Professional Documents
Culture Documents
Addendum LGSFDrawings
Addendum LGSFDrawings
Addendum LGSFDrawings
2978
7 SYNTHETIC
CARPET
EXISTING GRASS
COLUMN
EXISTING
EXISTING COLUMN
DUCT TYP.
EXISTING EXISTING
COLUMN LVL +9300 COLUMN
9124
EXISTING
PLATFORM
EXISTING TILES
9571
2950
EXISTING
COLUMN
EXISTING EXISTING EXISTING
EXISTING COLUMN COLUMN COLUMN
BUILDING
EXISTING
COLUMN
EXISTING
COLUMN
EXISTING
EXISTING EXISTING COLUMN
DUCT TYP. DUCT TYP.
EXISTING EXISTING
COLUMN 8793
COLUMN
2442
EXISTING
COLUMN
EXISTING EXISTING EXISTING
18336
EXISTING
SYNTHETIC GRASS
1. 05012024 ISSUED FOR APPROVAL
EXISTING 9290
COLUMN SL.NO. DATE ISSUE/REVISION SIGN
EXISTING EXISTING
EXISTING EXISTING COLUMN COLUMN
DUCT TYP. DUCT TYP.
LIGHT GAUGE STEEL FRAME STRUCTURE
PROJECT AT ASSAM WATER CENTER BUILDING
CLIENT FREMAA
LVL +8350
EXISTING FLOOR FINISH DETAIL N DRG NO. DRN BY. CHKD BY. SCALE
900 75
2978
GLASS OPENING
7 250
RCC WALL
150
Coping
600
EXISTING
COLUMN FLOOR SLAB
EXISTING
EXISTING C1 C2 COLUMN Existing wall
parapet
DUCT TYP.
SECTION 22
Outside
In side
900
Existing
EXISTING EXISTING Floor Level
C3 COLUMN LVL +9300 C4 COLUMN
RCC SLAB
75
EXISTING RCC WALL
900
PARAPET WALL
9124
EXISTING
PLATFORM FLOOR SLAB
B 9571
SECTION 11
2950 2 Area of Skylight
floor cut out
EXISTING
COLUMN
1415 1.13 sqm
C6 EXISTING EXISTING EXISTING
C5 EXISTING C7 COLUMN C8 COLUMN C9 COLUMN 1 1
BUILDING
EXISTING
COLUMN
900
EXISTING
COLUMN
EXISTING 900
EXISTING C10 EXISTING COLUMN
C11
DUCT TYP.
DUCT TYP.
EXISTING
2
C12 COLUMN C13
13345 EXISTING
COLUMN
PLAN OF
8793
2442
COLUMN C15 C16 COLUMN COLUMN C17
C14 EXISTING
18336
EXISTING
10929
415
1040
445
2. 05012024 ISSUED FOR APPROVAL
EXISTING 9290
COLUMN C19 SL.NO. DATE ISSUE/REVISION SIGN
EXISTING EXISTING
EXISTING C18 EXISTING COLUMN C20 COLUMN
DUCT TYP. DUCT TYP.
LIGHT GAUGE STEEL FRAME STRUCTURE
PROJECT AT ASSAM WATER CENTER BUILDING
150
900
L B H
250
1. 600x 300x 900
150
Existing parapet
wall (Brick) 5. 425x 450x 900
6. 500x 525x 900
Outside
In side
900
FLOOR SLAB
19. 1118x 429x 900
SECTION 22
20. 750x 400x 900
RCC SLAB
75
RCC WALL
900
1 1 CLIENT FREMAA
900
36350
3825 4800 7725 4110 6110 5130 4650
Structural Glazing
as per Specification
LGSF fin finished 2978
7
with ACP
2707
1 9
T3
2935
P6
P5
T4 T2
825
2
722 T4 T4 T4
8425
T1
P7
P5
P4
P6
28790
1791
3
T5 T5 T5 T5 5689 T5 T5
3550
P8
P7
P6
P5
P4
P3
P2
P1
T6 T6 T6 T6
4
4510
T7 T7
P8
P4
P5
T8 T8 T8 T8 T8
5
5040
P7
P6
P8
P5
T9
6 LIGHT GAUGE STEEL FRAME STRUCTURE
PROJECT AT ASSAM WATER CENTER BUILDING
CLIENT FREMAA
4330
P6
P7
P8
P5
P4
PROPOSED ROOF TRUSS N DRG NO. DRN BY. CHKD BY. SCALE
36350
LGSF MEMBER
3825 4800 7725 4110 6110 5130 4650
Partition Wall
R.C.C SLAB
2978
7
150
900
2720
7200
1 7
150
FLOOR SLAB
2935
901
2
1110 LINTEL
LVL +9300
4@10Ø
1200
W1
BRICK WALL
@900 MM HEIGHT
600
W1
9124
FFL
600
900
8425
DETAIL OF
1200
W1
PLATFORM SIDE
WALL
SECTION 33
600
(REEFER DETAIL D )
28790
1200
W1 9321
2950
939
250
1661
W1
5799
3 3 LGSF STRUCTURE
3550
LGSF WALL
2875
1200
W1
BRICK WALL
@900 MM HEIGHT
5975
875
2100
WALL AS PER DETAIL
3600
4
BRICK WALL
@900 MM HEIGHT
1200
W1 BRICK WALL
2800
AND ABOVE LGSF
WALL AS PER DETAIL UP TO 900 MM
HEIGHT
575
4510
900
W1
BRICK WALL W1
@900 MM HEIGHT 5130 BRICK WALL
2285
AND ABOVE LGSF
2442
1775
5 600
1204
W1
1659
1204
1574
SECTION 44
1200
1200 W1
W1 6341
W1
600
5040
1200
W1 W1
SL.NO. DATE ISSUE/REVISION SIGN
450
450
Y Y'
1200
1200
6
875
875
CLIENT FREMAA
4
1200
1200
4
4330
W1 W1
Cabin Cabin
LVL +8350 W1
BRICK WALL 15750 SEAL & SIGN. PREPARED BY.
1200
1200
1200
7
D1 R.G.BORUAH ROAD
OPPOSITE COMMERCE COLLEGE
CHANDMARI,GUWAHATI-3
WATER PROOFING TO
PHONE NO :6913903233
BE DONE ON THE
SIDE WALL CA / 2003 / 31645
36350
3825 4800 7725 4110 6110 5130 4650
LGSF Vertical Member
2978
LGSF fin finished 7
with ACP
1
1350
900
2935
RCC Mullion
Column
M8
900
7 7
M7
2 LGSF EXISTING FLOOR
RCC Mullion Vertical
Column Member CUT OUT OF SKYLIGHT
DISTRIBUTOR BARS.
9124
200 200
8425
1350 200
O 10 @150C/C.
28790
BOTH WAYS
9321 MAIN BARS.
200
RCC Mullion RCC Mullion LGSF
2950
Column Column Vertical
Member
900
M5 M6
LGSF LGSF LGSF
3 Vertical Vertical Vertical CLOSING DETAIL
Member Member Member LGSF LGSF
Vertical
Vertical
Member Member OF SKYLIGHT
3550
6 6
RCC Mullion
M9 Column
LGSF LGSF
4 Vertical Vertical
Member Member
LGSF
4510
LGSF
Vertical
Vertical
Member
Member
LGSF
8793 Vertical
Member
2442
LGSF
Vertical
17136
R.G.BORUAH ROAD
OPPOSITE COMMERCE COLLEGE
CHANDMARI,GUWAHATI-3
PHONE NO :6913903233
CA / 2003 / 31645
PROPOSED LGSF VERTICAL MEMBER POSITION N DRG NO. DRN BY. CHKD BY. SCALE
5942
Rain water Ceiling Line Window
Pipe
2550
3900
brick wall @150 mm
900
thick
SECTION 7-7
A B C D Roofing Sheet E
5655
Ceiling Line
2550
3600
900
thick
SECTION 5-5
Roofing Sheet
A B C D E F G
3825 4800 7725 4108 6112 5130
P2
P3
P4 LGSF Structure 7. 05012024 ISSUED FOR APPROVAL
Gutter P5
LGSF Deck
Rain water P6 LGSF Truss SL.NO. DATE ISSUE/REVISION SIGN
5870
6770
Pipe P7
P8
Existing Building
Window LIGHT GAUGE STEEL FRAME STRUCTURE
PROJECT AT ASSAM WATER CENTER BUILDING
Ceiling Line
2550
2550
3600
CLIENT FREMAA
brick wall
900
@150 mm thick
900
900
DRG. SECTION
36350
3825 4800 7725 4110 6110 5130 4650
1
2935
LVL +9300
W1
FCC W.T. 5 Work Station ADB
W.T. 9
1350 NISG TEAM
NISG TEAM + S.I
NISG TEAM + S.I W.T.14
FCC W.T. 9 W.T.1
+ S.I W.T.20
NISG TEAM ADB ADB
+ S.I W.T.15 W.T. 8
W.T.17
W1 1665 2374 1665
FCC W.T. 4 Work Station 3
ADB
8266
NISG TEAM + S.I NISG TEAM
W.T.2 + S.I W.T.13 W.T. 7
NISG TEAM
FCC W.T. 8 NISG TEAM
8425
ADB
NISG TEAM + S.I NISG TEAM W.T.15 W.T. 5
28790
Refreshment
2806
1775
3550
FCC W.T. 10 FCC W.T. 11 FCC W.T. 12 FCC W.T. 13 FCC W.T. 14
AADB OFFICE
1200
W1 SPACE 4 Cabin
3300
2010 2010 2010 2010 2185 ADB TEAM
2078
LEADER/DEPUTY ADB
2400
5675
FCC W.T. 15 TEAM LEADER1 Workstations 1
FCC W.T. 19 4575
3180
FCC W.T. 16 FCC W.T. 17 FCC W.T. 18
4
2806
W1
1329
1329
Cabin ADB
AADB OFFICE Workstations 2
SPACE 3
4510
3300 3175
2400
3025 1200 3058 3707 ADB TEAM
W1 Cabin Cabin Cabin LEADER/DEPUTY
1535
TEAM LEADER2 W1 W1
2806
2806
2806
3180
Cabin
CUP BOARD
AADB OFFICE
SPACE 2
2400
W1
5
1450
EXISTING AADB OFFICE W1 W1
SPACE 1
DUCT TYP. W1
2806
2806
2806
W1 Cabin
Passage
Passage
2400
Cabin
Cabin
W1
NISG TEAM + S.I
W1
SL.NO. DATE ISSUE/REVISION SIGN
TEAM Cabin
LEADER/DEPUTY Cabin
TEAM LEADER 2
2806
2806
2806
W1 W1
2806
2806
2806
FCC TEAM
NISG TEAM + S.I
TEAM Cabin
DRG. PROPOSED INTERIOR LAYOUT
Cabin
LEADER/DEPUTY LEADER/DEPUTY
TEAM LEADER1 TEAM LEADER 1
LVL +8350 W1
SEAL & SIGN. PREPARED BY.
1200
1200
7
BARTHAKUR & ASSOCIATES
R.G.BORUAH ROAD
OPPOSITE COMMERCE COLLEGE
CHANDMARI,GUWAHATI-3
PHONE NO :6913903233
CA / 2003 / 31645
36350
3825 4800 7725 4110 6110 5130 4650
LGSF Fin
(Finish with Cladding)
1
0
90
10
0
2935
DETAIL AT D
8425
SS Railing
28790
4650
3
Existing Building
3550
Deck
6125
4 4 4
4510
LGSF Deck
Existing Building
LIGHT GAUGE STEEL FRAME STRUCTURE
PROJECT AT ASSAM WATER CENTER BUILDING
6
1200
7
BARTHAKUR & ASSOCIATES
R.G.BORUAH ROAD
OPPOSITE COMMERCE COLLEGE
CHANDMARI,GUWAHATI-3
PHONE NO :6913903233
CA / 2003 / 31645
Tile 11
32
(360 x3.14x15.372)
(12 x8.58x14.76)=2.62sqm
5034
3434
1471
9
563 373
6
2540
Tile 7 Tile 8
(7.05x10)(12x2.54x5.03) (10x10)(12 x1.47x3.43)
=64.11 SQM
10000 =97.48 SQM
10000
10
96
8529
7
Tile 9
7050 10000 (12x6.84x8.53)+
42
[(360 X3.14X15.382)
1
(2x10.97x14.36)]
=37.06 SQM
440
6836 2971
1664
2950
Tile 5 Tile 6
(10x10)(2.97x.44) 6.35x7.91
Tile 3 Tile 4
(2.82X2.04) =50.23 SQM
(10x10)(2.95x1.66) 10x10
=100 SQM =92.93 SQM
=95.10 SQM
7910
10000
10000
10000
10000 10000 10000 6350
2039
710
7168 2828
Tile 10
(.60x10)+(7.17x.71) 10. 05012024 ISSUED FOR APPROVAL
=11.04 SQM
Tile 1 Tile 2 SL.NO. DATE ISSUE/REVISION SIGN
10x10 10x10
=100 SQM =100 SQM
LIGHT GAUGE STEEL FRAME STRUCTURE
PROJECT AT ASSAM WATER CENTER BUILDING
10000
10000
10000
CLIENT FREMAA
10000 10000 600
180
800 LGSF Wall
450
Brick wall
GUTTER DETAIL
SLOPE 1:15
9124
GUTTER 3
GUTTER 1
10071
GUTTER 4
2975
C
DETAIL AT C
4293
GUTTER 11
0 1
GUT 2439
TER
GUTTER 5
17136
CLIENT FREMAA
3825 4800 7725 4110 6110 5130 4650 4 5/6A LIGHT POWER POINT (LP)
7 DB
Curtain Glazing as per
Specification
8 Ceiling Light
LP
1
LP LP
2935
ADB ADB
ADB W.T.19 CF W.T.17
ADB ADB ADB
W.T.20 ADB
W.T.18 W.T.16 W.T.13
W.T.15
ADB LP
W.T.12
LP ADB
SB1 W.T.11
2 ADB
W.T. 10
LVL +9300
SB1
W1
FCC W.T. 5 Work Station ADB
W.T. 9
NISG TEAM
LP
NISG TEAM
8425
LP SB1
+ S.I W.T.16
LP
LP
NISG TEAM
NISG TEAM + S.I + S.I W.T.12
Workstations 6
W1 W.T.3
LP
Work Station 3
ADB LP
NISG TEAM NISG TEAM
W.T. 5
+ S.I W.T.18 + S.I W.T.17 CF ADB
LP
W1 CF Work Station 2
CF
CF CF ADB
W.T. 4
NISG TEAM NISG TEAM NISG TEAM NISG TEAM NISG TEAM NISG TEAM ADB
FCC W.T. 1 FCC W.T. 6 + S.I W.T.5 + S.I W.T.6 + S.I W.T.7 + S.I W.T.8 + S.I W.T.9 + S.I W.T.10 W.T.14
ADB
W1 SB1 W.T. 3
LP Work Station 1
Refreshment
3550
CF
SB1
FCC W.T. 10 FCC W.T. 11 FCC W.T. 12 FCC W.T. 13 FCC W.T. 14
W1 SB2 SB1
LP SB1 Cabin
LP
SB1
ADB TEAM
SB1
LP CF CF CF LEADER/DEPUTY CF
ADB
SB2
SB2
SB2
SB2
SB2
LP
AADB OFFICE TEAM LEADER1 Workstations 1
SPACE 3 FCC W.T. 15 FCC W.T. 19
FCC W.T. 16 FCC W.T. 17 FCC W.T. 18
CF
4
SB2
LP
SB1
CF
LP
LP
W1 CF SB1
SB2 CF
Cabin SB2 ADB CF
Workstations 2
SB1
4510
LP
LP
SB1 SB1 ADB TEAM SB1 LP
AADB OFFICE
LEADER/DEPUTY
LP
LP
SB1
SB2
LP
LP
LP
SB2
CUP BOARD
CF CF CF CF Cabin
CF
LP
SB2 SB2 SB2
LP
LP
W1 SB1 SB2
5 LP
LP SB1
SB2 SB2 SB2 CF
EXISTING AADB OFFICE W1 W1
LP
SPACE 1 CF Cabin
DUCT TYP.
SB1
SB2 W1
SB2
W1
Passage
Passage
LP
LP
LP
Cabin
12. 05012024 ISSUED FOR APPROVAL
LP
CF CF CF
LP
Cabin
5040
Cabin
SB1
SB1
CF
W1 NISG TEAM + S.I
W1
SL.NO. DATE ISSUE/REVISION SIGN
LP
FCC TEAM
SB1
TEAM SB1 SB1
LEADER/DEPUTY LEADER/DEPUTY Cabin Cabin
TEAM LEADER2 TEAM LEADER 2
LP
SB1
SB2
LP
LP
LP
W1 CF CF CF CF
W1 LIGHT GAUGE STEEL FRAME STRUCTURE
PROJECT AT ASSAM WATER CENTER BUILDING
6 SB2 SB2 SB2
LP
SB1
LP
CF
LP
LP
CF CF Cabin
6.3X4.7
LP
4330
W1 W1
SB2
SB1
LP
LP
LP
LP
Cabin
SB1
7
DB-2
LP
SB1 DB-1 BARTHAKUR & ASSOCIATES
R.G.BORUAH ROAD
OPPOSITE COMMERCE COLLEGE
CHANDMARI,GUWAHATI-3
PHONE NO :6913903233
CA / 2003 / 31645
36350
3825 4800 7725 4110 6110 5130 4650
1
2935
LVL +9300
W1
FCC W.T. 5 Work Station ADB
W.T. 9
1350 NISG TEAM
NISG TEAM + S.I
NISG TEAM + S.I W.T.14
FCC W.T. 9 W.T.1
+ S.I W.T.20
NISG TEAM ADB ADB
+ S.I W.T.15 W.T. 8
W.T.17
W1 1665 2374 1665
FCC W.T. 4 Work Station 3
ADB
8266
NISG TEAM + S.I NISG TEAM
W.T.2 + S.I W.T.13 W.T. 7
NISG TEAM
FCC W.T. 8 NISG TEAM
8425
ADB
NISG TEAM + S.I NISG TEAM W.T.15 W.T. 5
28790
Refreshment
2806
1775
3550
FCC W.T. 10 FCC W.T. 11 FCC W.T. 12 FCC W.T. 13 FCC W.T. 14
AADB OFFICE
1200
W1 SPACE 4 Cabin 11
3300
2010 2010 2010 2010 2185 ADB TEAM
2078
LEADER/DEPUTY ADB
5825
2400
FCC W.T. 15 TEAM LEADER1 Workstations 1
FCC W.T. 19 4575
3180
FCC W.T. 16 FCC W.T. 17 FCC W.T. 18
4
2806
W1
1329
1329
Cabin 12 ADB
AADB OFFICE Workstations 2
SPACE 3
4510
3300 3175
2400
3025 1200 3058 3707 ADB TEAM
W1 Cabin 3 Cabin 3 Cabin 4 LEADER/DEPUTY
1535
TEAM LEADER2 W1 W1
2806
2806
2806
3180
Cabin 13
CUP BOARD
AADB OFFICE
SPACE 2
2400
W1
5
1450
EXISTING AADB OFFICE W1 W1
SPACE 1
DUCT TYP. W1
2806
2806
2806
W1 Cabin 14
Passage
Passage
2400
Cabin 5
Cabin 6
W1
NISG TEAM + S.I
W1
SL.NO. DATE ISSUE/REVISION SIGN
TEAM Cabin 7
LEADER/DEPUTY Cabin 8
TEAM LEADER 2
2806
2806
2806
W1 W1
2806
2806
2806
FCC TEAM
NISG TEAM + S.I
TEAM Cabin 10
DRG. PROPOSED HVAC LAYOUT
Cabin 9
LEADER/DEPUTY LEADER/DEPUTY
TEAM LEADER1 TEAM LEADER 1
LVL +8350 W1
SEAL & SIGN. PREPARED BY.
1200
1200
7
BARTHAKUR & ASSOCIATES
R.G.BORUAH ROAD
OPPOSITE COMMERCE COLLEGE
CHANDMARI,GUWAHATI-3
PHONE NO :6913903233
CA / 2003 / 31645