KUMAR CREATIONS PVT. LTD.

Talcher Thermal Power Station , Talcher, Angul , Odisha

CONTROLED BLASTING CLOSING REPORT


Explosive NONEL (OMEGA CDET) ED Vibration Record (mm/s)
Date of Explosive Stn-1
SL. NO. Area Date of Drilling Date of filling Explosive Date of Blasting Burden (M) Spacing (M) Type Explosive Total Hole Charged TD 17/250 (6 M) TD 17/250 (6 M) TD 17/250 (7 M) TD 17/250 (7 M) TLD 42 MS (3 M) TLD 42 MS (3 M) TLD 25 MS (3 M) TLD 25 MS (3 M) ED668 ED668 Stn-1 (EDC Remark
van entry Used(Kg) Returned (Kg) (Jagannathpur
Used Returned Used Returned Used Returned Used Returned Used Returned BUILDING)
Gate)
1 ### BOILER#01 26.03.2023 Not Filled Canceled Cancled Cancled Aquadyne Nil Returned 250 0 80 0 30 0 20 0 0 0 6 Cancled Cancled Returned
2 ### BOILER#01 26.03.2023 30.03.2023 ### 2 2.5 Aquadyne 10 27.8 222.22 10 70 4 26 1 19 0 0 2 4 0 Trial Blast
3 ### BOILER#01 26.03.2023 01.04.2023 ### 2 2.5 Aquadyne 34 186.26 136.12 25 45 12 28 4 15 0 0 2 6 0 Trial Blast
4 ### BOILER#01 04.04.2023 Not Filled Canceled Cancled Cancled Aquadyne 0 Returned 388.889 0 45 0 28 0 15 0 0 0 6 Not Placed Cancled Returned
5 ### BOILER#01 04.04.2023 06.04.2023 ### 1.5 1.75 Aquadyne 31 189.04 0 0 0 Not Placed 1.0 200 kg used by Teknow
6 ESP#01 10.04.2023 11.04.2023 ### 1.5 1.75 Aquadyne 30 161.24
### 22.24 65 5 0 0 10 0 0 0 4 4 Not Placed Blasting Done
7 BOILER#01 09.04.2023 11.04.2023 ### 1.5 1.75 Aquadyne 30 166.8

8 ### BOILER#01 14.04.2023 & 15.04.2023 ### 1.8 2 Aquadyne 34 188.889 208.34 36 44 0 0 6 9 0 0 2 6 Not Placed Blasting Done
15.04.2023

9 ### BOILER#01 14.04.2023 & Not Filled Canceled Cancled Cancled Aquadyne Nil Returned 450 0 80 0 0 0 15 0 0 0 8 Not Placed Cancled Returned
15.04.2023
10 BOILER#01 18.04.2023 21.04.2023 ### 1.8 2 Aquadyne 33 177.92
### 150 57 23 0 0 10 5 0 0 4 4 Not Placed Blasting Done
11 BOILER#01 18.04.2023 21.04.2023 ### 1.5 1.8 Aquadyne 22 122.32
12 ### ESP#01 14.04.2023 22.04.2023 ### 1.75 2 Aquadyne 33 175 Nil 35 0 0 0 5 0 0 0 4 0 Not Placed 1.025 Blasting Done
13 ### BOILER#01 22.04.2023 24.04.2023 ### 1.8 2 Aquadyne 61 175 375 65 45 0 0 11 9 0 0 2 8 Not Placed 1.19 Blasting Done
14 BOILER#01 20-25.04.2023 26.04.2023 ### 1.8 2 Aquadyne 63 311.11 Not Placed Blasting Done
26.04.2023 163.9 110 30 0 0 14 11 0 0 4 6 3.232
15 ESP#01 24.04.2023 26.04.2023 ### 1.8 2 Aquadyne 33 175 Not Placed Blasting Done
16 27.04.2023 BOILER#01 26.04.2023 27.04.2023 ### 1.8 2 Aquadyne 59 327.78 11.12 70 0 0 0 15 0 0 0 8 2 Not Placed Blasting Done
1.91
17 27.04.2023 ESP#01 26.04.2023 27.04.2023 ### 0.5/0.8 0.5/0.6 Ideal Power 100 12.5 12.5 3 m- 110 0 0 0 0 0 0 0 0 0 Not Placed Blasting Done
18 29.04.2023 BOILER#01 27-28.04.2023 29.04.2023 ### 1.8 2 Aquadyne 62 311.11 Nil 69 1 0 0 10 0 0 0 2 108 Not Placed Blasting Done
19 29.04.2023 ESP#01 26.04.2023 Not Filled Canceled Cancled Cancled Ideal Power Nil Returned 12.5 0 0 0 0 0 0 0 0 0 0 Not Placed Returned
20 BOILER#01 29.04.2023 30.04.2023 ### 1.8 2 Aquadyne 66 344.44 Not Placed Blasting Done
30.04.2023 100 117 3 0 0 19 0 0 0 4 6 1.324
21 ESP#01 27.04.2023 30.04.2023 ### 1.8 2 Aquadyne 36 155.56 Not Placed Blasting Done

22 BOILER#01 30.04.2023- 02.05.2023 ### 1.8 2 Aquadyne 98 486.12 Blasting Done


01.05.2023
02.05.2023 75 140 20 0 0 25 5 0 0 4 6 Not Placed 2.979
23 ESP#01 27.04.2023- 02.05.2023 ### 1.8 2 Aquadyne 30 163.88 Blasting Done
01.05.2023
24 BOILER#01 02.05.2023 03.05.2023 ### 1.8 2 Aquadyne 85 369.44 Blasting Done
03.05.2023 55.56 134 16 0 0 20 5 0 0 4 6 Not Placed 2.152
25 ESP#01 27.04.2023 03.05.2023 ### 1.8 2 Aquadyne 32 175 Blasting Done
26 BOILER#01 03-04.05.2023 05.05.2023 ### 1.8 2 Aquadyne 73 361.11 Blasting Done
05.05.2023 175 20 0 5M-150 0 23 2 0 0 6 4 Not Placed 1.450
27 ESP#01 03-04.05.2024 05.05.2023 ### 1.8 2 Aquadyne 77 313.89 Blasting Done
28 07.05.2023 BOILER#01 06.05.2023 07.05.2023 ### 1.8 2 Aquadyne 76 350 150 89 11 0 20 12 0 0 0 2 2 Not Placed 1.056 Blasting Done
29 08.05.2023 BOILER#01 07.05.2023 08.05.2023 ### 1.8 2 Aquadyne 101 525 Nil 12 8 5M-122 28 16 4 0 0 6 4 Not Placed 0.969 Blasting Done
30 10.05.2023 BOILER#01 08.05.2023 10.05.2023 ### 1.8 2 EXPOPRIME 77 425 375 0 20 5M-86 64 11 9 0 0 2 8 Not Placed 0.883 Blasting Done
31 BOILER#01 10.05.2023 11.05.2023 ### 1.8 2 EXPOPRIME 75 416.67 Blasting Done
11.05.2023 25 32 8 5M- 91 0 18 2 0 0 4 2 Not Placed
32 ESP#01 07.05.2023 11.05.2023 ### 1.8 2 EXPOPRIME 33 158.33 Blasting Done
33 BOILER#01 11.05.2023 12.05.2023 ### 1.8 2 EXPOPRIME 76 425 Blasting Done
12.05.2023 75 90 10 4M-25 15 20 0 0 0 4 4 Not Placed 2.104
34 ESP#01 07.05.2023 12.05.2023 ### 1.8 2 EXPOPRIME 25 100 Blasting Done

35 13.05.2023 BOILER#01 11.058.2023- 13.05.2023 ### 1.8 2 EXPOPRIME 112 550 225 101 49 4M-21 0 9 0 11 0 2 6 Not Placed 3.137 Blasting Done
12.05.2023

36 15.05.2023 BOILER#01 13.05.2023- 15.05.2023 ### 1.8 2 EXPOPRIME 61 275.22 125 71 49 0 0 0 0 10 10 2 6 Not Placed 1.21 Blasting Done
14.05.2023
37 BOILER#01 15.05.2023 16.05.2023 ### 1.8 2 EXPOPRIME 37 202.94 Blasting Done
16.05.2023 13.05.2023- 175 121 9 0 0 0 0 15 5 4 4 Not Placed
38 ESP#01 16.05.2023 ### 1.8 2 EXPOPRIME 70 222.22 Blasting Done
14.05.2023

39 19.05.2023 BOILER#01 15.05.2023- 19.05.2023 ### 1.8 2 EXPOPRIME 82 477.76 222.24 94 36 0 0 0 0 15 5 4 4 Not Placed Blasting Done
18.05.2023
20.05.2023 BOILER#01 18.05.2023 24 Blasting Done
40 20.05.2023 ### 1.8 2 EXPOPRIME 352.800 150 109 11 0 0 0 0 20 0 2 6 Not Placed
20.05.2023 ESP#01 19.05.2023 67 Blasting Done
41 22.05.2023 BOILER#01 22.05.2023 22.05.2023 ### 1.8 2 EXPOPRIME 56 188.9 11.12 65 5 0 0 0 0 8 2 2 2 Not Placed Blasting Done
2.777778
68
188.8889
68
388.889 189.04 199.849

60
58 117 325.26
118 118 327.76
328.04 328.04