Etabs 2013 13.1
Etabs 2013 13.1
Etabs 2013 13.1
A B C D E F G H I
S-03 CONCRETE COLUMN SCHEDULE (1 OF 3)
81.150 m
4.100 m 12.000 m 12.000 m 12.000 m 12.000 m 12.000 m 12.000 m 5.050 m
S-04 CONCRETE COLUMN SCHEDULE (2 OF 3)
15
F1
F7
7
S-06 CONCRETE BEAM SCHEDULE
F1
F6
10.000 m
8
F19
F5
F20
F4
3F31
0 F32 F3F43F
F33
F21
F82F9 536
F3
F73
2
52F6
F83F9
F22
F2F42F
F2
40
F23
F41
14
5.300 m
F43
S-19 WALL REINFORCEMENT ELEVATIONS (3 OF 12)
5.300 m
Lc BEAM HEIGHT
S-23 WALL REINFORCEMENT ELEVATIONS (7 OF 12)
L1 L2
9
F45
0.25Lc 0.25Lc B A D
S-24 WALL REINFORCEMENT ELEVATIONS (8 OF 12)
BEAM HEIGHT
6.400 m
0.2Lc 0.2Lc
S-25 WALL REINFORCEMENT ELEVATIONS (9 OF 12) B A E C D
d
h
F50
d
h
NOTES:
NO DESCRIPTION DATE
A
S-30 WALL REINFORCEMENT PLANS (2 OF 5) ZONE A ZONE B ZONE C ZONE B ZONE A 1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT. 0 NEW DRAWING GENERATED 19/11/2014
7
S-31 WALL REINFORCEMENT PLANS (3 OF 5) NOTES: 4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
122.700 m
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING. 5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.
Lc1 Lc2
F46
10.600 m
DRAWING
d
d
h
h
5
G F
TYPICAL LAP
H F
TYPICAL LAP
F G GENERAL
DRAWING-40
NOTES - 1
10.600 m
ZONE A ZONE B ZONE C ZONE B ZONE A ZONE A ZONE B ZONE C ZONE B ZONE A
STRUCTURE
NOTES:
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
4
F49
PROJECT
3
d
h
G F F H F F H F F G
TYPICAL LAP TYPICAL LAP TYPICAL LAP
(SEE NOTE 5) (SEE NOTE 5) (SEE NOTE 5)
CONSULTANT
ZONE A ZONE B ZONE C ZONE B ZONE A ZONE A ZONE B ZONE C ZONE B ZONE A ZONE A ZONE B ZONE C ZONE B ZONE A
Depth
Depth
NOTES: F48
1
ACERO Y CONCRETO SA DE CV
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
CW1
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.
DESIGNED BY JSBR
CHECKED BY DUP
SCALE