Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

CRYSTAL OFFSHORE PTE LTD Co. Reg. No.

200511585Z

The information in the facsimile message is Confidential, intended only for the use of the individual or entity named below.
If you have received this message in error, please notify us immediately and destroy this facsimile.

Quotation Ref.: ENQ5327-2023 Dt.: 01.07.2023

BORR DRILLING
RIG : HILD

Kind Attn.: Mr. Subhash

Dear Sir,

Subject: Replacement of Hydraulic Hose


We thank you for the opportunity to quote for carrying out following work and take pleasure to submit our offer as follows:

REPLACEMENT OF HYDRAULIC HOSES ON CRANE


Scope of work:
1) Material of construction:
Material: A36, S275JR or equivalent
Round bar : 4140
EH 36 Plate welded with round bar
2) Fabrication: As per enquiry drawing, Material, equipment, consumables and Skilled man power supply to
fabricate the Saver sub as per client supplied drawing
3) NDT :
4) Blasting and Painting: Blast to SA 2.5 and perform 2 coats. Final colour be advised by client
5) Qty: 1 no

Drawing :

PRICING:
Crystal Offshore Pte Ltd
No. 29 Pioneer Sector 1 Singapore 628434
Telephone +65 6572 4169 Facsimile +65 6861 1083
CRYSTAL OFFSHORE PTE LTD Co. Reg. No. 200511585Z

The information in the facsimile message is Confidential, intended only for the use of the individual or entity named below.
If you have received this message in error, please notify us immediately and destroy this facsimile.

Page 2
Total cost for ONE unit of saver sub will be SGD: 3800.00

NOTE:

 Quoted price is based on above listed activity.


 In the event of any changes in scope, we shall revise our offer
 Third-Party approvals/witness, etc are not considered other than Clients rep.
 Invoicing will be based on actual works hours worked based on the timesheet signed.
 Manpower supply based on minimum 3 days.
 Supply of Welding machine and generator will be calculated on a weekly basis and will not be pro-rated.
 Manpower charges will be calculated on a daily basis (min 9 hrs) and will not be pro-rated.
 Exclude assembly works on board the rig.
 Delivery within Singapore.

Delivery Period: 2 Weeks after the receipt of client PO


Payment Term: 30 days
Quotation Validity: 15 Days.

We trust that the above would meet with your approval and look forward to receiving your further instructions

Best Regards

Murugan

Crystal Offshore Pte Ltd


No. 29 Pioneer Sector 1 Singapore 628434
Telephone +65 6861 5885 Facsimile +65 6861 5335

You might also like