SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02
This document is issued in Pulse.

Table of Contents

TABLE OF CONTENTS 1

PURPOSE OF THE SYSTEM 2

GENERAL DESCRIPTION OF THE SYSTEM 2

MAIN COMPONENTS 3

FUNCTION 12
Start up 12
Continuous operation 12
© Siemens Industrial Turbomachinery AB

Turbine stop 12
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third

Cooling down 12
Parties without express authority is strictly forbidden.

Stand still 12

DISTURBANCES 12
Gas turbine trip 12
Generator breaker trip 12
Loss of power supply 13
System faults 13
Other faults 13

TECHNICAL SPECIFICATION 14
Design criteria and standards 14
Dimensioning data 14
Emergency power supply 14
Installation 14

TESTING AND SERVICE 15


Testing during normal operation 15
Accessibility during normal operation 15

INDEX OF COMPONENTS 16
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

2 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02
This document is issued in Pulse.

Purpose of the system


The purpose of the generator system is to transform mechanical shaft power into electrical 3-phase
power which is adopted to voltage and frequency levels of the receiving power system.

General description of the system


P&ID: 2910410
Single Line Diagram MV: 1CS129586
Siemens Circuit Diagram 1CS128283

The ABB AC generator is a 4-pole synchronous AC generator of salient pole type manufactured by
ABB in Sweden.
© Siemens Industrial Turbomachinery AB
We reserve all rights in this document and in the information

The generator is of a compact welded steel design. The design concept makes very efficient use of
contained therein. Reproduction, use or disclosure to third

active material employed, resulting in optimal performance with good economy and an
Parties without express authority is strictly forbidden.

exceptionally low total weight.

Special emphasis has been placed on designing an electrical machine with good mechanical
stability. The box shaped machine base design allows the stator core with windings to rest directly
on the foundations, thus ensuring that all static and dynamic forces are transmitted directly into the
foundation.

A combination of short distance between the bearing centres and rigid bearing supports placed
under the centre of each bearing, minimises the level of vibration. Traditional sleeve bearings of
split type design are employed. The bearing liners are easily replaceable.

The rotor is of salient pole design running below the first lateral critical speed with a safe margin. A
very high thermal capacity is characteristic for this rotor design.
The shaft can be designed for double end drive, an often cost effective solution in combined cycles
where the gas turbine can drive the generator from one end and the steam turbine from the other.

Brushless excitation is achieved by a rotating exciter mounted on the main shaft outside the bearing
at the non driven end. The excitation power is taken from a permanent magnet generator driven by
the main generator shaft. The equipment is easy accessible for inspection.
The AC generator is tested according to a standard inspection plan issued by ABB.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

3 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02
This document is issued in Pulse.

Main components
• Generator
MKA10
The generator comprise following main components:
- Stator
- Rotor
- Stand still heater elements

• Exciter
MKC10
The exciter comprise following main components:
- Exciter with rotating diodes
- Pilot exciter
© Siemens Industrial Turbomachinery AB

- Stand still heater element


We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third

• Automatic Voltage Regulator-Dual channel


Parties without express authority is strictly forbidden.

MKY10
- AVR modules in dual channel arrangement. A heat sink module with molded components,
rectifier, CPU with regulating software, IGBT chopper and a set of interface terminals. The unit is
designed for either AC or DC supply as per technical data.
- Field circuit breakers.
-External diode bridges/rectifiers and smoothing capacitors for feeding the AVR module.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

4 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02

• HIGS(Highly Integrated Generator Breaker Solution)


This document is issued in Pulse.

+BAC10
The HIGS cubicle is an integral part of the generator. HIGS cubicle is directly attached to the generator and
is divided into three compartments and control cubicle. Generator compartment, main transformer- and
auxiliary transformer compartment. The control cubicle contains all secondary circuits and AVR etc.
The following equipment is installed in HIGS:
- Generator circuit breaker, see below.
- Disconnector on line side, see below.
- Voltage transformers on both sides of the generator circuit breaker, see below.
- Current transformers on line- respective neutral side, see below.
- Surge capacitor (suppressor) on line side, see below
- Surge arrester on line side, see below.
- Anti condensation heater element, see below.
- Grounding resistor, see below.
- Earthing switches, see below.
© Siemens Industrial Turbomachinery AB

- Earthing switch, auxiliary transformer compartment. See below.


We reserve all rights in this document and in the information

- Load breaker, auxiliary compartment, see below.


contained therein. Reproduction, use or disclosure to third

- Disconnector, auxiliary compartment, see below.


Parties without express authority is strictly forbidden.

- HRC fuse, auxiliary compartment, see below.


-A/C unit

For more detailed information. See sub supplier documentation.

• Voltage transformer, GCB grid side


+BAC10CE001.T6.L1
+BAC10CE001.T6.L2
+BAC10CE001.T6.L3
The transformer measures grid voltage for synchronisation.

• Voltage transformer, GCB generator side


+BAC11CE003.T5.L1
+BAC11CE003.T5.L2
+BAC11CE003.T5.L3
The transformer measures generator voltage for AVR, metering, synchronisation and protection.

• Current transformer, generator line side


+BAC11CE002.T2.L1
+BAC11CE002.T2.L2
+BAC11CE002.T2.L3
The transformer measures current on the generator line side. Each transformer measures in one
phase and has four cores; one core is used for transducer Active power (DP344), two for protection
and one spare reserved for customer differential protection.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

5 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02

• Current transformer, generator neutral side


This document is issued in Pulse.

+BAC11CE001.T4.L1
+BAC11CE001.T4.L2
+BAC11CE001.T4.L3
The transformer measures current on the generator neutral side. Each transformer measures in one
phase and has three cores; one core is used for the AVR, two for protection.

• Surge capacitor
+BAC10GV002.C01.L1
+BAC10GV002.C01.L2
+BAC10GV002.C01.L3

• Surge arrester
+BAC10GV003.F01.L1
+BAC10GV003.F01.L2
© Siemens Industrial Turbomachinery AB

+BAC10GV003.F01.L3
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Parties without express authority is strictly forbidden.

• Heater element
+BAC10.E200
+BAC10.E201
+BAC10.E202
+BAC10.E203

• Grounding resistor
+BAC11GV001.R01

• Earthing switch, generator grid side


+BAC11GS003.Q15.L1
+BAC11GS003.Q15.L2
+BAC11GS003.Q15.L3

• Earthing switch, main transformer compartment


+BAC10GS003.Q16.L1
+BAC10GS003.Q16.L2
+BAC10GS003.Q16.L3
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

6 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02

• Earthing switch, auxiliary transformer compartment


This document is issued in Pulse.

+BAC12GS003.Q17.L1
+BAC12GS003.Q17.L2
+BAC12GS003.Q17.L3

• Generator circuit breaker


+BAC11GS001.Q01
• Disconnector, generator breaker compartment
+BAC11GS002.Q1

• Control cubicle
+BAC10GH100
The control cubicle is attached against the HIGS. It contains all the secondary circuits and
apparatus. The following equipment is installed in the terminal box:
© Siemens Industrial Turbomachinery AB

- AVR (Automatic Voltage Regulators.)


We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third

- MCB:s for AVR, protection/measuring, see below.


Parties without express authority is strictly forbidden.

- Terminals for current transformers, line respective neutral side.


- Control panel on the front.

• MCB, Grid voltage


+BAC10GH100.F6.2
The Miniature Circuit Breaker protects the AVR measuring circuit from overload/overcurrent.
Tripped MCB gives an alarm.

• MCB, Generator voltage


+BAC10GH100.F5
The Miniature Circuit Breaker protects the AVR measuring circuit from overload/overcurrent.
Tripped MCB gives an alarm and transfers the voltage regulation to FCR (Field Current Regulator).
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

7 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02

• MCB’s, protection/measuring
This document is issued in Pulse.

+BAC10GH100.F5.1, MCB
Generator protection sub.1
+BAC10GH100.F5.2, MCB
Generator protection sub.2
+BAC10GH100.F5.3, MCB
Measurement for synchronising
+BAC10GH100.F5.4, MCB
Active Power transducer
+BAC10GH100.F5.5, MCB
Open delta/earth fault-sub1
+BAC10GH100.F5.6, MCB
Open delta/earth fault-sub2
© Siemens Industrial Turbomachinery AB

The Miniature Circuit Breakers protects the generator protection respective measuring circuits from
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third

overload/overcurrent. An alarm is given if any of the MCB’s is tripped (excluding spare MCB).
Parties without express authority is strictly forbidden.

• Field instruments terminal box


+MKA10GA004
The following equipment is installed in the terminal box:
- Terminals for field instruments on generator, see below.

• Heater elements terminal box


+MKA10GA006
The following equipment is installed in the terminal box:
- Terminals for stator heater elements, see below.

• PMG terminal box


+MKA10GA007
The following equipment is installed in the terminal box:
- MCB:s for the excitation system PMG, see below.

• MCB, PMG
+MKA10GA007.F01
+MKA10GA007.F02

The Miniature Circuit Breaker protects the PMG circuit from overload/overcurrent.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

8 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02

• Generator heater
This document is issued in Pulse.

MKA10AH005
The generator is equipped with following anti-condensation stand still heater elements:

MKA10AH005.R01
Heater element, generator hausing
MKA10AH005.R02
Heater element, generator hausing
MKA10AH005.R03
Heater element, generator hausing
MKA10AH005.R04
Heater element, generator hausing
MKA10AH005.R05
Heater element, generator hausing
MKA10AH005.R06
© Siemens Industrial Turbomachinery AB

Heater element, generator hausing


We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third

The heater elements are connected so that they form one 3-phase power consumer.
Parties without express authority is strictly forbidden.

MKA10AH015.R01
Heater element in hood

MKC10AH005.R01
Heater element, exciter

• Temperature transmitter, bearing metal DE


MKA10CT005
The Pt100 sensor measures the driven end bearing metal temperature.
High metal temperature (H1) gives an alarm and if the second alarm level (H2) is reached manual
shutdown is required.

• Temperature transmitter, bearing metal NDE


MKA10CT010
The Pt100 sensor measures the non driven end bearing metal temperature.
High metal temperature (H1) gives an alarm and if the second alarm level (H2) is reached manual
shutdown is required.

• Temperature transmitter, incoming air DE


MKA10CT015
The Pt100 sensor measures temperature of the cooling air coming to the generator in the driven end.
Cooling air temperature above (H1) gives an alarm.

• Temperature transmitter, outgoing air


MKA10CT020
A 087 0474-B 00-03 MS Word 97

The Pt100 sensor measures temperature of the cooling air leaving the generator.
High outgoing cooling air temperature (H1) gives an alarm.

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

9 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02

• Temperature transmitter, incoming air NDE


This document is issued in Pulse.

MKA10CT025
The Pt100 sensor measures temperature of the cooling air coming to the generator in the non driven
end.
Cooling air temperature above (H1) gives an alarm.
The signal is used for indication and also in the AVR for biasing of the Field current limiter.

• Temperature transmitter, stator winding phase L1


MKA10CT030
The Pt100 sensor measures the temperature at the phase L1 stator winding.
Winding temperature above (H1) gives event, high winding temperature (H2) gives an alarm and
high temperature (H3) initiates alarm and after 5 min. unloads the turbine.

• Temperature transmitter, stator winding phase L1


MKA10CT031-Spare
© Siemens Industrial Turbomachinery AB
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third

• Temperature transmitter, stator winding phase L1


Parties without express authority is strictly forbidden.

MKA10CT032
The Pt100 sensor measures the temperature at the phase L1 stator winding.
Winding temperature above (H1) gives event, high winding temperature (H2) gives an alarm and
high temperature (H3) initiates alarm and after 5 min. unloads the turbine.

• Temperature transmitter, stator winding phase L1


MKA10CT033
The Pt100 sensor measures the temperature at the phase L1 stator winding.
Winding temperature above (H1) gives event, high winding temperature (H2) gives an alarm and
high temperature (H3) initiates alarm and after 5 min. unloads the turbine.

• Temperature transmitter, stator winding phase L2


MKA10CT035
The Pt100 sensor measures the temperature at the phase L2 stator winding.
Winding temperature above (H1) gives event, high winding temperature (H2) gives an alarm and
high temperature (H3) initiates alarm and after 5 min. also unloads the turbine.

• Temperature transmitter, stator winding phase L2


MKA10CT036-Spare

• Temperature transmitter, stator winding phase L2


MKA10CT037
The Pt100 sensor measures the temperature at the phase L2 stator winding.
Winding temperature above (H1) gives event, high winding temperature (H2) gives an alarm and
high temperature (H3) initiates alarm and after 5 min. also unloads the turbine.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

10 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02

• Temperature transmitter, stator winding phase L2


This document is issued in Pulse.

MKA10CT038
The Pt100 sensor measures the temperature at the phase L2 stator winding.
Winding temperature above (H1) gives event, high winding temperature (H2) gives an alarm and
high temperature (H3) initiates alarm and after 5 min. also unloads the turbine.

• Temperature transmitter, stator winding phase L3


MKA10CT040
The Pt100 sensor measures the temperature at the phase L3 stator winding.
Winding temperature above (H1) gives event, high winding temperature (H2) gives an alarm and
high temperature (H3) initiates alarm and after 5 min. also unloads the turbine.

• Temperature transmitter, stator winding phase L3


MKA10CT041-Spare
© Siemens Industrial Turbomachinery AB

• Temperature transmitter, stator winding phase L3


We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third

MKA10CT042
Parties without express authority is strictly forbidden.

The Pt100 sensor measures the temperature at the phase L3 stator winding.
Winding temperature above (H1) gives event, high winding temperature (H2) gives an alarm and
high temperature (H3) initiates alarm and after 5 min. also unloads the turbine.

• Temperature transmitter, stator winding phase L3


MKA10CT043
The Pt100 sensor measures the temperature at the phase L3 stator winding.
Winding temperature above (H1) gives event, high winding temperature (H2) gives an alarm and
high temperature (H3) initiates alarm and after 5 min. also unloads the turbine.

• Vibration transducer, DE
MKA10CY005
The accelerometer sensor measures vibration on the generator drive end bearing casing.
High vibration (H1) gives an alarm, high vibration (H2) gives an unloading shutdown and high
vibration (H3) gives turbine trip.

• Vibration transducer, NDE


MKA10CY010
The accelerometer sensor measures vibration on the generator non drive end bearing casing.
High vibration (H1) gives an alarm, high vibration (H2) gives an unloading shutdown and high
vibration (H3) gives turbine trip.

• Vibration transducer, DE
MKA10CY035
The accelerometer sensor measures vibration on the generator non drive end bearing casing.
High vibration (H1) gives an alarm, high vibration (H2) gives an unloading shutdown and high
A 087 0474-B 00-03 MS Word 97

vibration (H3) gives turbine trip.

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

11 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02

• Vibration transducer, DE
This document is issued in Pulse.

MKA10CY040
The accelerometer sensor measures vibration on the generator non drive end bearing casing.
High vibration (H1) gives an alarm, high vibration (H2) gives an unloading shutdown and high
vibration (H3) gives turbine trip.

• Vibration transducer, NDE


MKA10CY045
The accelerometer sensor measures vibration on the generator non drive end bearing casing.
High vibration (H1) gives an alarm, high vibration (H2) gives an unloading shutdown and high
vibration (H3) gives turbine trip.

• Vibration transducer, NDE


MKA10CY050
The accelerometer sensor measures vibration on the generator non drive end bearing casing.
© Siemens Industrial Turbomachinery AB

High vibration (H1) gives an alarm, high vibration (H2) gives an unloading shutdown and high
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third

vibration (H3) gives turbine trip.


Parties without express authority is strictly forbidden.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

12 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02
This document is issued in Pulse.

Function

Start up
The generator voltage is controlled by the voltage regulator and the generator speed is determined
by the turbine during start up.

Continuous operation
The reactive power produced by the generator is determined by the voltage regulator and the active
power is determined by the turbine.

During continuous turbine operation the anti-condensation heaters in the stator, exciter and the
HIGS is switched off.
© Siemens Industrial Turbomachinery AB
We reserve all rights in this document and in the information

Turbine stop
contained therein. Reproduction, use or disclosure to third
Parties without express authority is strictly forbidden.

The generator coasts down.

Cooling down
The gear, gas turbine and generator are rotating at barring speed during the gas turbine cooling
down period.

Stand still
During standstill the anti-condensation heaters shall be switched on.

Disturbances

Gas turbine trip


After a gas turbine trip the generator coasts down with the power turbine and gear. The lube oil
supply to the generator is ensured by the gas turbine lube oil system.

Generator breaker trip


The load throw off from the generator will give an overspeed. The turbine controller will control the
turbine and return it to synchronous speed. The turbine controller will then keep the generator at
synchronous speed. The voltage regulator will control the generator voltage at nominal voltage.
A 087 0474-B 00-03 MS Word 97

Decision has then to be taken whether the unit should be shut down or synchronised and loaded
again.

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

13 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02
This document is issued in Pulse.

Loss of power supply


Loss of power supply does not directly affect the system. The lube oil supply to the generator is
ensured by the gas turbine lube oil system. The generator can be without lube oil when the rotor is
at standstill.

System faults
If there are any damages on the generator the gas turbine unit may not be started or has to be shut
down.

- Electrical faults
The generator protection system protects the generator at internal electrical faults by tripping the
generator circuit breaker and if necessary also the turbine and the excitation circuit breaker.

The measuring/protection circuits are protected by an MCB on respective circuit, which will trip on
© Siemens Industrial Turbomachinery AB

overcurrent/overloading.
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Parties without express authority is strictly forbidden.

The PMG circuit is protected by an MCB which will trip on overcurrent/overloading.

The stator winding temperature in each phase is monitored and alarm is given if any of them goes
high. Should the temperature continue to increase then an unloading turbine trip is initiated.

- Bearings
Wear or damage to the bearings gives high vibration or/and high bearing metal temperature.
Generator vibration respective bearing metal temperature is monitored and alarm is given if any of
them goes high.

Other faults
Fault in connecting systems:

- Electrical faults
The relay protection system protects the generator at external electrical faults by tripping the
generator circuit breaker and if necessary also the turbine and excitation circuit breaker.

- Lube oil system


Fault in the lube oil system may result in incorrect incoming lube oil temperature and/or pressure to
the generator. These parameters are monitored in the lube oil system and the turbine is tripped at too
low pressure respective at too high temperature.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

14 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02
This document is issued in Pulse.

Technical specification

Design criteria and standards


EN, IEC

Dimensioning data
The generator is designed to match the turbine output curve. The turbine output at base load
operation (TBO 40000h) shall be generated with a PF of 0.8 with temperature rise as per class B at
nominal voltage and frequency.

The generator shaft/flange is designed for 5 x nominal torque in order to withstand a 2 phase short
© Siemens Industrial Turbomachinery AB

circuit.
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Parties without express authority is strictly forbidden.

Emergency power supply


The generator requires lube oil during operation and coast down, but can be without lube oil when
the rotor is at standstill.

Installation
A protective cover for the shaft/coupling shall be installed.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

15 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02
This document is issued in Pulse.

Testing and service


A grounding ball is available at each phase on generator line side, for safety grounding during
maintenance on generator.

Testing during normal operation


No testing during normal operation is required.

Accessibility during normal operation


Terminal boxes and protection MCB’s may be accessed during normal operation.
© Siemens Industrial Turbomachinery AB
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Parties without express authority is strictly forbidden.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

16 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02
This document is issued in Pulse.

Index of Components
+BAC11CE003.T5
Voltage transformer, phase L1 4
+ Voltage transformer, phase L2 4
Voltage transformer, phase L3 4
+BAC10 +BAC11GS001.Q01
HIGS 4 Generator circuit breaker 6
+BAC10.E200 +BAC11GS002.Q1
Heater element 5 Disconnector 6
+BAC10.E201 +BAC11GS003.Q15
Heater element 5 Earthing switch, phase L1 5
+BAC10.E202 Earthing switch, phase L2 5
Heater element 5 Earthing switch, phase L3 5
+BAC10.E203 +BAC11GV001.R01
Heater element 5 Grounding resistor 5
+BAC10CE001.T6 +BAC12GS003.Q17
Voltage transformer, phase L1 4 Earthing switch, phase L1 6
© Siemens Industrial Turbomachinery AB

Voltage transformer, phase L2 4 Earthing switch, phase L2 6


Voltage transformer, phase L3 4
We reserve all rights in this document and in the information

Earthing switch, phase L3 6


contained therein. Reproduction, use or disclosure to third

+BAC10GH100 +MKA10GA002.F5
Control cubicle 6 MCB, Active Power transducer 7
Parties without express authority is strictly forbidden.

+BAC10GH100.F5 +MKA10GA004
MCB, AVR 6 Field instruments terminal box 7
+BAC10GH100.F5.1 +MKA10GA006
MCB, Generator protection sub.1 7 Heater elements terminal box 7
+BAC10GH100.F5.2 +MKA10GA007
MCB, Generator protection sub.2 7 PMG terminal box 7
+BAC10GH100.F5.3 +MKA10GA007.F01
MCB, Measurement for synchronising 7 MCB, AVR 7
+BAC10GH100.F5.5 +MKA10GA007.F02
MCB, Generator protection sub.1 7 MCB, AVR 7
+BAC10GH100.F5.6
MCB, Generator protection sub.2 7
+BAC10GH100.F6.2 M
MCB, AVR 6
+BAC10GS003.Q16 MKA10
Earthing switch, phase L1 5 Generator 3
Earthing switch, phase L2 5 MKA10AH005
Earthing switch, phase L3 5 Generator heater 8
+BAC10GV002.C01 MKA10AH005.R01
Surge capacitor, phase L1 5 Heater element, hausing 8
+BAC10GV002.C02 MKA10AH005.R02
Surge capacitor, phase L2 5 Heater element, hausing 8
+BAC10GV002.C03 MKA10AH005.R03
Surge capacitor, phase L3 5 Heater element, hausing 8
+BAC10GV003.F01 MKA10AH005.R04
Surge arrester, phase L1 5 Heater element, hausing 8
+BAC10GV003.F02 MKA10AH005.R05
Surge arrester, phase L2 5 Heater element, hausing 8
+BAC10GV003.F03 MKA10AH005.R06
Surge arrester, phase L3 5 Heater element, hausing 8
+BAC11CE001.T4 MKA10AH015.R01
Current transformer, neutral side, phase L1 5 Heater element in Cubicle 8
Current transformer, neutral side, phase L2 5 MKA10CT005
Current transformer, neutral side, phase L3 5 Temperature Transmitter 8
A 087 0474-B 00-03 MS Word 97

+BAC11CE002.T2 MKA10CT010
Current transformer, line side, phase L1 4 Temperature Transmitter 8
Current transformer, line side, phase L2 4 MKA10CT015
Current transformer, line side, phase L3 4 Temperature Transmitter 8

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541
Sheet

17 (17)
Respons. dept Date Reg. )
SYSTEM DESCRIPTION OEEE1 2013-07-01
MKA Prepared
Missan Oil
GENERATOR SYSTEM P.Stenholt BD000130-U01-U02
This document is issued in Pulse.

MKA10CT020 Temperature Transmitter 10


Temperature Transmitter 8 MKA10CT042
MKA10CT025 Temperature Transmitter 10
Temperature Transmitter 9 MKA10CT043
MKA10CT030 Temperature Transmitter 10
Temperature Transmitter 9 MKA10CY005
MKA10CT031 Vibration Transducer 10
Temperature Transmitter 9 MKA10CY010
MKA10CT032 Vibration Transducer 10
Temperature Transmitter 9 MKA10CY035
MKA10CT033 Vibration Transducer 10
Temperature Transmitter 9 MKA10CY040
MKA10CT035 Vibration Transducer 11
Temperature Transmitter 9 MKA10CY045
MKA10CT036 Vibration Transducer 11
Temperature Transmitter 9 MKA10CY050
MKA10CT037 Vibration Transducer 11
Temperature Transmitter 9 MKC10
MKA10CT038 Exciter 3
Temperature Transmitter 10 MKC10AH005.R01
© Siemens Industrial Turbomachinery AB

MKA10CT040 Heater element, exciter 8


We reserve all rights in this document and in the information

Temperature Transmitter 10 MKY10


contained therein. Reproduction, use or disclosure to third

MKA10CT041 AVR 3
Parties without express authority is strictly forbidden.
A 087 0474-B 00-03 MS Word 97

Approved Latest revision Archive HG


2013-07-05 A First issue
Thomas Eriksson 4430
Checked No.
2013-07-05
Teuta Cota 1CS135541

You might also like