24 DWMR Ark19 DST

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Resalat Project

Provision of Waste Management Services for Resalat Oilfield Development


Program

Waste Management Daily Report

Waste Management (OBM


Service: Client: IOEC
Cutting Collection)
Report No.: 24
Contract No.: 1512/5107 Contractor: IEBCO

Rig Name: DST Jack-up Rig Depth (m): 2081 Date: 8-Apr-2024

Well Name: ARK-19 Drilling Meter: 0 Hole Size: 12 1/4"

OBM CUTTINGS & WASTE

Empty Cutting Boxes: 11

Filled Cutting boxes: 0

Filled Big Bags: 0


Generated OBM Cuttings/Waste
Cuttings Volume (M3): 0

Cummulative Filled Cutting Boxes: 21

Cumm. Cuttings Volume (M3): 46.2

PERSONNEL

DESCRIPTION QTY DAILY CUMM.

SENIOR Waste Management Engineer: Morteza Parvandi 1 1 22

Junior Waste Management Engineer: Shahin Noori Nav 1 1 22

Comments

Cont. Work on Fishing, Condition Trip Performed and Low Emount of Cutting Received, Using Cutting Box is not Fully Occupied Yet, Available 10 Other Empty
Boxes.

IEBCO Rep: Morteza Parvandi IOEC Company man: Mr. Mehdi Kharaghani

Page 1

You might also like