Professional Documents
Culture Documents
09 02 2024 Tumor Tracker Laboratory Report - 20240209 - 154039
09 02 2024 Tumor Tracker Laboratory Report - 20240209 - 154039
kiosk payment
RESIDENTIAL Points Earned
JAYESH AMARNATH GUPTA BILL DATE METER STATUS CYCLE NUMBER TYPE OF SUPPLY
JAY BHIM NGR BORSA PADA RD NR POISAR DEPO 06-Feb-2024 Active 15 SINGLE PHASE
KANDIVALI WEST/near raghulila mall MUMBAI
400067 TARIFF CONNECTION DATE SANCTIONED LOAD (kW) BILL NUMBER
Mobile : 70********46 LT I (B) 05-05-2023 0.18 100041816212
Email : jaye********02@gmail.com
BILL DISTRIBUTION NO. BILLING STATUS PRESENT READING DATE PREVIOUS READING DATE
PAN :
Boriwali/Kandivali/ Regular 03-Feb-2024 03-Jan-2024
GST : 15/305/19/019/008
CA NO:153494004 Bill Month Units Consumed Current Month Bill Previous Outstanding
CONSUMPTION TREND Current year Previous year MAJOR BILL COMPONENTS (Rounded off amt)
140 FAC 0
NET OTHER(Cr) 1
105
WHEELING 4
70 ENERGY 6
NET PREV 8
35
DUTIES/TAXES 15
108
102
101
116
137
87
67
91
0
0
0
0
0
0
0
2
0 FIXED 85
Jan Dec Nov Oct Sep Aug Jul Jun May 0 0 0
0 22 44 66 88
Join us on:
IMPORTANT MESSAGE
l Please note that all important communication related to your account are being sent on 70******46
registered with us. In case of any change, do inform us immediately to avoid any inconvenience and
enjoy our uninterrupted services
l Tentative meter reading date for your FEB-24 bill is 04/03/2024
91-192
CONSOLIDATED STAMP DUTY PAID BY ORDER NO. LOA/CSD/72/2023/ Validity Period Dt. 01/07/2023 to Dt. 31/03/2025 /2955 DT. 20 JUN 2023 D866/A866/B91/S8/R866 E.&O.E.
HOW YOUR BILL WAS CALCULATED
f. Adjustments 0.00 Address: Adani Electricity, Devidas Lane, Off SVP Road, Near Devidas
(B) Net other charges in current bill (Sum of a to f) 1.16Cr Lane Telephone Exchange, Borivali West, Mumbai 400 103
Your security deposit (SD) with us r 950.00 Address: Adani Corporate House, Shantigram, Near Vaishno Devi Circle,
S. G. Highway, Khodiyar Ahmedabad, Gujarat, India-382421
Your unpaid security deposit (SD)
CIN: U74999GJ2008PLC107256
PAN: AADCD0086F
As per Electricity Supply Code, you can also opt for your own meter (adhering to BIS standars)
GSTIN: 27AADCD0086F1ZW
YOUR TARIFF STRUCTURE (EFFECTIVE FROM 01.04.2023 ) r
0 - 100 85.00 3.45 2.21 0.00 l Get 7% interest on VDS (reducing balance)
l Rs. 10/-discount per month if you opt for Paperless E-Bill. No hard
101 - 300 125.00 5.55 2.21 0.00
copy will be generated. Log on to our website
301 - 500 125.00 7.45 2.21 0.00 (www.adanielectricity.com) for more details.
>500 150.00 8.55 2.21 0.00 l As per MERC, Interest on Security Deposit is at the bank rate declared
by RBI as on 1st April of the financial year. For FY 2023-24. it is 4.25%
Above fixed charges are for single phase connections. Fixed charge of Rs.150 per month will be levied on residential
consumers availing 3 phase supply. Additional Fixed Charge of Rs. 150 per 10 kW load or part thereof above 10kW
load shall be payable.,Temporary supply consumers shall pay 1.5 times the Fixed Charges applicable for this category. l Electricity Duty as per Govt. of Maharashtra Notification No. ELD.
2016/CR[1]252/Energy-1 of 21.10-2016 ELD-2020/CR-34/Energy-1 of
Bill Days Base Days Total Units 1st Slab 2nd Slab 3rd Slab 4th Slab 14.08.2020. Tax on Sale of Electricity as per Govt. of Maharashtra
l For Cheque payments: Date of realization of cheque or 3 days from submission of cheque (whichever is earlier) shall be deemed to be the date of receipt of payment (subject to realization)
l cheque should be Account payee of local clearing and not post-dated l Mention A/C no and respective amount on back of cheque while making multiple bill payments by
single cheque
l Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.153494004