NON-DESTRUCTIVE TESTING (NDT) MONITORATION SHEET DATE:19-DEC-2017
PROJECT TITLE :KHURAIS FACILITIES EXPANSION AND SATELITE (GOSP)
WEEKLY MT AS PER 10% LINE CLASS WAISE COVERAGE FOR FIELD JOINTS CUT OF DATE 13.12.2017 TO 19.12.2017
WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION
BI-10-01506-0003 SAIPEM/NCC CPF FIELD
NO OF JOINTS REQUIRED ACTUAL PERCENTAGE
SL NO LINE CLASS FLUID CODE MT DONE MT BACKLOG MT REQUESTED
WELDED MT % %
1 1CT2P06 SR 10 #DIV/0!
2 15LE0P15 TW NONE #DIV/0!
3 15LE0P16 TW NONE #DIV/0!
4 15LE0P17 SW NONE #DIV/0!
5 15LE0P17 TW NONE #DIV/0!
6 15LE0P18 SR NONE #DIV/0!
7 15LE0P18 TW NONE #DIV/0!
8 15LE0P18 SW NONE #DIV/0!
9 15SD0P01 1200S 10 #DIV/0!
10 15SD0P01 BBD 10 #DIV/0!
11 1CA2P06 N 10 #DIV/0!
12 1CG0U01 PA 10 #DIV/0!
13 1CG0U01 WW NONE #DIV/0!
14 1CG0U01 A 10 #DIV/0!
15 1CG0U01 W 10 #DIV/0!
16 1CG0U01 IA 10 #DIV/0!
17 1CH2C01 CA 10 #DIV/0!
18 1CS1P01 SC 10 #DIV/0!
19 1CS1P01 WW 10 #DIV/0!
20 1CS1P01 SW NONE #DIV/0!
21 1CS1P01 OWS NONE #DIV/0!
22 1CS1P01 BD 10 #DIV/0!
23 1CS1P01 P 10 #DIV/0!
24 1CS1P01 SR 10 #DIV/0!
25 1CS1P01 FG 10 #DIV/0!
26 1CS1P01 RL 10 #DIV/0!
27 1CS1P01 FO 10 #DIV/0!
28 1CS1P01 VG 10 #DIV/0!
29 1CS1P01 VT NONE #DIV/0!
30 1CS1P01 TEG 10 #DIV/0!
31 1CS1P01 N 10 #DIV/0!
32 1CS1P01 LO 10 #DIV/0!
33 1CS1U01 OWS NONE #DIV/0!
34 1CS1U01 P 10 #DIV/0!
35 1CS1U01 PT 10 #DIV/0!
36 1CS1U01 RW 10 #DIV/0!
37 1CS1U01 VG 10 #DIV/0!
38 1CS1U01 VT 10 #DIV/0!
39 1CS1U01 BD 10 #DIV/0!
40 1CS1U01 N 10 #DIV/0!
41 1CS1U01 SR NONE #DIV/0!
42 1CS1U01 BFW 10 #DIV/0!
43 1CS1U01 BBD 10 #DIV/0!
44 1CS1U01 SC 10 #DIV/0!
45 1CS1U01 150S 10 #DIV/0!
46 1CS1U01 60S 10 #DIV/0!
NON-DESTRUCTIVE TESTING (NDT) MONITORATION SHEET DATE:19-DEC-2017
PROJECT TITLE :KHURAIS FACILITIES EXPANSION AND SATELITE (GOSP)
WEEKLY MT AS PER 10% LINE CLASS WAISE COVERAGE FOR FIELD JOINTS CUT OF DATE 13.12.2017 TO 19.12.2017
WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION
BI-10-01506-0003 SAIPEM/NCC CPF FIELD
NO OF JOINTS REQUIRED ACTUAL PERCENTAGE
SL NO LINE CLASS FLUID CODE MT DONE MT BACKLOG MT REQUESTED
WELDED MT % %
47 1CS1U01 S 10 #DIV/0!
48 1CS1U01 RL 10 #DIV/0!
49 1CS1U01 TEG 10 #DIV/0!
50 1CS1U01 GS NONE #DIV/0!
51 1CS1U01 DFW NONE #DIV/0!
52 1CS1U22 BBD NONE #DIV/0!
53 1CS1U22 SC NONE #DIV/0!
54 1CS2U01 60S NONE #DIV/0!
55 1CS2U01 BFW NONE #DIV/0!
56 1CS2U01 BD NONE #DIV/0!
57 1CS2U01 RL NONE #DIV/0!
58 1CS2U01 CWR NONE #DIV/0!
59 1CS2U01 CWS 10 #DIV/0!
60 1CS2U01 RW NONE #DIV/0!
61 1CS2U01 WW NONE #DIV/0!
62 1CS2W01 CWS 10 #DIV/0!
63 1CS2W01 CWR 10 #DIV/0!
64 1CT2P06 SR NONE #DIV/0!
65 1CT2P06 S 10 #DIV/0!
66 1CT2P06 FO 10 #DIV/0!
67 1CT2P06 P 10 #DIV/0!
68 1CT2P06 RL 10 #DIV/0!
69 1CT2P06 FG 10 #DIV/0!
70 1CT2P06 TEG 10 #DIV/0!
71 1CT2P06 TS 10 #DIV/0!
72 1CT2P06 BD 10 #DIV/0!
73 1CT2P06 OWS NONE #DIV/0!
74 1CT2P06 SW 10 #DIV/0!
75 1CT2P06 RW 10 #DIV/0!
76 1LE0P06 C 10 #DIV/0!
77 1LE0P06 CWR 10 #DIV/0!
78 1LE0P06 SC 10 #DIV/0!
79 1LE0P06 WB 10 #DIV/0!
80 1LE0P06 BD 10 #DIV/0!
81 1LE0P06 TW NONE #DIV/0!
82 1LE0P06 OWS NONE #DIV/0!
83 1LE0P06 RW 10 #DIV/0!
84 1LE0P06 UW 10 #DIV/0!
85 1LE0P06 SR 10 #DIV/0!
86 1LE0P06 P 10 #DIV/0!
87 1LE0P06 RL 10 #DIV/0!
88 1LE0P06 SW 10 #DIV/0!
89 1LE0P06 VT NONE #DIV/0!
90 1LE0P06 SWS NONE #DIV/0!
91 1LE0W01 VT NONE #DIV/0!
92 1LE0W01 SR NONE #DIV/0!
NON-DESTRUCTIVE TESTING (NDT) MONITORATION SHEET DATE:19-DEC-2017
PROJECT TITLE :KHURAIS FACILITIES EXPANSION AND SATELITE (GOSP)
WEEKLY MT AS PER 10% LINE CLASS WAISE COVERAGE FOR FIELD JOINTS CUT OF DATE 13.12.2017 TO 19.12.2017
WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION
BI-10-01506-0003 SAIPEM/NCC CPF FIELD
NO OF JOINTS REQUIRED ACTUAL PERCENTAGE
SL NO LINE CLASS FLUID CODE MT DONE MT BACKLOG MT REQUESTED
WELDED MT % %
93 1LE0W01 RL 10 #DIV/0!
94 1LE0W01 RW 10 #DIV/0!
95 1LE0W01 UW NONE #DIV/0!
96 1LE0W01 A 10 #DIV/0!
97 1LE0W01 FW 10 #DIV/0!
98 1LE0W01 BBD NONE #DIV/0!
99 1LE0W01 TW NONE #DIV/0!
100 3CA2P06 SOW 10 #DIV/0!
101 3CS1P01 S 10 #DIV/0!
102 3CS1P01 VT NONE #DIV/0!
103 3CS1P01 SR 10 #DIV/0!
104 3CS1P01 RL 10 #DIV/0!
105 3CS1P01 TEG 10 #DIV/0!
106 3CS1P01 P 10 #DIV/0!
107 3CS1P01 FO 10 #DIV/0!
108 3CS1P01 FG 10 #DIV/0!
109 3CS1P08 FG NONE #DIV/0!
110 3CS1U01 SC 10 #DIV/0!
111 3CS1U01 TEG 10 #DIV/0!
112 3CS1U01 S 10 #DIV/0!
113 3CS1U01 150S 10 #DIV/0!
114 3CS1U01 300S 10 #DIV/0!
115 3CS1U01 VT 10 #DIV/0!
116 3CS1U01 BD 10 #DIV/0!
117 3CS1U01 BFW 10 #DIV/0!
118 3CS1U01 PT 10 #DIV/0!
119 3CS1U01 BBD 10 #DIV/0!
120 3CS1U22 150S NONE #DIV/0!
121 3CS1U22 SC NONE #DIV/0!
122 3CT2P06 VT NONE #DIV/0!
123 3CT2P06 SR 10 #DIV/0!
124 3CT2P06 S 10 #DIV/0!
125 3CT2P06 N 10 #DIV/0!
126 3CT2P06 FG 10 #DIV/0!
127 3CT2P06 TEG 10 #DIV/0!
128 3LE0P06 OWS NONE #DIV/0!
129 3LE0P06 SW 10 #DIV/0!
130 3LE0P06 P 10 #DIV/0!
131 3LE0P06 RW NONE #DIV/0!
132 3LE0P06 UW 10 #DIV/0!
133 3LE0P06 SR 10 #DIV/0!
134 3LE0P06 BD 10 #DIV/0!
135 3LE0P06 FG 10 #DIV/0!
136 3LE0P20 TW NONE #DIV/0!
137 3LE0W01 UW NONE #DIV/0!
138 3LE0W01 RW 10 #DIV/0!
NON-DESTRUCTIVE TESTING (NDT) MONITORATION SHEET DATE:19-DEC-2017
PROJECT TITLE :KHURAIS FACILITIES EXPANSION AND SATELITE (GOSP)
WEEKLY MT AS PER 10% LINE CLASS WAISE COVERAGE FOR FIELD JOINTS CUT OF DATE 13.12.2017 TO 19.12.2017
WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION
BI-10-01506-0003 SAIPEM/NCC CPF FIELD
NO OF JOINTS REQUIRED ACTUAL PERCENTAGE
SL NO LINE CLASS FLUID CODE MT DONE MT BACKLOG MT REQUESTED
WELDED MT % %
Remarks
CONSTRUCTION REPRESENTATIVE
QC INSPECTOR or SUPERVISOR
PID REPRESENTATIVE
NON-DESTRUCTIVE TESTING (NDT) MONITORATION SHEET DATE:19-DEC-2017
PROJECT TITLE :KHURAIS FACILITIES EXPANSION AND SATELITE (GOSP)
WEEKLY MT AS PER 10% LINE CLASS WAISE COVERAGE FOR FIELD JOINTS CUT OF DATE 13.12.2017 TO 19.12.2017
WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION
BI-10-01506-0003 SAIPEM/NCC CPF FIELD
NO OF JOINTS REQUIRED ACTUAL PERCENTAGE
SL NO LINE CLASS FLUID CODE MT DONE MT BACKLOG MT REQUESTED
WELDED MT % %
1 1CT2P06 SR 10 #DIV/0!
2 15LE0P15 TW NONE #DIV/0!
3 15LE0P16 TW NONE #DIV/0!
4 15LE0P17 SW NONE #DIV/0!
5 15LE0P17 TW NONE #DIV/0!
6 15LE0P18 SR NONE #DIV/0!
7 15LE0P18 TW NONE #DIV/0!
8 15LE0P18 SW NONE #DIV/0!
9 15SD0P01 1200S 10 #DIV/0!
10 15SD0P01 BBD 10 #DIV/0!
11 1CA2P06 N 10 #DIV/0!
12 1CG0U01 PA 10 #DIV/0!
13 1CG0U01 WW NONE #DIV/0!
14 1CG0U01 A 10 #DIV/0!
15 1CG0U01 W 10 #DIV/0!
16 1CG0U01 IA 10 #DIV/0!
17 1CH2C01 CA 10 #DIV/0!
18 1CS1P01 SC 10 #DIV/0!
19 1CS1P01 WW 10 #DIV/0!
20 1CS1P01 SW NONE #DIV/0!
21 1CS1P01 OWS NONE #DIV/0!
22 1CS1P01 BD 10 #DIV/0!
23 1CS1P01 P 10 #DIV/0!
24 1CS1P01 SR 10 #DIV/0!
25 1CS1P01 FG 10 #DIV/0!
26 1CS1P01 RL 10 #DIV/0!
27 1CS1P01 FO 10 #DIV/0!
28 1CS1P01 VG 10 #DIV/0!
29 1CS1P01 VT NONE #DIV/0!
30 1CS1P01 TEG 10 #DIV/0!
31 1CS1P01 N 10 #DIV/0!
32 1CS1P01 LO 10 #DIV/0!
33 1CS1U01 OWS NONE #DIV/0!
34 1CS1U01 P 10 #DIV/0!
35 1CS1U01 PT 10 #DIV/0!
36 1CS1U01 RW 10 #DIV/0!
37 1CS1U01 VG 10 #DIV/0!
38 1CS1U01 VT 10 #DIV/0!
39 1CS1U01 BD 10 #DIV/0!
40 1CS1U01 N 10 #DIV/0!
41 1CS1U01 SR NONE #DIV/0!
42 1CS1U01 BFW 10 #DIV/0!
43 1CS1U01 BBD 10 #DIV/0!
44 1CS1U01 SC 10 #DIV/0!
45 1CS1U01 150S 10 #DIV/0!
46 1CS1U01 60S 10 #DIV/0!
NON-DESTRUCTIVE TESTING (NDT) MONITORATION SHEET DATE:19-DEC-2017
PROJECT TITLE :KHURAIS FACILITIES EXPANSION AND SATELITE (GOSP)
WEEKLY MT AS PER 10% LINE CLASS WAISE COVERAGE FOR FIELD JOINTS CUT OF DATE 13.12.2017 TO 19.12.2017
WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION
BI-10-01506-0003 SAIPEM/NCC CPF FIELD
NO OF JOINTS REQUIRED ACTUAL PERCENTAGE
SL NO LINE CLASS FLUID CODE MT DONE MT BACKLOG MT REQUESTED
WELDED MT % %
47 1CS1U01 S 10 #DIV/0!
48 1CS1U01 RL 10 #DIV/0!
49 1CS1U01 TEG 10 #DIV/0!
50 1CS1U01 GS NONE #DIV/0!
51 1CS1U01 DFW NONE #DIV/0!
52 1CS1U22 BBD NONE #DIV/0!
53 1CS1U22 SC NONE #DIV/0!
54 1CS2U01 60S NONE #DIV/0!
55 1CS2U01 BFW NONE #DIV/0!
56 1CS2U01 BD NONE #DIV/0!
57 1CS2U01 RL NONE #DIV/0!
58 1CS2U01 CWR NONE #DIV/0!
59 1CS2U01 CWS 10 #DIV/0!
60 1CS2U01 RW NONE #DIV/0!
61 1CS2U01 WW NONE #DIV/0!
62 1CS2W01 CWS 10 #DIV/0!
63 1CS2W01 CWR 10 #DIV/0!
64 1CT2P06 SR NONE #DIV/0!
65 1CT2P06 S 10 #DIV/0!
66 1CT2P06 FO 10 #DIV/0!
67 1CT2P06 P 10 #DIV/0!
68 1CT2P06 RL 10 #DIV/0!
69 1CT2P06 FG 10 #DIV/0!
70 1CT2P06 TEG 10 #DIV/0!
71 1CT2P06 TS 10 #DIV/0!
72 1CT2P06 BD 10 #DIV/0!
73 1CT2P06 OWS NONE #DIV/0!
74 1CT2P06 SW 10 #DIV/0!
75 1CT2P06 RW 10 #DIV/0!
76 1LE0P06 C 10 #DIV/0!
77 1LE0P06 CWR 10 #DIV/0!
78 1LE0P06 SC 10 #DIV/0!
79 1LE0P06 WB 10 #DIV/0!
80 1LE0P06 BD 10 #DIV/0!
81 1LE0P06 TW NONE #DIV/0!
82 1LE0P06 OWS NONE #DIV/0!
83 1LE0P06 RW 10 #DIV/0!
84 1LE0P06 UW 10 #DIV/0!
85 1LE0P06 SR 10 #DIV/0!
86 1LE0P06 P 10 #DIV/0!
87 1LE0P06 RL 10 #DIV/0!
88 1LE0P06 SW 10 #DIV/0!
89 1LE0P06 VT NONE #DIV/0!
90 1LE0P06 SWS NONE #DIV/0!
91 1LE0W01 VT NONE #DIV/0!
92 1LE0W01 SR NONE #DIV/0!
NON-DESTRUCTIVE TESTING (NDT) MONITORATION SHEET DATE:19-DEC-2017
PROJECT TITLE :KHURAIS FACILITIES EXPANSION AND SATELITE (GOSP)
WEEKLY MT AS PER 10% LINE CLASS WAISE COVERAGE FOR FIELD JOINTS CUT OF DATE 13.12.2017 TO 19.12.2017
WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION
BI-10-01506-0003 SAIPEM/NCC CPF FIELD
NO OF JOINTS REQUIRED ACTUAL PERCENTAGE
SL NO LINE CLASS FLUID CODE MT DONE MT BACKLOG MT REQUESTED
WELDED MT % %
93 1LE0W01 RL 10 #DIV/0!
94 1LE0W01 RW 10 #DIV/0!
95 1LE0W01 UW NONE #DIV/0!
96 1LE0W01 A 10 #DIV/0!
97 1LE0W01 FW 10 #DIV/0!
98 1LE0W01 BBD NONE #DIV/0!
99 1LE0W01 TW NONE #DIV/0!
100 3CA2P06 SOW 10 #DIV/0!
101 3CS1P01 S 10 #DIV/0!
102 3CS1P01 VT NONE #DIV/0!
103 3CS1P01 SR 10 #DIV/0!
104 3CS1P01 RL 10 #DIV/0!
105 3CS1P01 TEG 10 #DIV/0!
106 3CS1P01 P 10 #DIV/0!
107 3CS1P01 FO 10 #DIV/0!
108 3CS1P01 FG 10 #DIV/0!
109 3CS1P08 FG NONE #DIV/0!
110 3CS1U01 SC 10 #DIV/0!
111 3CS1U01 TEG 10 #DIV/0!
112 3CS1U01 S 10 #DIV/0!
113 3CS1U01 150S 10 #DIV/0!
114 3CS1U01 300S 10 #DIV/0!
115 3CS1U01 VT 10 #DIV/0!
116 3CS1U01 BD 10 #DIV/0!
117 3CS1U01 BFW 10 #DIV/0!
118 3CS1U01 PT 10 #DIV/0!
119 3CS1U01 BBD 10 #DIV/0!
120 3CS1U22 150S NONE #DIV/0!
121 3CS1U22 SC NONE #DIV/0!
122 3CT2P06 VT NONE #DIV/0!
123 3CT2P06 SR 10 #DIV/0!
124 3CT2P06 S 10 #DIV/0!
125 3CT2P06 N 10 #DIV/0!
126 3CT2P06 FG 10 #DIV/0!
127 3CT2P06 TEG 10 #DIV/0!
128 3LE0P06 OWS NONE #DIV/0!
129 3LE0P06 SW 10 #DIV/0!
130 3LE0P06 P 10 #DIV/0!
131 3LE0P06 RW NONE #DIV/0!
132 3LE0P06 UW 10 #DIV/0!
133 3LE0P06 SR 10 #DIV/0!
134 3LE0P06 BD 10 #DIV/0!
135 3LE0P06 FG 10 #DIV/0!
136 3LE0P20 TW NONE #DIV/0!
137 3LE0W01 UW NONE #DIV/0!
138 3LE0W01 RW 10 #DIV/0!
NON-DESTRUCTIVE TESTING (NDT) MONITORATION SHEET DATE:19-DEC-2017
PROJECT TITLE :KHURAIS FACILITIES EXPANSION AND SATELITE (GOSP)
WEEKLY MT AS PER 10% LINE CLASS WAISE COVERAGE FOR FIELD JOINTS CUT OF DATE 13.12.2017 TO 19.12.2017
WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION
BI-10-01506-0003 SAIPEM/NCC CPF FIELD
NO OF JOINTS REQUIRED ACTUAL PERCENTAGE
SL NO LINE CLASS FLUID CODE MT DONE MT BACKLOG MT REQUESTED
WELDED MT % %
Remarks
CONSTRUCTION REPRESENTATIVE
QC INSPECTOR or SUPERVISOR
PID REPRESENTATIVE