1.govt 2772 - 30 09 2015

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
BOL, 4 lelis GOVERNMENT OF ANDHRA PRADESH WATER RESOURCES (REFORMS) DEPARTMENT Memo,No.2772/Reforms/A2/2015-- 1, Dated; 30-09-2015, Sub: Water Resources Deptt, - Filing of common applications with the nodal agency of the SLSWCC ~ Release of water permissions ~ Further instructions ~ Issued Ref:1) Proposals received from the E.N.C.(Irr.), Hyderabad for industrial water permissions to various firms 2) G.O.Ms.No.202, Industries & Commerce(INF) Department, dated:06.12,2014. poe In the reference 1" cited, the Engineer-in-Chief(Irrigation), Hyderabad has submitted the following proposals for Issuance of permissions for drawal of water:- |. M/s, Divis Laboratories Ltd., Vizianagaram District ll, M/s. Virupa Power Project Pvt. Ltd., Hyderabad. ili, M/s, Ultratech Cement Ltd., Kurnool and Anantapur. Wv. M/s. Greenply Industries Ltd., Chittoor (recently received), v. M/s. Sentini Sanitek Pvt.Ltd., W.G. Dist.(recently received). vi. M/s, RIC Agro Limited, Anantapur District. vil. M/s. Nisha Designs, Anantapur District. vill. M/s. Divis Laboratories, East Godavari District, ix. M/s. Trimex Ores Pvt. Ltd., Srikakulam District. x. M/s, VBC Fertilizers & Chemicals Limited. 2. In the reference 2" cited, Government have issued orders vide Paras-9(a) & (b) based on the decision taken by the SIPC and DIPC., the Irrigation Department will release water promptly within the 10% water quota reserved for industrial use. 3. Government after careful examination, hereby instruct i) after approval of SIPC/SLSWCC/DIPC, the Chief Engineer concerned shall permit to allocation of water for industrial use within 10% of reserved water for industrial purpose, if it does not affect ayacut as per Project design. In case of conflict with ayacut, Chief Engineer may forward the Proposal to Government for approval after giving specific recommendation and realistic and current assessment of ayacut. (ii) Release of water would be done only after fulfilling. all the conditions stipulated while giving allocation and a Proper agreement is entered between the industry and Water Resources Department for O&M as well as realization of royalty for the industry. The water royalty charges shall be levied @ Rs.5.50 per 1000 gallons with immediate effect. 4. The above instructions should be followed scrupulously. The Proposals received vide reference 1" cited are returned herewith and requested to take necessary action in the matter accordingly. ADITYA NATH DAS, PRINCIPAL SECRETARY TO GOVERNMENT. To - Uhe Engineer-in-Chief(Irrigation), Water Resources Department, Jalasoudha Buildings, Errum Manzil, A.P., Hyderabad(WEs.) All Chief Engineers in Water Resources Department. P.T.O., Copy tor The Industries & Commerce(INF) Department, The IT, ERC Department, The Commissioner of Industries, Govt, of A.P., Chirag All Lane, Hyderabad with @ request to obtain the Information from concerned Chief Engineers, The Director, Ground Water Department, BRKF Buildings, Hyderabad. The P.S, to Secretary to C.M,(GSP), The PS, to Principal Secretary to Govt.(WRD). The P.S, to Secretary to Government(WRD). The Joint Secretary to Government(T). SF/SC. //FORWARDED :: BY ORDER// LA rl Ppa OFFICER.

You might also like