, and New
Substrate Type Carbon steel or Low Alloy steel

COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Inorganic Zinc High Temperature Silicone High Temperature Silicone
Aluminum Aluminum
PPG Dimetcote 9 Amercoat 878 HS Amercoat 878 HS
International Paint Interzinc 22 Intertherm 50 Intertherm 50
Carboline Carbozinc 11 Series Thermaline 4700 Aluminum Thermaline 4700 Aluminum
Dampney Thurmalox 245 N/A Thurmalox 230 Series
(Available in Aluminum or
Colors)
Jotun Resist 78 Solvalitt Solvalitt
Sherwin Williams Zinc Clad II Series Hi-Temp Coatings 1000V Hi-Temp Coatings 1000V
Sigma SigmaGuard 750 SigmaTherm 540 SigmaTherm 540

D M S2
-
J28-Jun- 2 0 2
D 33 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 34 of 57

Coating System 5:
To be used in Service Category C.
Intended Use Items Structural Steel - Repair or Color Coding of Hot-dip Galvanized Steel
Applicability Suitable Blast yard, Shop, or Operating Unit
Installation
Environment
Suitable Operating Ambient to 250F (120C)
Temperature NOTE: Coatings below may be unsuitable for structural steel
attached to vessels operating above 250F.
Steel Condition  New or aged galvanized (for color identification)
 Damaged galvanizing
Substrate Type Carbon steel, Low Alloy steel or Galvanized steel

SOLVENT-BORNE PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Organic Zinc Epoxy - Epoxy Mastic (Gray)
International Paint Interseal 670HS - Interseal 670HS (Note 1)
PPG Amerlock 2 (Note 2) or - Amerlock 2 or Amerlock 400
Amerlock 400
Carboline Carbozinc 859 VOC - Carboguard 890
Jotun Barrier 77 - Primastic
Sherwin Williams Macropoxy 646 - Macropoxy 646
PPG SigmaZinc 109HS - SigmaShield 880

Note:
1) Interthane 990HS may be used as alternate topcoat for availability of colors.
2) Formerly Amerlock 400FD. Fast and low-temperature cure formulation.

D M S2
-
J28-Jun- 2 0 2
D 34 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 35 of 57

Coating System 6:
To be used in Service Categories B and F.
Intended Use Items  Immersion Grade Organic Coating for Corrosion Under
Insulation (CUI) Protection
 Insulated CS and Low Chrome Operating Continuously or
Intermittently up to 400F (204C) Steel Temperature
Applicability Suitable Installation  Blast yard, Shop, or Operating Unit
Environment  Application to hot steel by spray application up to max.
temp. recommended on product datasheet
Steel Condition New or corroded steel
Substrate Type Carbon steel, Low Alloy steel or stainless steel

COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Epoxy Phenolic - Epoxy Phenolic
International Paint Intertherm 228 - Intertherm 228
Carboline Thermaline 450 - Thermaline 450
Dampney Thurmalox 218 - Thurmalox 219
Hi-Temp Coatings 1027 CUI - Hi-Temp 1027
Jotun Epoxy HR - Epoxy HR
PPG Amercoat 91 - Amercoat 91
Sherwin Williams Epo-Phen - Epo-Phen
Sigma SigmaPhenguard 630 - SigmaPhenguard 635

D M S2
-
J28-Jun- 2 0 2
D 35 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 36 of 57

Coating System 7:
To be used in Service Category E.
Intended Use Items  Underground steel surfaces where abrasive blast is allowed
 Underwater/ Splash Zone & Piles and Sheet Piling
 Thick-film Epoxy, 100% Solids
Suitable Installation Blast yard, Shop, or Operating Unit
Environment
Steel Condition New or corroded steel
Suitable Operating < 200F (93C)
Environment
Substrate Type Carbon steel or Low Alloy steel

COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Solvent free Epoxy - Solvent free Epoxy
International Paint Interzone 485 - -
Carboline Phenoline 309 (airless applic) or - Phenoline 309 or 310
Phenoline 310 (plural applic)
Sigma SigmaLine 2000 - SigmaLine 2000

D M S2
-
J28-Jun- 2 0 2
D 36 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 37 of 57

Coating System 10:


To be used in Service Category F.
Intended Use Items  Aluminum Foil Wrap for Stainless Steel Under Insulation
 Insulated SS piping and small diameter vessels which
operate above dewpoint and for which protection from
stress chloride cracking is desired.
Suitable Installation
Blast yard, Shop, or Operating Unit
Environment
Maximum Use 1000F (540C)
Temperature
Steel Condition  New construction
 Maintenance in unit
Substrate Type Stainless steel
General Criteria Refer to APPENDIX C Requirements for Application of Aluminum Foil to Stainless
of GP 19-01-01D Steel Vessels and Piping.

D M S2
-
J28-Jun- 2 0 2
D 37 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 38 of 57

Coating System 12:


To be used in Service Category D.
Intended Use Items  Wax Tape / Tape Wrap for Underground piping as described
in Category D.
 Wax Tape for Aboveground piping which must be coated while
wet or for which any surface prep beyond removal of loose
rust is not appropriate, such as adjacent cooling towers.
 Wax Tape for Soil to air interface applications
Suitable Installation  Shop, blast yard, or operating unit
Environment  Easily damaged during shipment, unless protected with rigid
overwrap
Max. Temperature  130F (54C) above ground
Resistance  110F (43C) below ground
 Not suitable where steam-out or hot circulation is possible.
Steel Condition New or corroded steel
Substrate Type Carbon steel, Low Alloy steel and Stainless Steel
General NACE RP0375 Field-Applied Underground Wax Coating Systems for Underground
Criteria Pipelines: Application, Performance, and Quality Control
AWWA C214 Tape Coating Systems for the Exterior of Steel Water Pipelines

COMPLYING PRODUCTS
PUTTY
PRIMER COAT (for profiling around TAPE WRAP OVERWRAP
bolts/uneven surfaces)
BELOW GROUND
Trenton Corp --Temcoat Fill Putty #1 Wax Tape For irregular shapes -- Trenton
Primer Poly Ply
For straight sections -- Guard
Wrap
Denso -- Denso Paste (if pipe Profiling mastic LT Tape Glass Outerwrap
is damp/wet, use Denso Paste
S105)
Polyken – Polyken #1027 Polyken #939 Mastic Polyken #980 Polyken #955 Outer Wrap
Primer Inner Wrap
ABOVE GROUND
Trenton Corp --Temcoat Fill Putty #2A Wax Tape None required
Primer
SOIL TO AIR INTERFACE
Trenton Corp --Temcoat Not needed #2A Wax Tape None required
Primer

D M S2
-
J28-Jun- 2 0 2
D 38 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 39 of 57

Coating System 14:


To be used in Service Category E.
Intended Items  Viscoelastic Tape for aboveground or below ground steel and
Use ductile iron where grit blasting is not possible or suitable.
Underground use requires PVC outerwrap.
 Viscoelastic Tape for marine immersion and splash zone --
requires PVC outerwrap.
 Viscoelastic Tape for Chine seals on storage tanks with concrete
ring walls. Use the putty/paste product as filler to achieve smooth
taper.
 Should be applied to dry steel, but suitable for sweating steel
operating conditions
Suitable Installation Shop, Blast yard, or Operating Unit
Environment
Suitable Operating See product list below
Temperature
Application steel See product list below
temperature
Steel Condition  Repair/Refurbishment of existing coating
 New or corroded steel
 Steel must be dry

Acceptable Viscoelastic Tape Products


Aboveground or
Manufacturer Product Name Use/Limitations
Underground (UG)
Viscotaq ViscoWrap-ST As tape wrap. -43F (-42C) to 150F (65C) Either. If UG, PVC
Viscotaq.com outerwrap is needed.
ViscoWrap-HD As tape wrap. -43F (-42C) to 185F (85C)
EZ-Wrap As tape wrap. -43F (-42C) to 150F (65C) Aboveground. Suitable
for adhesion of paint
when color identification
is desired
ViscoPaste-ST Putty to fill around bolts, joints, irregular shapes Either. If UG, PVC
and provide tapered surface for wrap. outerwrap is needed.
-43F (-42C) to 150F (65C)
ViscoPaste-HD Putty to fill around bolts, joints, irregular shapes
and provide tapered surface for wrap.
-43F (-42C) to 185F (85C)
Stopaq Wrappingband As tape wrap. Either. If UG, PVC
Stopaq.com CZ Operation :-49F (45C) to 120F (50C) outerwrap is needed.
Applic. substrate: -22F (-30°C) to 120F (50°C)
Applic. Stopaq: 40°F (5°C) to 158F (70°C)
Wrappingband As tape wrap.
CZH Operation :-49F (45C) to 158F (70C)
Applic. substrate: -22F (-30°C) to 158F (70°C)
Applic. Stopaq: 40°F (5°C) to 158F (70°C)

D M S2
-
J28-Jun- 2 0 2
D 39 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 40 of 57

Acceptable Viscoelastic Tape Products


Wrappingband As tape wrap. Either. If UG, PVC
CZHT Operation: -49(-45°C) to 203F (95°C) outerwrap is needed.
Applic. substrate: -22F (-30°C) to 158F (70°C)
Applic. Stopaq: 40F (5°C) to 158F (70°C)
CZ Paste Putty to fill around bolts, joints, irregular shapes
and provide tapered surface for wrap.
Operation :-49F (45C) to 120F (50C)
Applic. substrate: -22F (-30°C) to 120F (50°C)
Applic. Stopaq: 40°F (5°C) to 158F (70°C)
CZH Paste Putty to fill around bolts, joints, irregular shapes
and provide tapered surface for wrap.
Operation :-49F (45C) to 158F (70C)
Applic. substrate: -22F (-30°C) to 158F (70°C)
Applic. Stopaq: 40°F (5°C) to 158F (70°C)
FN4100 Removable putty for flanges or objects where Either. If UG, needs non-
removal is needed. Reusable. woven polypropylene
Operation: 5F (-15C) to (86F) 30C geotextile then PVC
Applic. Stopaq: 59F (15C) to (86F) 30C outerwrap.

Note:
1) Products are long-term UV resistant without the black PVC outerwrap. If the clear outer covering
deteriorates, the base product is unaffected. The outerwrap is for protection from underground soil stress
and mechanical damage.
2) Stopaq Wrappingband (green) and Viscotaq ViscoWrap (blue) have a clear external film which is not UV
resistant. When it degrades in sunlight, only the appearance is affected. The performance of the tape is not
affected.
3) Viscotaq EZ Wrap tape is gray and has a thin fabric outerlayer, which is long term UV resistant (for
aesthetics) or it can be painted.

D M S2
-
J28-Jun- 2 0 2
D 40 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 41 of 57

Coating System 15:


To be used in Service Category B.
Intended Use Items  Uninsulated aboveground carbon steel and low alloy
surfaces of equipment and piping
 Insulated aboveground carbon steel and low alloy surfaces
of equipment and piping
Suitable Installation
Shop, Blast yard, or Operating Unit
Environment
Maximum
As noted on product datasheet.
Temperature Limit
Steel Condition New or Corroded steel. Applicable to hot steel as noted below.
Substrate Type Carbon steel or Low Alloy steel

COMPLYING PRODUCTS
Manufacturer Primer Coat 2nd Coat Top Coat
Hi-temp coating 1027 DTR 1027 DTR 1000VS
Dampney Thurmalox 225HD Thurmalox 225HD Thurmalox 230

D M S2
-
J28-Jun- 2 0 2
D 41 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 42 of 57

APPENDIX C: TEST REQUIREMENTS AND ACCEPTANCE CRITERIA FOR COATING


QUALIFICATION

Alternative paint systems for those in APPENDIX B may be proposed if they can be demonstrated that there
is a significant cost or performance benefit for using the proposed system. In that case, it shall be submitted
to COMPANY through CONTRACTOR for approval after requirements in this section has been completed.

Test items Test methods Duration Acceptance criteria


(hrs)
Aging resistance ISO 20340 Annex A 4200 As per Table 5 ISO 20340
Standard Procedure (NSS solution) See Note (1) for exceptions
Impact resistance ISO 6272-1 N/A > 2 J No evidence of cracking
Edge Retention NACE TM0304 N/A >50%
Thermal Cycling NACE TM0304 720 No evidence of cracking
Resistance to in- Continuous exposure at 120C dry heat 720 No flaking,cracking, disbonding or
services discoloration.
temperature Adhesion > 70% of original
Continuous exposure at 230C dry heat No flaking,cracking or disbonding.
Adhesion > 70% of original
Continuous exposure at 450C dry heat

Thick Film Cracking NACE TM 0104 No evidence of cracking

Cold Wall Effect NACE TM 0174 Procedure A 4200 No flaking, cracking or disbonding.
Adhesion > 70% of original
Under insulation ASTM G189 According to ASTM G189
suitability
Cathodic ASTM G8 720 Diameter of disbond shall be < 10
disbonding mm.
ASTM G42
UV Resistance BS EN 12068, Annex F Cohesive failure @ 17.5 GJ/m2
Lap shear strength BS EN 12068, Annex d

Note:
1) Table 5 from ISO 20340 shall be used as the acceptance criteria with the exception of the following:

Assessment method Before aging exposure After aging exposure


ISO 4624  Min. 5 MPa for zinc primed coating  Min. 5 MPa or 70% of the initial
systems. value.
 Minimum 7 MPa for non zinc primed  Minimum 5 MPa for non zinc primed
coatings for external services. coatings for external services.

D M S2
-
J28-Jun- 2 0 2
D 42 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 43 of 57

The proposed coating system shall be tested in accordance with the following table:

In Service Temp

Under insulation
Coating System

Edge Retention
resistance test

120C (250F)

UV resistance
230C(446F)

disbondment
Fingerprint

resistance

Thick Film

Lap shear
MSDS (1)

suitability
Cracking

Cathodic

strength
Ageing

Impact
TDS
Syst. 1
Syst. 1B
Syst. 2
Syst. 3
Syst. 4
Syst. 5
Syst. 6
Syst. 7
Syst. 10
Syst. 12
Syst. 14 (2)
Syst. 15

Note:
1) Paint Manufacturer's documentation as defined in this procedure
2) As applied to both a steel substrate and to itself (2 tests)

= required test

D M S2
-
J28-Jun- 2 0 2
D 43 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 44 of 57

APPENDIX D: COLOR SCHEDULE

Color Schedule for piping:

SERVICE PIPE IDENTIFICATION DETAILS REMARKS


NAME ABBREVIATION ENTIRE PIPE PIPE BAND
FINISH COLOR RAL No. COLOR RAL No.
Drain DR Gray RAL 7032 --- ---
Process P Gray RAL 7032 --- --- Note 1 &
Note 3
Low Pressure LS --- --- Brown RAL 8002 Note 2 &
Steam Note 3
Low Pressure SCL --- --- --- --- Note 3
Condensate
Firewater FW Red RAL 3001 --- --- Note 4
Low Pressure LDN Gray RAL 7032 Yellow / RAL 1012 / Note 1 &
Deoxo Nitrogen Green RAL 6032 Note 3
Cooling Water CWS Yellow RAL 1021 --- ---
Supply
Cooling Water CWR Yellow RAL 1021 --- ---
Return
Tempered TWS Yellow RAL 1021 --- --- Note 3
Water Supply
Tempered TWR Yellow RAL 1021 --- ---
Water Return
Potable Water PW --- --- Blue RAL 5015 Note 2
NE Water NE --- --- --- ---
Utility Station – IA Aluminum RAL 9006 --- --- Note 1
Instrument Air
Utility Station – PA Aluminum RAL 9006 --- --- Note 1
Plant Air
Utility Station - IW Blue RAL 5015 --- ---
Industrial
Water
Utility Station - OW Gray RAL 7032 --- ---
Oily Water
Utility Station – PN Gray RAL 7032 Purple RAL 4008 Note 2
Nitrogen
Vent V Gray RAL 7032 --- --- Note 1 &
Note 3
Valves – -- --
Battery Limit
Valves
Valves – CSC Yellow RAL 1021
Valves
Valves – CSO Yellow RAL 1021 Note 5
valves and
PRV’s

D M S2
-
J28-Jun- 2 0 2
D 44 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 45 of 57

Note:
1) Finish color shall be applicable on uninsulated carbon steel surfaces only.
2) Color band shall be applied on the last 1m ~ 2m at the connection.
3) Finish color is not necessary if insulated line.
4) Finish color is applicable on aboveground firewater line only.
5) Bonnets of Bellows PRV are painted RED.

Color schedule for structural steel and equipment:

SUBSTRATE / ITEM COLOR RAL No.


Railings and Cages Yellow RAL 1021
Stairs and Walkways Gray RAL 7032
Structural Steel Gray RAL 7032
Shower Yellow RAL 1021
Fire Extinguisher mounting area Red RAL 3001
Fire Equipment / Hose Cabinets Red RAL 3001
Egress Ladders (Note 1) Yellow RAL 1021
Headknocker or Trip Hazards Black and Yellow Stripes RAL 9005 / RAL 1021
Ladders (Note 2) Yellow RAL 1021
Handrails (Note 3) Yellow RAL 1021
Equipment (Vessel, Drum, Exchanger, Tower) Gray RAL 7032
Rotating Equipment (Pumps and Compressors) Vendor Standard
Tanks -
Instrument Items Vendor Standard
Electrical Items Vendor Standard

Note:
1) Egress ladders are defined as those servicing normal operating platforms.
2) All ladders on fired heaters / steam cracking furnaces and those maintenance ladders located on the sides
of towers and other vessels.
3) A 1m section of the handrail on either side of the entrance/exit to ladders and/or stairways shall be painted
yellow to aid in finding egress points during an emergency.
4) Painting not normally required on galvanized components unless for color safety identification purposes.
5) Color shown is a guide only. For actual color to be followed, refer to guidance provided in SSS-SI-310
“Identification Guidelines and Management Plan for SCDs and associated Isolation Valves”.

D M S2
-
J28-Jun- 2 0 2
D 45 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 46 of 57

APPENDIX E: ZX-141-0100 (SCP PROCESS LABELLING STANDARD)

D M S2
-
J28-Jun- 2 0 2
D 46 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 47 of 57

APPENDIX F: ZX-141-0101 (SCP PROCESS LABELLING STANDARD)

D M S2
-
J28-Jun- 2 0 2
D 47 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 48 of 57

APPENDIX G: ZX-141-0102 (SCP PROCESS LABELLING STANDARD – SIGN DETAILS)

D M S2
-
J28-Jun- 2 0 2
D 48 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 49 of 57

APPENDIX H: ZX-141-0103 (SCP PROCESS LABELLING STANDARD – EQUIPMENT IDENTIFICATION)

D M S2
-
J28-Jun- 2 0 2
D 49 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 50 of 57

APPENDIX I: INSPECTION METHODS AND ACCEPTANCE CRITERIA


Inspection requirements for each coating system except for System 3 (Thermal Spray Aluminum) are
summarized below.

Consequence/
Test Type Method Frequency Acceptance Criteria
Corrective Action
Environmental Ambient and steel Before start of each In accordance with No blasting or
Conditions temperature shift, plus a minimum specified coating
Relative humidity: twice per shift requirements
ASTM E 337 Dew
point spread
Verification of SSPC AB 1 Each 16 tons (16,000 Qualification and No blasting or
Abrasive kg), or manufacturing conformance testing coating
Materials batch, whichever is per conformance
less testing per Section 5
of SSPC AB 1

SSPC AB 3 Qualification (i.e.,


"preliminary
acceptance") testing
per Section 4 of
SSPC AB 3 and
conformance testing
per Sections 4.1.1,
4.2.2, and 4.2.3 of
SSPC AB 3
Compressed Air ASTM D 4285 Before start of each Per the Standard (No Service, clean, and
Quality shift or change in visible contamination) replace hoses,
compressed air filters, KO pots,
source and at 4 hour aftercoolers.
intervals thereafter or Pressure wash
once per shift if with cleanser,
demonstrated by rinse, then re-blast
CONTRACTOR contaminated
surfaces
Visual Visually, for sharp 100% of all surfaces No defects, refer to Defects to be
Examination of edges, weld spatter, prior to surface specified repaired
Substrate slivers, rust grade, etc. preparation requirements
Surface (a) SSPC VIS 1 or ISO (a) 100% visual of all (a) In accordance (a) Re-blast
Cleanliness 8501-1 surfaces with Paint
a) Visual Manufacturer's data
b) For dust sheet for the
recommended grade
of surface
preparation
(b) ISO 8502-3 (b) Spot checks, but (b) Maximum quantity (b) Re-clean and
pressure sensitive not less than 1 per and size rating of 2 retest until
tape method 100 ft2 (10 m²). acceptable
Specific location to be
determined by
Inspector

D M S2
-
J28-Jun- 2 0 2
D 50 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 51 of 57

Consequence/
Test Type Method Frequency Acceptance Criteria
Corrective Action
[*] Soluble Salts Extraction: 4 samples per 22,000 Average conductivity Steam or clean
Only if specified ISO 8502-6 (Bresle) ft2 (2000 m2) of corresponding to ≤ 30 water washing and
or requested by ISO 8502-9 surface to be coated mg/m2 retesting until
Inspector (Conductometric) entire 22,000 ft2
because of Specific location to be and maximum (2000 m2)
seating service. Or determined by conductivity test area is
(HOLD) Inspector. corresponding to ≤ 40 acceptable
Extraction: mg/m2 water soluble
SSPC GUIDE 15, salt(s).
Section 4.6
(Elcometer 130 SC
400)

Assessment:
SSPC GUIDE 15,
Section 5.3
Anchor profile Per ASTM D 4417 a) Power tool As specified Re-blasting, using
cleaning: appropriate grit
Perform at beginning size or enhanced
of shift, then at Every 4 hours if nozzle pressure.
prescribed frequency. SSPC SP11 is
required in paint OR
manufacturer’s data
sheet. Repeat power tool
surface
b) Recycled abrasive:
preparation.
Every 4 hours
c) For non-recycled
abrasive:

Minimum once per


shift...or...after any
change of equipment
conditions, abrasive
material, or abrasive
size
Extent of Perform solvent rub Perform 3 tests per (a) Average (a) Inadequately
Intercoat Cure test to ensure: 5000 ft2 (500 m²) of resistance rating not cured IOZ:
surface to be coated less than 4
(a) IOZ is fully cured
Take action to
per ASTM D 4752
enhance level of
cure (e.g., water
misting).
If ineffective,
remove and
reapply
inadequately cured
IOZ.

D M S2
-
J28-Jun- 2 0 2
D 51 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 52 of 57

Consequence/
Test Type Method Frequency Acceptance Criteria
Corrective Action
(b) Confirm epoxy for (b) Discoloration (b) Overcured
insulated surface has must be visible on the Epoxy:
not exceeded its rub cloth, or
recoat interval per Thumbnail Sweep blast using
ASTM D 5402. Unless indentation at the reduced nozzle
otherwise instructed, in center of the rub path pressure and fine
writing, by the Coating must be possible, or abrasive. Remove
Manufacturer, perform Reduction in gloss all dust.
50 double rubs using must be visually
MEK. discernable
Compatibility Apply test patch and One for each As established by the Remove
with color test per component coated Paint Manufacturer of incompatible
topcoats with Vendor standard, the overcoat(s) coating before
(With Vendor ASTM D 3359, Method except one in 25 for applying specified
Standard A or identical components system. Use liquid
Coating on stripper or SSPC
Purchased ASTM D 6677. Patch SP 11.
Equipment) may be as small as 30
(HOLD) in.2 (200 cm2).

Apply first coat of


overcoat system only.
Visual Visual to confirm 100% of surface after According to Repair of defects
Examination of absence of each coat specified
Coating contamination, requirements
pinholes, sagging, or
other surface defects
Dry Film SSPC PA2: SSPC PA2 SSPC PA2 Repair, apply
Thickness Large vessels > 48 in. additional coats, or
(1220 mm) recoat as
appropriate.
Vessels and Piping: 8 readings per band Min. 85% of readings
with bands spaced at within specified
24 in. (610 mm) > d > 10–12 ft (3–3.5 m) range.
48 in. (1220 mm) intervals.
Random spot
Piping: Same band spacing readings may be
as above with 6 more or less than
12 in. (3000 mm) to 24 readings per band. specified by 1 mil (25
in. (610 mm) dia. μm).
Piping: Same band spacing Single reading may
as above with 4 exceed the spec by
Up to 12 in. (610 mm) readings per band as much as 3 mils
dia. Including one band at (75μm) if 3 additional
flange area. readings taken within
Minimum 3 bands of 8 in. (200 mm)
readings per spool. around the reading
are within specified
range.

D M S2
-
J28-Jun- 2 0 2
D 52 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 53 of 57

Consequence/
Test Type Method Frequency Acceptance Criteria
Corrective Action
Adhesion test ASTM D3359 Method 1 time per each ASTM D3359: 4B or Re-blasting and re-
B for Paint System 4, system is the Paint Manufacturer’s coating
15 minimum on the final recommendation
coat with the
ASTM D4541 for Paint following conditions ASTM D4541: min.
System 1, 1B, 2, 5, 6, for each item. pull-off force of 3MPa
7 or Paint
Structure: 1 time / Manufacturer’s
Vendor’s Standard 1,000m2, 1 time per recommendation
Paint System: week or Vendor's
Recommendation
DFT≦125μm: ASTM (CONTRACTOR's
D3359 Method B approval is needed)

DFT>125μm: ASTM Piping: 1 time per 500


D4541 m2

Equipment: 1 time
per equipment or
100m2 in the case
the equipment is
greater than 20m2.
Valve: 1 time per 25
valves or per blasting
shift.

D M S2
-
J28-Jun- 2 0 2
D 53 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 54 of 57

APPENDIX J: INSPECTION REPORT FORM SAMPLE


COATING INSPECTION REPORT

Date Inspector
Project Name
Applicator Supervisor
Item No. ID No.
Ref. No. Substrate Material

WEATHER / WIND / TEMPERATURE / HUMIDITY / DEWPOINT


Weather Humidity Temperature (˚C) OK to Coat
Time Wind
Condition (%) Atmosphere Surface Dew Point [ Check ]




BLASTING and SPRAYING EQUIPMENT


Compressed Air (Check) Free of Water  Free of Oil 

Photo (Note 1) Photo (Note 1)

Visual Examination of Substrate before BLASTING


Burrs  Weld Slag  Weld Porosity 
Laminations  Sharp Edges  Weld spatter 
Oil and Grease  Other Contamination 

Photo (Note 1) Photo (Note 1)

Verification of Abrasive Materials


Size Classification  Conductivity  Cleanliness 

D M S2
-
J28-Jun- 2 0 2
D 54 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 55 of 57

ABRASIVE TYPE & Size: _______________________

SURFACE PREPARATION
Member No. / Area Area (sq.m)
SURFACE Criteria Time
CLEANLINESS Result  OK to Coat
SURFACE Criteria Time
PROFILE Result  OK to Coat
SURFACE Criteria Time
DUST Result Rating Class  OK to Coat
Salt level / Criteria Time
Conductivity Result  OK to Coat

Photo (Note 1) Photo (Note 1)

Photo (Note 1) Photo (Note 1)

VISUAL CHECK / Free of items


 Burrs  Weld Slag  Oil and Grease
 Laminations  Weld Porosity  Other Contamination
 Sharp Edges  Weld spatter  Flash Rusting
 OK to Coat [ Check ]

REMARKS

SIGNED
Inspected by Reviewed / Witnessed by Approved by

dd, mm, yyyy dd,mm,yyyy dd,mm,yyyy

D M S2
-
J28-Jun- 2 0 2
D 55 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 56 of 57

COATING INSPECTION REPORT

Date Inspector
Project Name
Applicator Supervisor
Item No. ID No.
Ref. No. Substrate Material
Member No. / Area Paint System No. Area

WEATHER / WIND / TEMPERATURE / HUMIDITY / DEWPOINT


Weather Humidity Temperature (˚C) OK to Coat
Time Wind
Condition (%) Atmosphere Surface Dew Point [ Check ]




PAINT Application
Identification 1st Coat 2nd Coat 3rd Coat 4th Coat
Applied Date / Time
Application Method
Manufacturer’s Name
Generic Type
Product Name
Batch No. / Base
/ Hardener
Color
Thinner Name
Batch No. / Thinner
Thinner Used % (Volume)

Stripe Coat 

COATING Inspection
COATING THICKNESS
1st Coat 2nd Coat 3rd Coat 4th Coat
(microns)
Required DFT
1
2
Spot Measurement 3
4
5
Actual DFT
OK to Subsequent Coat
  
(Check)

D M S2
-
J28-Jun- 2 0 2
D 56 / 57
RINTE
ED WHEN P
ROLL
NCONT
Metallocene Catalyst Expansion Project (Met-X) Contractor DOC. No. : S-0000-13A0-001 Rev 2B
Jurong Island, Singapore Contractor JOB Code : G-6121-00
Specification for Painting and Color Coding Sheet : 57 of 57

1st Coat
SOLVENT RUB TEST(a)
(Inorganic Zinc only)
Testing Date / Time
Solvent Name / Method Photo (Note 1)
Criteria
Result
Conform to requirement (Check) 
1st Coat
SOLVENT RUB TEST(b) (Epoxy for splash
zone)
Testing Date / Time
Solvent Name / Method Photo (Note 1)
Criteria
Result
Conform to requirement (Check) 
VISUAL INSPECTION 1st Coat 2nd Coat 3rd Coat 4th Coat
Testing Date / Time
Conform to requirement (Check)    
ADHESION TEST
Testing Date / Time Device Name
Method (MPa for Pull-off)
Result
Mode of Failure  Criteria
Conform to requirement (Check) (Cross-cut rating)

Photo (Note 1) Photo (Note 1)

REMARKS

SIGNED
Inspected by Reviewed / Witnessed by Approved by

dd, mm, yyyy dd,mm,yyyy dd,mm,yyyy

Note 1: If required by CONTRACTOR


Note 2: For immersion and buried environment

D M S2
-