ITEM DESCRIPTION UNIT QTY RATE AMOUNT

GROUP ELEMENT Nr. 1 SUBSTRUCTURE

SUBSTRUCTURE (PROVISIONAL)

D GROUNDWORK

D20 EXCAVATING AND FILLING

EXCAVATING IN NORMAL FIRM GROUND

Site Preparation

A m2 409 35 14,315.00
Clearing site vegetation, bushes, shrubs, undergrowth,
hedges and trees

Excavation

B m2 409 100 40,900.00


Excavating topsoil average 150mm deep

Reduced level excavation

C m2 51 220 11,220.00
maximum depth; not exceeding 250mm deep

Trench Excavation

D m3 184 650 119,600.00


Excavating trench width exceeding 0.30m maximum
depth not exceeding 2.00m

E m3 20 1,150 23,000.00
Excavation in rock laterite and disposal of excavated
materials as directed

Pits for concrete foundation; (47 Nr.)

F m3 28 650 18,200.00
Excavating pits (47nr), maximum depth not exceeding
2.00m
Disposal

G Excavated material; on site as m3 115 250 28,750.00


directed; in spoil maximum distance
not exceeding 50m

Filling to excavations
H m3 117 190 22,230.00
Filling to excavations, average thickness exceeding
0.25m; arising from the excavations; Compacted
around foundations

Granular materials
J m2 82 750 61,500.00
Filling to make up levels, average thickness exceeding
250mm, laterite materials obtained off site.

339,715.00