Operator: JAMES
GLENN_MLD
GLENN_MLD
1. Equipment setup, take down, and 6.00 HR 0.00 58.01 0.00 348.06
monitoring (hourly charge)
2. Haul debris - per pickup truck load - 1.00 EA 140.93 0.00 0.00 140.93
including dump fees
3. Add for HEPA filter (for negative 0.50 EA 0.00 204.83 9.12 111.54
air exhaust fan)
4. Add for personal protective 3.00 EA 0.00 39.81 11.35 130.78
equipment - Heavy duty
Pantry
1.63 SY Flooring 15.33 LF Floor Perimeter
1' 3"
1' 7"
5. Floor protection - plastic and tape - 14.67 SF 0.00 0.34 0.17 5.16
10 mil
6. HEPA Vacuuming - Detailed - 152.00 SF 0.00 0.71 0.00 107.92
(PER SF)
7. Clean the walls and ceiling 137.33 SF 0.00 0.41 0.13 56.44
8. Clean floor 14.67 SF 0.00 0.49 0.01 7.20
9. Seal the walls and ceiling with 137.33 SF 0.00 1.54 11.22 222.71
fungicidal/bacterial inhibitor - one coat
10. Containment 35.00 SF 0.00 0.95 0.53 33.78
Barrier/Airlock/Decon. Chamber
Dining Room (1)
Containment for double doors.
11. Negative air fan/Air scrubber (24 3.00 DA 0.00 70.75 0.00 212.25
hr period) - No monit.
6' 6"
Kitchen Height: 8'
1' 7" 2' 9"
6'
Pantry
3' 8"
256.00 SF Walls 92.67 SF Ceiling
348.67 SF Walls & Ceiling 92.67 SF Floor
11' 4"
4'
11'
Pantry Kitchen
10.30 SY Flooring 32.00 LF Floor Perimeter
6' 10"
6' 8"
10'
12. Floor protection - plastic and tape - 100.00 SF 0.00 0.34 1.14 35.14
10 mil
13. Containment 140.00 SF 0.00 0.95 2.13 135.13
Barrier/Airlock/Decon. Chamber
14. Containment Barrier - tension post 6.00 DA 0.00 3.35 0.00 20.10
(per day)
15. Containment 14.00 SF 0.00 0.95 0.21 13.51
Barrier/Airlock/Decon. Chamber
Containment Barrier for the ceiling once the affected drywall has been removed.
16. Peel & seal zipper - heavy duty 3.00 EA 0.00 16.45 3.59 52.94
17. Trim - Detach 12.00 LF 0.00 0.91 0.00 10.92
18. Tear out wet drywall, cleanup, bag - 12.00 SF 1.46 0.00 0.19 17.71
Cat 3
19. Dehumidifier (per 24 hr period) - 3.00 EA 0.00 73.74 0.00 221.22
70-109 ppd - No monitor.
20. Negative air fan/Air scrubber (24 3.00 DA 0.00 70.75 0.00 212.25
hr period) - No monit.
207.33 Floor Area 231.11 Total Area 618.67 Interior Wall Area
582.00 Exterior Wall Area 64.67 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
Summary
Line Item Total 2,055.90
Material Sales Tax 39.79
Recap of Taxes
Recap by Room
Recap by Category
Items Total %
CLEANING 63.50 3.03%
GENERAL DEMOLITION 158.45 7.56%
PAINTING 250.48 11.95%
WATER EXTRACTION & REMEDIATION 1,583.47 75.56%
Subtotal 2,055.90 98.10%
Material Sales Tax 39.79 1.90%
Main Level
10' 8"
4' 4"
4'
Pantry
4'
Kitchen
21' 8"
21'
10'
16' 8"
Main Level
GLENN_MLD 4/4/2024 Page: 28