THE RESIDENTIAL BUILDING FOR JAYAKUMAR AT AAVARAMPALAIYAM,COIMBATORE

Second Floor Concrete Quantity

S.No Description of Work No L B D Qty Unit


Slab
Gazebo S2 One Way Slab 1.00 8.00 15.50 0.50 62.00
PathWay S4 One Way 1.00 15.50 5.25 0.50 40.69
Gazebo S1 Two Way Slab 1.00 15.50 15.50 0.50 120.13
Hall S1 Two Way 1.00 23.66 15.50 0.50 183.37
East Side Covered Terrace S3 1.00 21.63 15.50 0.50 167.59
Terrace S3 (A1'-A2) 1.00 5.00 9.50 0.54 25.65
Open Terrace S4 1.00 10.00 15.50 0.50 77.50
Entertainment Area S1 1.00 15.50 17.00 0.50 131.75
Covered Terrace West Side S3 1.00 15.50 21.50 0.54 179.96
Staircase S4 1.00 6.50 5.00 0.50 16.25
Staircase S2 1.00 8.00 5.00 0.50 20.00
Lumber Room S1 1.00 10.00 11.25 0.50 56.25
Pump room S1 1.00 15.50 8.00 0.50 62.00
PathWay S1 1.00 4.75 11.25 0.50 26.72
West Side 2' Slab 1.00 23.75 2.00 0.54 25.65
West side 1'6" Slab 1.00 22.25 1.50 0.54 18.02
North side S3 (nw) 1.00 17.00 3.00 0.54 27.54
North side S5 (nw) 1.00 12.25 2.00 0.95 23.28
North side S3 (ne) 1.00 32.33 3.00 0.54 52.37
North side S5 (ne) 1.00 16.50 2.00 0.95 31.35
East side 3' slab S3 1.00 16.25 3.00 0.54 26.33
East side 3' slab S5 1.00 9.50 2.00 0.95 18.05
East side 2' slab S3 1.00 17.75 2.00 0.54 19.17
South side S3 (se) 1.00 25.00 1.50 0.54 20.25
South side S3 (sw) 1.00 16.25 1.50 0.54 13.16
9" slab 1.00 19.25 0.75 0.54 7.80
0.00
Beam 0.00
N-S
D5-C5(RB12) 1.00 7.25 0.75 1.25 6.80
C5-B5(RB4) 1.00 19.00 0.75 1.50 21.38
B5-A5(RB6a) 1.00 18.00 0.75 1.50 20.25
C4'-B4'(RB10) 1.00 11.25 0.75 1.25 10.55
B'4'-B4' (RB11) 1.00 5.00 0.75 1.25 4.69
D4-C4 (RB12) 1.00 7.25 0.75 1.25 6.80
C4-B'4 (RB12) 1.00 6.50 0.75 1.25 6.09
B'4-B4 (RB2a) 1.00 15.00 0.75 1.50 16.88
B4-A4 (RB6a) 1.00 14.00 0.75 1.50 15.75
C3 (RB4a) 1.00 2.00 0.75 1.50 2.25
C3-B3 (RB4) 1.00 19.50 0.75 1.50 21.94
B3-A3 (RB1a) 1.00 14.25 0.75 2.00 21.38
D2-B'2 (RB6) 1.00 15.00 0.75 1.50 16.88
B'2-B2 (CB3) 0.00 0.00
B2-B'2 (RB13) 1.00 4.50 0.75 1.00 3.38
B'2-A2 (RB12a) 1.00 9.50 0.75 1.25 8.91
B1'-B'1' (RB13) 1.00 4.50 0.75 1.00 3.38
B'1'-A1' (CB1) 1.00 9.50 0.75 0.54 3.85
D1''-B'1'' (RB8) 1.00 15.50 0.75 1.25 14.53
B'1''-B1'' (RB1) 1.00 15.50 0.75 2.25 26.16
D1-B'1 (RB6) 1.00 14.25 0.75 1.50 16.03
B1-A1 (RB9) 1.00 15.50 0.75 1.25 14.53
A4',A1'',A'1(RB15) 3.00 2.00 0.75 1.50 6.75
A5,D1(CB2) 0.00
A3,B1 (Rb13a) 2.00 3.00 0.75 1.00 4.50
(Cb3) 0.00
(RB13a) B5,B5 2.00 2.00 0.75 1.00 3.00
Rb13 (d4,b5,d2) 3.00 1.50 0.75 1.00 3.38
Rb13 (c1) 1.00 2.00 0.75 1.00 1.50
RB14 (A2) 1.00 2.00 0.75 1.00 1.50
W-E 0.00
D4-D5(RB6) 1.00 14.25 0.75 1.50 16.03
D4-D3(RB6) 0.00 15.50 0.75 1.50 0.00
D2-D1''(RB6) 1.00 15.00 0.75 1.50 16.88
D1''-D1 (RB12) 1.00 8.00 0.75 1.25 7.50
C5-C4 (RB5) 1.00 15.50 0.75 1.50 17.44
C4-C3 (RB6) 1.00 16.33 0.75 1.50 18.37
B'3-B'2 (RB12) 1.00 7.42 0.75 1.25 6.95
B'2-B'1'' (RB7) 1.00 13.25 0.75 1.50 14.91
B'1''-B'1' (RB12) 1.00 8.00 0.75 1.25 7.50
B'4-B'5 (RB8) 1.00 15.50 0.75 1.25 14.53
B5-B4 (RB8a) 1.00 15.50 0.75 1.25 14.53
B4-B3 (RB6) 1.00 15.50 0.75 1.50 17.44
B5-B4 (CB2) 0.00 0.00
B4-B3 (RB1a) 1.00 15.50 0.75 2.00 23.25
B3-B1'' (RB12) 1.00 20.75 0.75 1.25 19.45
B1''-B1 (RB7) 1.00 13.13 0.75 1.50 14.77
A'3-A'2 (CB2) 0.00 0.00
A'3-A'2 (CB2) 0.00 0.00
A'2-A'1'(RB13) 1.00 5.00 0.75 1.00 3.75
A1-A2 (RB2) 1.00 26.13 0.75 1.50 29.39
A2-A3 (RB11) 1.00 8.75 0.75 1.25 8.20
A4-A5 (RB3) 1.00 15.50 0.75 1.50 17.44
Lintel Beam and SunShade

FW1 Lintel 3.00 5.50 0.75 0.75 9.28


Sunshade 3.00 4.00 1.50 0.50 9.00
V3 1.00 4.50 0.75 0.75 2.53
Sunshade 1.00 3.00 2.00 0.50 3.00
Fw1 1.00 5.50 0.75 0.75 3.09
Sunshade 1.00 4.00 2.00 0.50 4.00
Column junction 0.00
D1(viii) 1.00 1.25 0.75 1.50 1.41
D1'' (vii) 1.00 1.25 0.75 1.50 1.41
D2 (vii) 1.00 1.25 0.75 1.50 1.41
C1 (V) 1.00 1.50 0.75 1.50 1.69
C1'' (i) 1.00 2.25 0.75 2.50 4.22
C2 (iv) 1.00 1.50 0.75 1.50 1.69
D3 (Vii) 0.00 1.25 0.75 0.00
D4 (V) 1.00 1.50 0.75 1.50 1.69
D5 (ix) 1.00 1.25 0.75 1.50 1.41
C'5 (Vi) 1.00 1.50 0.75 1.50 1.69
C3 (V) 1.00 1.50 0.75 1.50 1.69
C'4 (iV) 1.00 1.50 0.75 1.50 1.69
B1''(ii) 1.00 2.25 0.75 2.25 3.80
B1(Vii) 1.00 1.25 0.75 1.50 1.41
B1'(X) 1.00 1.00 0.75 1.25 0.94
B2(X) 1.00 1.00 0.75 1.25 0.94
B3 (iv) 1.00 1.50 0.75 1.50 1.69
B4 (iv) 1.00 1.50 0.75 1.50 1.69
B5 (iv) 1.00 1.50 0.75 1.50 1.69
A1 (iii) 1.00 2.00 0.75 1.50 2.25
A2 (iii) 1.00 2.00 0.75 1.50 2.25
A3 (ix) 1.00 1.25 0.75 1.50 1.41
A4(v) 1.00 1.50 0.75 1.50 1.69
A5 (vi) 1.00 1.50 0.75 1.50 1.69
Total Quantity 2076.42 CFT
58.79 M3