Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SPECIFICATIONS : D

1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE 4"Ø


75
34
EXECUTED ACCORDING TO THE PROVISIONS OF THE C
NATIONAL PLUMBING CODE, THE NATIONAL BUILDING 4"
50 4 " SS-
CODE, AND THE RULES AND REGULATIONS OF LEGAZPI CITY, 31 SS- O FD
A B C D B LA V W C C ON
M B
ALBAY. A B C D LAV
CO
WC& B
FDCO
OM &
FCD OT
C
25
2. COORDINATE THE DRAWING WITH OTHER RELATED
3125
2000
3150
3100
3475
3125 3150 3475 A 31 FD T DN
05
4"Ø
M
DRAWINGS AND SPECIFICATIONS. THE ENGINEER/MASTER OO
SS-4" 03 E DR
M B
PLUMBER SHALL BE NOTIFIED IMMEDIATELY OF ANY 5 4"Ø
LAV
WC SS-4" 4"Ø DR
OO
DISCREPANCY FOUND HEREIN. CB
FD
CO
FD DN SERVICE AREA
CB
4"Ø
5 4"Ø
LAV CO
4"Ø
B E
ET

2000
OS 50
CO 00 CL
FD WC FD
5 20 IN 15
K-
FD

2000
L
T & B CO WA
04
3. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. OO
M
NY

4350
ANY RELOCATIONS REQUIRED FOR PROPER EXECUTION 4 LAV
WC 4 BE
DR
BA
L CO
MASTER
4 LAV LO
W

1400
CO FD E
ON OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF BEDROOM
FD SS-4" BEDROOM 03
WC CO
FD
00
57
E NB
COMMON OP L

4"Ø
THE ARCHITECT OR ENGINEER. CO FD SS-4" H AL
T&B 4"Ø ILY
CO M
00 FA
4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE DN 13
KS
3

2500
ACTUAL LOCATION DEPTHS AND INVERT ELEVATIONS OF 2'

5700
FD 00

5700
UP 36
ALL EXISTING PIPES AND STRUCTURES VERIFIED BY THE 4"Ø

2700
CONTRACTOR.
2

4"Ø
5. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL BEDROOM 04 BEDROOM 05
1

800
MAINTAIN 2% MINIMUM UNLESS OTHERWISE SPECIFIED. BEDROOM 01

3600
3 D
4"Ø
4"Ø
3

1300
4"Ø
6. SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN CB
OPEN GARDEN CB 4"Ø

1300
OPEN BELOW 4"Ø
75
ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS. 2' WALK-IN CLOSET

C 34
2' 3 10
0
A
CB A
RE 14
00
FD ICE
7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES RV SS-
4"
SE
00
50 4"
SS- DN D 25
31
AT THE SITE AND COORDINATE THE WORKS WITH THE DINING AREA LIVING AREA SEPTIC TANK
B 00 WC C
OF

3600
20 LAV

3600
SEWER EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE WC CO FDCO FD O
C
FAMILY HALL BALCONY
25 LAV 36
00
CONNECTING POINT. A 31

5000
FD
CAR PORT 4"Ø

01 CB
2
2"Ø
M
8. ALL PIPE SIZES ARE IN MILLIMETERS AND ALL DIMENSIONS PLANT BOX
OO
2 CB ER M DR
800
4"Ø ST OO
4"Ø UP BE 00
ARE IN METERS UNLESS OTHERWISE SPECIFIED. CB 4"Ø MAEDR NK 50

1550
PORCH B TA
TIC

1550
KS EP T
1 S
50 50
3200

GARDEN 00
FD OR
5 20 43 15
P
UP
CB
4"Ø
1 AR
E A C AR 4"Ø

4 00 DE
N
LIV
I NG CB
00 27 AR
PLUMBING FIXTURES 57
80
0
4"Ø
B
OC P
EN
G

AR
EA H
NG RC
NI PO
LAV LAVATORY 13
00 DI
TB
OX
UP

WC WATER CLOSER DRAIN, WASTE AND VENT LAYOUT DRAIN, WASTE AND VENT LAYOUT 3 2'
PL
AN

R DE
N
36
00 CB GA
KS KITCHEN SINK 1 GROUND FLOOR PLAN 1 GROUND FLOOR PLAN 0 4"Ø
80

FD FLOOR DRAIN P1 SCALE 1: 100 MTS P2 SCALE 1: 100 MTS


ISOMETRIC LAYOUT
2 32
00

CB CATCH BASIN 1 DRAIN, WASTE AND VENT 1


RD ROOF DRAIN P3 SCALE 1: 100 MTS

DRAIN WASTE VENT PIPE SPECIFICATION


WASTE PIPE :
FCO FLOOR CLEAN OUT USE PVC EMERALD BRAND S1000
DIRECT FROM FIXTURE - USE 2"DIA PVC PIPE
FD FLOOR DRAIN
PIPE FROM BATTERY OF FIXTURE GOING TO SEPTIC -
3000mm

INNER WALL 100MM


USE 4"DIA PVC PIPE 100mm Ø PVC SOIL
RV RELIEF VENT
PROVIDE CLEAN OUT IN EVERY END OR EVERY 10M
PIPE 100 mm CO
3000mm
10mm Ø SINGLE REBARS SPACED
@ 150 mm CENTER B.W.
DISTANCE MANHOLE MANHOLE MANHOLE
VS VENT STACK

150mm

150mm
600 150mm 1300mm 100mm 650mm 100mm 550mm 150mm

150mm
10mm HANDLE BAR
SOIL PIPE : 100mm Ø PVC SOIL PIPE
DS DOWN SPOUT
USE PVC EMERALD BRAND S1000 100 mm CO OUTER WALL 150MM
INLET
100 mm CO WATER LEVEL 10mm Ø DOUBLE REBARS
WP WASTE PIPE DIRECT FROM FIXTURE USE 3" DIA PVC PIPE OUTLET
WATER LEVEL SPACED @ 200mm

275mm
INLET
150mmØ WATER LEVEL
AND 4" DIA PVC FROM BATTERY OF FIXTURE GOINT
600

RCP

SP SOIL PIPE TO SEPTIC TANK 2% SLOPE


100mm THK .CHB W/
10mmØ REBAR
INLET
100

5- 12mmØ REINF.

1475mm
1775mm
NOTE: ALWAY PROVIDE CLEAN OUT ON EVERY END BARS B.W.
DIGESTIVE LEACHING
DIGESTIVE CHAMBER
VENT PIPE CHAMBER-2 CHAMBER

1150mm

1450mm
PROVIDE 2" DIA PVC RELIEF VENT ON WATER 500x500 500x500 500x500
CLOSET,URINAL AND LAVATORY. SECTION MANHOLE MANHOLE MANHOLE
SS SOIL STACK PIPE
600
CLEAN WATER LINE:
WS WASTE STACK PIPE USE 1/2" DIA PPR GOING TO OVERHEAD WATER TANK.
100

2% SLOPE 2% SLOPE 2% SLOPE


DOWNFEED FOR THE 2 CR WILL BE SEPARATED TO

150mm

150mm
SDP SOIL DRAIN PIPE EQUAL THE PRESSURE.
INLET

100 mm THK REINFORCED CONCRETE


600
500

USE 21" PPR FOR DISTRIBUTION BRANCHES . SLAB W/ 10mm TEMP. BARS @ 150mm O.C.
TAPPING LOCATION INLET 12mm REBARS SPACED
PLAN
OUTLET
ALWAYS PROVIDE GATE VALVE EVERY BRANCH @ 200 mm ON CENTER B.W.

PLAN SECTION

CATCH BASIN DETAILS 1 SEPTIC TANK DETAILS


1 P 5 SCALE 1: 30 MTS
P4 SCALE 1: 30 MTS

DESIGN PROFESSIONAL PROJECT TITLE OWNER : SHEET CONTENTS : APPROVED SHEET NO.

SPECIFICATIONS
..\MSEC LOGOS\MSEC.1CROP.jpg DRAIN, WASTE AND VENT LAYOUT P-1
MASTER PLUMBER PROPOSED SINGLE STOREY RESIDENTIAL BUILDING MR. & MRS. ABENILDE DWV ISOMETRIC LAYOUT
PRC NO. PTR NO. SEPTIC TANK DETAILS
TIN NO. DATE ISSUED:
CATCH BASIN DETAILS CAD BY: AR. T.L.R.
KAWA-KAWA HILL, TUBURAN LIGAO CITY
Email : msempirecosntruction@gmail.com PLACE ISSUED: LOCATION : LOT 5, CENTRAL CITY SUBDIVISION, LEGAZPI CITY, ALBAY OWNER REPRESENTATIVE CAD DATE: FEB. 2023

You might also like