Tyagi Ji - STP
Tyagi Ji - STP
3 Waterproofing works
4 De-watering works
8 Electrical Works
SUMMARY OF COST
WATER TREATMENT
GRAND TOTAL
pH - 7.5 – 8.5
pH - 6.0 – 8.5
BOD5 - Less than 20 Mg/L
Screen Chamber
Oil & Grease Chamber
Sewage Equalization Tank/Sump
FAB Tank. (2 Nos)
Secondary Tube Settler Tank (1 Nos)
Clarified Contact Tank
Sludge Holding Tank
Soft Water Tank (OPTIONAL)
Irrigation Water Tank
Air Blowers, Pumps & equipment
Sludge Feed Pump & Centrifuge
Piping, valves etc
Electrical Panel & Cabling
Common plant room adjacent to STP.
1.4.2 Plant room sump pump with CI body & CI impeller pump,
Solid Handling capacity should be 12-15mm
( 1W + 1 SB)
Flow rate (each) = 18 m3/hr
Head = 10 - 12 Mtr Nos. 2 72,000.00
Make: KSB / WILO / Grundfos
1.5.4 Bronze Ball valve and air dispersion grid as required for
STP as described above. Lot 1 120,000.00
1.7 Providing and fixing all piping (as described below) and
isolation control valves for making the system complete.
Capacity : 18 m3/hr
Head : 30 - 35 M Nos. 2 38,000.00
Make : Kirloskar
1.9 Supplying, installing, testing & commissioning of
Horizontal centrifugal Irrigation water transfer pumps
CI Body, CI Impeller, SS Shaft, with mechanical seal
along with Coupled motor, pressure gauge with isolation
cock, Isolation valve, NRV on delivery line. Isolation valve,
stainer at suction. Mechanical seal, suitable vibration
elimination pads of approved design. The pump shall
be suitable for 415±10% volts 3 phase AC supply. ( 1W
+ 1SB )
Note:
Operation of pump shall be based on level controller
proposed to be installed in tank as per site location. The
contractor to recheck the Head required for pumps as per
site conditions and provide accordingly.
1.12.
2 Activated Carbon Filter Nos. 1 290,000.00
Flow rate : 18 m3/hr
Dia : 1300 mm
Incoming
Bus Bar
100 amps TPN (25 KA) copper bus bar with heat shrinkable
insulation sleeves.
Outgoing
Payment Terms - 40% advance along with order, 50% against PI before material dispath, 10% after
installation and testing.
Y : 250 KLD
Amount
Amount
50,000.00
-
18,000.00
-
-
-
-
-
-
-
-
-
-
120,000.00
-
-
-
-
-
144,000.00
-
-
-
-
-
56,000.00
-
-
-
-
-
-
-
-
-
430,000.00
-
-
200,000.00
-
180,000.00
-
-
120,000.00
-
270,000.00
-
-
-
-
-
-
-
200,000.00
-
-
-
-
76,000.00
-
-
-
-
-
-
140,000.00
-
-
-
-
-
-
140,000.00
-
-
-
-
-
23,000.00
-
-
-
260,000.00
-
-
-
290,000.00
-
-
-
-
-
-
-
-
-
-
-
380,000.00
-
-
-
-
-
160,000.00
-
52,000.00
-
210,000.00
-
-
34,000.00
-
76,000.00
-
23,000.00
3,652,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
290,000.00
3,942,000.00