1.

0
0.22 0.22
5.70
0.22

3NO.S(T&B)

0.25m
THK 100 C/C MANHOLE OPENING DETAIL
2.10

0.22
@150 c/c

0.88
1 1
100 C/C

0.22
0.44 0.44
0.22

0.88

MANHOLE COVER SLAB

BOTTOM SLAB REINFORCEMENT DETAILS


0.88

0.075 HOOK BAR

0.09
0.70
DRG NO:
@150c/c
SECTION 1-1
0.22 0.22 02/CE/APEWIDC/100 USERS/SEPTIC TANK DETAILS-2
5.70
0.20 PROJECT:
3.60 1.90 NOTES:-
1. DO NOT SCALE THE DRAWING.READ FIGURED DIMENSIONS ONLY.
2. REFERENCE BENCH MARKS SHALL BE AS PER SITE CONDITIONS. CONSTRUCTION OF SEPTIC TANKS
0.22

1
3. USE NOMINAL MIX (1:1( 2):3) PRO.OF CONCRETE FOR FOR HIGH SCHOOL UNDER
ALL R.C.C MEMBERS. MANABADI:NAADU-NEDU
4. GRADE OF STEEL SHALL BE Fe500.
0.125m 0.125m 5. CLEAR COVER FOR MAIN REINFORCEMENT: IN AP STATE
THK @400 C/C THK @400 C/C FACE SIDE WALLS BASE SLAB
WATER FACE 25mm 25mm SHEET TITLE:
EARTH FACE 30mm 40mm
6. FIELD AUTHORITIES ARE REQUESTED TO ENSURE THE
@400 C/C @400 C/C
@200 C/C @200 C/C DIMENSIONS BEFORE TAKEN UP FOR EXECUTION.
7. PROVIDE CLIPS TO SEPARATE REINF. GRILLS ON FACES OF SIDE MODEL DRAWING FOR
2.10

WALLS. SEPTIC TANK DETAILS-2


8. THE PROVISIONS MADE IN IS 456-2000, 3370, SP34,
IS 2470 (PART 1&2)-1985 AND OTHER RELEVANT CODES SHOULD
(FOR 100 USERS)
BE STRICTLY ADHERED DURING EXECUTION.
9. SLEEVES FOR ALL PIPE CONNECTIONS INLET & OUTLET SHALL
@200 C/C @200 C/C BE PROVIDED BEFORE CONCRETING.
10. REINFORCEMENT IN SLABS ARE CRANKED AT 0.25L NEAR
CONTINUOUS EDGE AND 0.15L NEAR DISCONTINUOUS EDGE.
(L=SPAN FROM c/c OF SUPPORT) THE CRANKED BARS AND
//APPROVED//
OTHER EXTRA BARS OVER CONTINUOUS EDGE SHOULD BE
TAKEN UPTO 0.3L FROM FACE OF SUPPORT ON EITHER SIDE OF Sd/-xxxxx
0.22

THE BEAM SUPPORTS UNLESS OTHERWISE INDICATED IN THE CHIEF ENGINEER


DRAWING. A.P.E.W.I.D.C, VIJAYAWADA.
11. CHECK ALL THE REINFORCEMENT BARS BEFORE POURING THE
CONCRETE INTO RC MEMBERS.
12. CONTINUOUS CURING SHALL BE DONE FOR AT LEAST 15DAYS.
TOP SLAB REINFORCEMENT DETAILS
TO SUPPORT THE TOP MESH OF SLAB REIF.
14. DEVELOPMENT LENGTH OF RODS IS 49 TIMES OF Dia. //TRUE COPY//
15. INLET & OUTLET PIPES LOCATION SHOWN ARE REPRESENTATIVE
OR INDICATIVE AND TO BE PROVIDED AS PER REQUIREMENT
AT SITE.
16. SEPTIC TANK IS TO BE CLEANED ONCE IN A YEAR. EXECUTIVE ENGINEER
17. PROVIDE 600X600 PRECAST MANHOLE COVER FOR SOAKPIT AND
SEPTIC TANK.
A.P.E.W.I.D.C, VIJAYAWADA.

THE DRAWING IS PROPERTY OF CONSULTANT, IT SHOULD NOT BE USED, COPIED OR REPRODUCED WITHOUT THEIR WRITTEN PERMISSION.