Cost of power per kg: Save 36 Lac out of 76 Lac power budgeted, having targeted 0.569 and achieved 0.316.

To Restrict energy wastage in the FG store area. Take the lead motion sensors installation and commissonning. it will reduce
power consuption in the FG store area at least 50%.it will save 2 Lac yearly .

To improve packing machines OEE , Initiate the self-generated machine wise rejection email from Checkweire will increase
packaging machines efficiency, decrease machines waste, and minimize the chance of customer complaints.

Timely completion of the 225 kW and 205 kW solar plant projects with fulfillment of safety guidelines.

Civil floor repair supervision in accordance with user requirements.

Initiate thermography gun use for quick and accurate assessment of temperature in Electrical panels or detecting issues like
leaks in pipes . It was no physical contact with object this feature was improve safety also.

With the intention to reduce the amount of dust from the packing machine, we installed acrelic sheet at KP5 and KP8
(Hopper and multihad weigher ) which led to a 70% reduction in dust.

We provide the purchasing team with the majority of spare part make and model details for local availability checks so they
can optimize our spare part arrangement for local vendors.

After the control panel is mounted, a collapsible conveyer will move whatever is needed within the plant and provide a panel
safety guard for improved electrical safety.

Take the lead AHU identification on both panels and AHU


units in order to facilitate LOTO application and prevent any kind of accident.
To improve packing machine OEE, send a self-generated machine-
wise rejection email from Checkweire. This will enhance packaging machine efficiency, reduce machine waste, and reduce the

Civil floor repair monitoring in order to meet user requirements.


steet high must 1035

70 1380

1960 1170

21560 21.56 12870 12.87


646,800 386,100 for each high must
1,930,500 for all high must

Total battery cost 2,577,300

17

street light sever room Total


kwh 2.15
36.55 70 50 156.55
The cost of Lithium-ion battery st
373.0435

Solar 1 Solar 1 Solar 2


Hour Solar 2 Reading Total Unit S1%
Reading Gen. Unit Gen. Unit

From To 1923.81 5.89


7 8 1924.04 18 6.17 16.8 35 52%
8 9 1925.07 82 7.26 65.4 148 56%
9 10 1926.15 86 8.82 93.6 180 48%
10 11 1927.92 142 11.06 134.4 276 51%
11 12 1929.67 140 13.22 129.6 270 52%
12 13 1931.77 168 15.67 147 315 53%
13 14 1933.55 142 17.79 127.2 270 53%
14 15 1935.18 130 19.47 100.8 231 56%
15 16 1936.7 121.6 20.66 71.4 193 63%
16 17 1937.6 72 21.39 43.8 116 62%
Total Solar 1 Gen. Unit 1103.2 Total Solar 2 Gen. Unit 930 2033 54%

The cost of Lithium-ion battery starts from Rs. 25,000 to 30,000 per kilowatt-hour
225 207 8%
468 439 6
909.6 814.8 10

S2%

48%
44%
52%
49%
48%