Etabs 2013 13.1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LIST OF DRAWINGS

SHEET NO. SHEET TITLE

S-00 COVER SHEET

S-01 GENERAL NOTES

S-02 FLOOR FRAMING PLANS


B

A B C D E F G H I
S-03 CONCRETE COLUMN SCHEDULE (1 OF 3)
81.150 m
4.100 m 12.000 m 12.000 m 12.000 m 12.000 m 12.000 m 12.000 m 5.050 m
S-04 CONCRETE COLUMN SCHEDULE (2 OF 3)
15

F11 F12 F13 F1


F 10 4 F
15
S-05 CONCRETE COLUMN SCHEDULE (3 OF 3) F9 F1
F8 6

F1
F7

7
S-06 CONCRETE BEAM SCHEDULE

F1
F6
10.000 m

8
F19
F5

S-07 CONCRETE BEAM SCHEDULE (SEISMIC) (1 OF 6)

F20
F4

3F31
0 F32 F3F43F
F33

F21
F82F9 536
F3

S-08 CONCRETE BEAM SCHEDULE (SEISMIC) (2 OF 6) F2


F3
7

F73
2
52F6

F83F9

F22
F2F42F
F2

40
F23

F41
14

S-09 CONCRETE BEAM SCHEDULE (SEISMIC) (3 OF 6) F1

S-10 CONCRETE BEAM SCHEDULE (SEISMIC) (4 OF 6)


10.900 m

S-11 CONCRETE BEAM SCHEDULE (SEISMIC) (5 OF 6)

S-12 CONCRETE BEAM SCHEDULE (SEISMIC) (6 OF 6) F51

S-13 CONCRETE COLUMN LAYOUT (1 OF 2)


F42
13

S-14 CONCRETE COLUMN LAYOUT (2 OF 2)


5.300 m

S-15 WALL LAYOUT (1 OF 2)

S-16 WALL LAYOUT (2 OF 2) CW2


12

5.300 m

S-17 WALL REINFORCEMENT ELEVATIONS (1 OF 12)

S-18 WALL REINFORCEMENT ELEVATIONS (2 OF 12)


11

F43
S-19 WALL REINFORCEMENT ELEVATIONS (3 OF 12)
5.300 m

S-20 WALL REINFORCEMENT ELEVATIONS (4 OF 12)


F44
10

S-21 WALL REINFORCEMENT ELEVATIONS (5 OF 12)


Lc
5.300 m

S-22 WALL REINFORCEMENT ELEVATIONS (6 OF 12)

Lc BEAM HEIGHT
S-23 WALL REINFORCEMENT ELEVATIONS (7 OF 12)
L1 L2
9

F45
0.25Lc 0.25Lc B A D
S-24 WALL REINFORCEMENT ELEVATIONS (8 OF 12)
BEAM HEIGHT
6.400 m

0.2Lc 0.2Lc
S-25 WALL REINFORCEMENT ELEVATIONS (9 OF 12) B A E C D
d
h

F50

S-26 WALL REINFORCEMENT ELEVATIONS (10 OF 12)


8

d
h

S-27 WALL REINFORCEMENT ELEVATIONS (11 OF 12) G F H

S-28 WALL REINFORCEMENT ELEVATIONS (12 OF 12)


10.600 m

F G ZONE A ZONE B ZONE C ZONE B ZONE A


S-29 WALL REINFORCEMENT PLANS (1 OF 5)

NOTES:
NO DESCRIPTION DATE
A
S-30 WALL REINFORCEMENT PLANS (2 OF 5) ZONE A ZONE B ZONE C ZONE B ZONE A 1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT. 0 NEW DRAWING GENERATED 19/11/2014
7

S-31 WALL REINFORCEMENT PLANS (3 OF 5) NOTES: 4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
122.700 m

1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING. 5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.

S-32 WALL REINFORCEMENT PLANS (4 OF 5)

Typical Concrete Beam Elevation 1 Typical Concrete Beam Elevation 1S


10.600 m

S-33 WALL REINFORCEMENT PLANS (5 OF 5)


6

Lc1 Lc2
F46
10.600 m

BEAM HEIGHT BEAM HEIGHT


L1 L2 L1 L2
B A D C A B

DRAWING
d

d
h

h
5

G F
TYPICAL LAP
H F
TYPICAL LAP
F G GENERAL
DRAWING-40
NOTES - 1
10.600 m

(SEE NOTE 5) (SEE NOTE 5)

ZONE A ZONE B ZONE C ZONE B ZONE A ZONE A ZONE B ZONE C ZONE B ZONE A

STRUCTURE
NOTES:
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
4

2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.


3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.
CENTRO COMERCIAL LA MARINA
10.600 m

F49

Typical Concrete Beam Elevation 2S

PROJECT
3

Lc1 Lc2 LcN CENTRO COMERCIAL LA MARINA


10.600 m

BEAM HEIGHT BEAM HEIGHT BEAM HEIGHT


L1 L2 L1 L2 L1 L2
B A D C D C A B CLIENT
F47
2
d

d
h

CENTRO COMERCIAL LA MARINA


Width Width
10.600 m

G F F H F F H F F G
TYPICAL LAP TYPICAL LAP TYPICAL LAP
(SEE NOTE 5) (SEE NOTE 5) (SEE NOTE 5)
CONSULTANT
ZONE A ZONE B ZONE C ZONE B ZONE A ZONE A ZONE B ZONE C ZONE B ZONE A ZONE A ZONE B ZONE C ZONE B ZONE A
Depth

Depth

NOTES: F48
1

ACERO Y CONCRETO SA DE CV
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
CW1
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.

Floor Framing Plan - Base (EL. 0.000 m)


Typical Concrete Beam Elevation 3S (Scale 1:100)
PROJECT NUMBER
Beam Section-A Beam Section-B
DATE

DESIGNED BY JSBR

CHECKED BY DUP

SCALE

You might also like