Pipelineman No.2876

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SPS-IMS-LFT-F005

Rev.00

SCOPE
Petroleum SCrvis~~ · · T est & NDE fior L"fti
t.:emncate of Thorough Exammatlon 1 ng
Equipment
This report complies with the requirements of the Lifting Operations and Lifting Equipment
ReguIat1ons
. I998
Date ofThrou2h Examination: 21/March/2023 Certificate number: ST-4694-03
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was
DAQING OILFIELD CONSTRUCTION GROUP, BASRA, IRAQ made: BLOCK 9
Identification NO Description Safe Working Load Date of next examination

MOBILE WELDER TRACTOR TELESCOPIC BOOM


120629 CRANE 3000 KG @ Minimum 20/March/2024
MANUFACTURE: XCMG Boom Length

CRANE MODEL: GSQ3.2SK2Q

MACHJNE MANUFACTURE: RONGTONG

CHASIS NO: 11250791

MACHlNE MODEL: YZDZ-80

YEAR OF MANUFACTURE: 2012

TOTAL WEIGHT: 10300 KG

REG. NO: 2876-BASRA

EXAMINED IN ACCORDING TO BS EN 474-


2:2006+A1:2008 and BS EN 7121-2-4:2013

I Tools Details I Load Cell SIN: 50-7-381 I Measuring Tape SIN: SCP-1.rOOl I Vernier Calliper SIN: SCP-lr002
NDT·DETAILS
Standard: BS EN ISO 9934-1 : YOKE S\N: 3291K Contrast Media: WHITE
Procedure: SPS-INSP-P027 Indicator: MAG INK
Result
Was the examination carried out:
ls this the first examination after installation YES NO -.J Within an interval of6 months? YES NO -.J
or assembly at a new site or location? Within an interval of12 months? YES -.J NO
If the answer to the above question is YES, In accordance with an examination
YES NO YES -.J NO
scheme?
has the equipment been installed correctly?
After the occurrence of exceptional
YES NO -.J
circumstances?
art found to have a defect which is or could become a dan er to ersons and a descri tion of the defect: None

Particulars of any tests carried out as part of the examination: (LOAD TEST & MPI)
NO

uthenticating this report:

Address: Burjesia-Tuba Area -After the Bridge Hamoud El-Wabdan


Contacts:operation@scopeps.com/sales@scopeps.com
Phone: +964 7803222202 I +964 7803773775
- ~- • - : t •
.
• 1 : ••
- •

SCOPE
Petroleum Services
Rev.00.
SPS-IMS-LFT-F015

MOBILE WELDER TRACTOR BOOM CRANE [!] . :


CHECK LIST •
Annex to certificate No: ST-4694-03 Date of Inspection: 21/March/2023

DESCRIPITION CONDITION OR REMARKS


0 GENERAL DESCRIPTION OF THE EQUIPMENT
WHEELED PAYWELDER KNUCKLE BOOM CRANE.

MANUFACfURE:XCMG
SERIAL NO : 120629
CRANE MODEL: GSQ3.2SK2Q
0.0 Description MACHINE MANUFACTURE: RONGTONG
MODEL: YZDZ-80
YEAR OF MANUFACTURE: 2012
REG. NO : 2876-BASRA

1 INCAB
1.1 Manufacturers operation manual OK
1.2 Appropriate Load Chart OK
1.3 Operator competency certificate OK
1.4 Hand Brake Interlock OK
2 H draulic s stem
2.1 Hydraulic oil level OK
2.2 Condition of oil OK
2.3 Boom cylinders OK
2.4 System and hoses OK
3 Boom section
3.1 Base section properly attached OK
3.2 Boom structure OK
3.3 Boom angle indicator OK
4 Kunckel crane
4.1 Operation of control levers OK
4.2 Emergency stop switches OK
4.3 Attachment of Knuckle to vehicle OK
5 Safety devices
5.1 Warning alarms OK
5.2 Safety equipment OK
6 Liftin ear
6.1 Correct lifting accessories Ok
6.2 Condition of lifting accessories
OK

Address: Burjesia-Tuba Area -After the Bridge Hamoud El-Wabdan


Contacts:operation@scopeps.com/sales@scopeps.com
Phone: +964 7803222202 I +964 7803773775
SCOPE
Petroleum Services
Rev.00.
SPS-1MS-LFT-F015

MOBILE WELDER TRACTOR BOOM CRANE r-1 • :


CHECK LIST a!.t
Annex to certificate No: ST-4694-03 Date of Inspection: 21/March/2023

Comment : Satisfactory

Surveyor' s: Mohamed Abdel Halim Signature:

Address: Burjesia-Tuba Area -After the Bridge Hamoud El-Wabdan


Contacts:operation@scopeps.com/sales@scopeps.com
Phone: +964 7803222202 I +964 7803773775

You might also like