SUBSTRUCTURE (PROVISIONAL)
D GROUNDWORK
Site Preparation
A m2 409 35 14,315.00
Clearing site vegetation, bushes, shrubs, undergrowth,
hedges and trees
Excavation
C m2 51 220 11,220.00
maximum depth; not exceeding 250mm deep
Trench Excavation
E m3 20 1,150 23,000.00
Excavation in rock laterite and disposal of excavated
materials as directed
F m3 28 650 18,200.00
Excavating pits (47nr), maximum depth not exceeding
2.00m
Disposal
Filling to excavations
H m3 117 190 22,230.00
Filling to excavations, average thickness exceeding
0.25m; arising from the excavations; Compacted
around foundations
Granular materials
J m2 82 750 61,500.00
Filling to make up levels, average thickness exceeding
250mm, laterite materials obtained off site.
339,715.00
Carried to Collection