S. Description Submitted Checked Checked Remarks CP No.
No. by by Contractor DMRC Yes No 1. Invoice 2. Engine test Certificate 3. Alternator Test Certificate 4. DG set test Certificate 5. Fuel Tank Certificate 6. AMF panel test Certificate 7. Commissioning report 8. Load test (report) 9. Sound level test report of DG Set. The Final sound level of 75 dB (maximum) at a distance of one meter from the Acoustic enclosure as per ISO 8528 part 10 10. Certificate that Engine is provided with Residential / critical/hospital –grade silencers so as to achieve sound attenuation of more that 25dBA from the DG sets as per CPCB norms. 11. Test reports of power & control cables 12. Test reports of Relays (E/F test certificate definitely required), ACB, MCB, CT and other equipment as per BOM 13. Earthing (value of earthing) 14. Bus-bar sizing calculation for AMF panels 15. Earth strip sizing calculations as per fault current. 16. Exhaust height calculation. 17. General Arrangement drawing of DG set. 18. Layout plan for DG set. 19. Earthing layout for DG set. 20. Control Scheme of DG Set. 21. Confirmation of provision of Protection and annunciation system as per contract confirming to latest standards like BS/IEC or IS and checked by Engineer Representative. 22. Confirmation of provision of Fire safety measures for the DG AMF panel. 23. Certificate of DG sets for complying with latest CPCB guidelines. 24. Certificate of conformity of production issued by The Automotive Research Association of India