Professional Documents
Culture Documents
Proforma - A 12KW
Proforma - A 12KW
Certified that a Grid Connected SPV Power Plant of ……………….. KWp capacity has been installed at the site SHIVSRUSHTI
COMPLEX SAI SE AMBERNATH KALYAN CIRCLE - II 421501 District THANE of MAHARASHTRA which has been installed by M/S
AAKAR on …………………………………. The system is as per BIS/MNRE specifications. The system has been checked for its
performance on ………………....with installation of bi-directional meter and it is working satisfactorily.