Qatar Autodesk

You might also like

Download as pdf
Download as pdf
You are on page 1of 49
aU pos BIM and Digital Construction: Qatar's Road Map and Strategy 1601820 Robert Grys Projects Management Advisor Public Works Authority of Qatar Robert Grys ee ea BIM & Digital Construction rere eer Ceo Cred Pees oo tas Crore Cee acne a Geen eS Deere Pee ok etc) Pree eect Peeters See and ay, Content & Objectives + Leam about the BIM implementation road map of the Public Works Authority. + Discover the BIM policy and Ashghal BIM Standards based on ISO 19650. + Learn about BIM technology implementation within IT infrastructure. “> Understand how BIM can enable Digital Construction and future site technologies. 2 9° 3 < = a State of Qatar pee 2.71 MILLION 563 KM 320 DAYS ‘Qatar's population as Length of Qatar's coastline Sunshine per year of January 2023 & % x 100+ 1 Country Diflerent nationalities in the Middle East To living in Qatar host aFIFA World Cup™ GQ & ay 99% 33.8 Years 45th Internet ‘Median age of Population Smallest country in Penetration Rate the world wae BIM Adoption in Qatar = Early adopters (R&D) = Recognition of benefits & RO! ere uu = Adoption by big developers = National research projects 2018 — 2023 Standardization Phase = Increase private and public BIM projects = Mandate by Government = Development of standards Drivers of BIM in Qatar - pb did o —_ fabio wae “Ashghal” Public Works Authority of Qatar " Established 2004 = Under Ministry of Municipality « Sustainable development of highways, roads, drainage, and buildings: > Projects Affairs > Assets Affairs » Shared Services Affairs Public Works Authority of Qatar Selected Achievements (2013-2022) 28 35 ceo ngs 11,174,254 sqm 10,388 km rasape 2 Ee. > Hospi ea 2,100 km Reade Length 2 errata 5,820 km aerial ‘Soeur TE 348, 4,000,000 cae No.of ras ome Public Works Authority Guinness World Records Longest Piece of Asphalt Concrete Laid Continuously (25.275 km) Longest Continuous Cycle Path (32.869 km) Longest Air-Conditioned Walking and Running Track (1,143 m) Most Nationalities Planting Trees Simultaneously (66) Largest Electric Bus Depot (478 buses) Longest Motorsport Pitlane Building (402.1 m) O0O0000 Largest Green Roof (4,031 sqm) wae Ashghal BIM Objectives a a ooo Deliver 3D information models for building and infrastructure assets throughout the lifecycle of the project Facilitate collaboration, design proofing, and constructability reviews Ensure a coordinated design by clash avoidance to reduce errors in the field Streamline planning, progress reporting, and cost control Improve commercial and contract management Enhance visualization for communication and decision making Support operation & maintenance with handover of reliable and accurate asset data Take leadership in national BIM implementation Challenges How to implement BIM in such Organisation? * What is our BIM standard? What is the contractual impact? . What is the added cost? * How do we train our people? Will it change our processes? . What computers do we need? Is our supply chain ready? Four Pillars of BIM Foundation Organisation ry es Technology = Ashghal BIM Roadmap & Strategy Staged Implementation oo aoe ooo per ro Peo or Implementation Pore “Development of required “Execution of Plot Projects, “BM ready! Publication of “Enhancement of BIM delivery | foundational elements ike and development of O&M deta _BIM Policy and Ashghal BIM___and AIM use in assets Stratogy BIM Policy end transferconcopts. Training & ‘Standards, mandatoryo operation and maintonanco. | Standards. Defintion of Development ofnshouse BIM —_exocute onal relevent Enable and support Digital | 3 Hardware & Software teams, and Cloud Technology projects inc. delivery of Transformation to Use : standards, as well as, ‘mplementaton.” ‘gal asset information innovative construction 3 Businoss Processes" ‘models and dat.” fechnologies in Project Detivery" neers es ered Eran teeny © BIM Governance Function © Corporate BIM Policy @ Ashghal BIM Standards (ABIMS) @ Contractual Terms & Conditions Cee Cons ceca Rely BIM Object Library [eer tol N Sele} Corporate BIM Policy 2. Busing information Modeling * Company's commitment to implement BIM * Execute BIM on all relevant projects © Delivery of AIM at project handover © In-house design using BIM methodology * Implement a Common Data Environment (CDE) * Develop BIM competency of employees BIM Standards Review of References ox Peery Information managem Acree tecording fo BS EN 150 1630 | She formation management Information protocol to etry en ener geen PROJECT aT GaN ce GUIDE —Ukin =5, Pees International Standards ISO 19650 is a series of international for the ated to the andards that ctiv livery and ISO 19650-1:2018 - Concepts and principles ISO 19650-2:2018 - Delivery phase of the assets ISO 19650-3:2020 - Operational phase of assets ISO 19650-4:2022 - Information exchange ISO 19650-5:2020 - Security-minded management For detals to ISO Standards please refer to: httos wmwiso.o19 Ashghal BIM Standards (ABIMS) Comprehensive set of standards for BIM project Tender and Delivery, containing Guides, Specifications and Templates. wae Ashghal BIM Standards (ABIMS) fs ssn a si H as Ashghal BIM Standards (ABIMS) Publication on Website BIM Object Library For in-house design teams (Buildings, Roads, Drainage) (a oe oe oe ed @@enrétt = EERO ifojefere) 1) 1 ite Buildings Organisation epinrisn meeneten fe Move on =A seo eR Axes Te Cesta ENS fc Meanie a Prete ae eRe ee a Rea an eeu ert eed Coe ey ome Nena aS @ Supply Chain Support & Development [oer ee a SLC ea Rl eC case m ter c) Organisation Hybrid BIM Organisation 22 a3, free a2 i) \ Fret Fest Aaa 23 a Decentralised Centralised Digtal capably i ebaced slay in uncone single ease th hating Acorraed group, bl wih some digital Snr market andlor ios of Bisness responsi oral gta acy opabiies embesded m tne mer ‘erganvation BIM Roles and Respon: eI RSet cia experienced senior role, managing and eT ett TE ole eee eer) ae Ce ares ney Cees ae COE tones Learning & Development Programme a REECE [51 Sofware Training: Design Authoring (Arctecir) S2 ‘Software Training: Design Authoring (Structure) ss ‘Software Training: Design Authoring (MEP) s4 ‘Software Training: Design Authoring (Infrastructure) SESE Dees 82 BM for Construction 86 Software Training: 83 IM for Operation and Maintenance 87 Software Training: 8 ‘Software Training: 89 Software Training: 810 Software Training: Measurement & Cost Management 50 Design Review Design Coordination Model Viewing Rendering & Visualisation Technology Cee eeenre 1AM =] MRS te Lie MIC Key oes one RS) Ure ey @ Cloud Technologies ™ Common Data Environment Cee ao CB Me eae wees PC Configurations eg requ Oe Appleatons = “Scena cae 2 Fete codon ra engin anaysig Software & Information Exchange + A Naren Name ate" te Hear Tae ese om se Q\ AUTODESK EE Microsoft 365 gy surooesc ancurecrune, ENGINEERING & CONSTRUCTION COLLECTION aurooesk CONSTRUCTION ctoup SYNCHRO" Cloud Collaboration #4 AUTODESK Platform Services AUTODESK’ CONSTRUCTION ‘Common Data Environment (CDE) cLoup aa Operation @ Tendering & Contracting © Identification & Definition of BIM Uses eee scotia Quality Assurance (QA/QC) eRe ree mee eae act) Ce Bae crsd Moora Sa erry (eae INR Mtr rmKe eon a ea atery Cet eer ea Cie eu BIM Uses over Project Stages rite nuees E eeteneronea etic © ® Data Transfer to O&M Systems Ey FME, ra CoN ed Pumping Station Roads ' Eero) Network Decay Z a Eines Drainage a fs Network Bridges Project Monitoring Dashboards xR SharePoint al Power BI Ashghal BIM Projects Selection from different Departments Tus Electric Bus Depot a eo i 7 ae alli aris Glia 3N & CONSTRUCTION LUSAIL ELECTRIC BUS DEPOT ESIG Digital Construction Digital Construction Gh 14, : SS %, alse “yal Digital Twins Real-time Monitoring: Digital twins provide real-time insights into the physical project's performance and condition. Simulation: Digital twins simulate scenarios for better decision-making and risk assessment. Predictive Maintenance: Digital twins predict equipment and asset maintenance needs Lifecycle Management: Digital twins support asset management from design to decommissioning. loT Integration: Digital twins incorporate data from loT sensors for comprehensive monitoring. AR/VR cy TE) Immersive Design: AR and VR offer immersive experiences for design visualization and walkthroughs. Enhanced Training: VR can be used for worker training, enhancing safety and efficiency. Remote Collaboration: AR enables remote experts to guide on-site workers through complex tasks using augmented annotations. Marketing and Sales: AR and VR are used in real estate and construction marketing to showcase properties and designs. Safety Planning: AR overlays safety information and alerts on construction sites, improving worker safety. Artificial Intelligence Contract Management: Al analyzes project scope to identify and improve language and eliminate errors. * Predictive Analytics: Machine learning predicts project delays and cost overruns based on historical data. * Safety Monitoring: Al monitors construction sites for safety compliance and alerts to potential hazards. * Quality Control: Al detects defects and ensures construction quality meets standards. * Schedule Optimization: Al optimizes project schedules to improve efficiency and meet deadlines. Wearables / loT ee a Worker Safety: Wearable devices and loT sensors enhance worker safety by monitoring environmental conditions, detecting hazards, and providing real-time alerts. Asset Tracking: loT technology tracks the location and status of construction equipment and materials, reducing theft and improving resource management. Data Collection: Wearable devices and loT sensors collect valuable data on worker productivity, equipment performance, and site conditions, enabling data-driven decision-making. Predictive Maintenance: loT sensors predict equipment maintenance needs, reducing downtime and extending the lifespan of construction machinery. Remote Monitoring: Construction sites can be remotely monitored through loT-connected cameras and sensors, improving security and project oversight oa cae * 3D Data Capture: Laser scanning and LiDAR technologies capture highly accurate 3D data of construction sites, ‘enabling precise as-built documentation * Site Surveying: Thoy facilitate rapid and comprehensive site surveys, reducing manual measurement efforts and enhancing survey accuracy. + As-Built Verification: Laser scanning and LIDAR assist in verification of the as-built conditions with the original design, preventing costly errors. ‘* Progress Monitoring: These technologies allow for real- time monitoring of construction progress, helping to ensure projects stay on schedule. * Asset Management: Laser scanning and LIDAR data support asset management by creating detailed inventories of site features, equipment, and structures. Conclusion Top-down implementation approach with strong support from higher management Corporate BIM Policy and Standards Z BIM is not just technology Use Four Pillars of BIM for any organization Define your staged Roadmap Identify your need and embark on your individual Digital Construction journey Thank you! CCL Re ee Reutty Robert Grys eo eae aed BIM & Digital Construction arene aCe) State of Qatar rarys@ashghal.gov.qa 04 AU 2023 THE DESIGN & MAKE CONFERENCE

You might also like